201026937 六、發明說明: 【發明所屬之技術領域】 本發明係主要涉及一種以簡化的安裝可迅速組成較佳強度結 構,而支撐屋頂鋼板形成較佳防火效果之高性能屋頂鋼板隱藏咬 合式系統之創新發明者。 【先前技術】 按’如94(2005)年10月〇1日公告第124〇777號之「防火金 屬鋼板結構(一)」發明專利案,其結構如其摘要所述,包含·· 鋼架,鋼架k上層鋼架及下層鋼架,其中於上層鋼架與下層 鋼架之間並設有連結元件,削連結元件以將上、下層鋼架連二 ,以,上層鋼架對下層鋼架產生拉引力量,確保下層鋼架可承受 火警高溫,不易變形,避免建築物塌陷造成危害; 鋼板,鋼板設上層鋼板及下層鋼板,分別固定於上層鋼架上 方及上層鋼架與下層鋼架之間; 防火層,該防火層設於上層鋼板與下層鋼板之間,如此以丑 同組成本拥找火金屬峨之結構,制縣鮮之防火時^ 【發明内容】 所欲解決的技術課題:201026937 VI. Description of the Invention: [Technical Field] The present invention relates to a high performance roof steel plate hidden bite system which can quickly form a better strength structure with a simplified installation and which supports a roof steel plate to form a better fireproof effect. Innovative inventors. [Prior Art] According to the invention patent of "Fireproof Metal Steel Structure (I)", No. 124〇777, No. 124〇777, published on October 1st, 2005, the structure of which is described in the abstract, including · steel frame, Steel frame k upper steel frame and lower steel frame, wherein a connecting element is arranged between the upper steel frame and the lower steel frame, and the connecting element is cut to connect the upper and lower steel frames to the upper steel frame to the lower steel frame Pulling force is generated to ensure that the lower steel frame can withstand high temperature of fire, not easy to deform, and avoid damage caused by building collapse; steel plate and steel plate are provided with upper steel plate and lower steel plate, which are respectively fixed on the upper steel frame and the upper steel frame and the lower steel frame. In the fireproof layer, the fireproof layer is disposed between the upper steel plate and the lower steel plate, so that the structure of the metal shovel with the ugly form is formed by the ugly, and the fire prevention of the county is fresh. [Inventive content] Technical problems to be solved:
而造成施工程序上 的麻煩與組裝工時的延县,盔甘Yanxian, the helmet that caused troubles in construction procedures and assembly work hours
㈣旰踎稱的安裝施工,會造成隔件 ,不符經濟效益,為其缺點之二。 而且,由於安裝施工必須增加使用隔件結構,(4) The installation and construction of the nickname will result in a partition, which is not in line with economic benefits, and is the second disadvantage. Moreover, due to the installation and construction, it is necessary to increase the use of the spacer structure.
造成渗漏水氣的漏 201026937 洞成防水性能不佳,為其缺點之四。 層鋼板上加設之上層鋼板所用的固定螺栓 :熱漲冷縮時被拉斷,而使屋她r體結構完整性與強 '而 件結的組裝、使賭 負擔、搭接安裝的接缝處;mu結構在安裝以後的重量 冷縮拉斷峨無法有效!:梢料改/ 槐栓在熱漲 行解決之_點所在。料點改良^者’是為本發明所欲 式系板隱藏咬合 成結合安裝而達取時樣工操作,可迅速完 較佳經濟效益達成者。、’ 了降鮮件倾成本支出,具 屋頂結構的重量貞擔,而提高降低組裝以後 佳使用進步性達成者。ml構的认力與_度,具較 本發明之再一目的,係在提供一籍古极Afc jg ^ # ΐ系:組深溝斷面結構可在】層:板上= Ιΐΐί,„氣_藏咬合式扣結銜接結ί,以較佳 整齊的安裝結 防水性能達到延長使用年限之進步性者。 Λ、系Ϊ發,的,係在提供—種高性能屋頂鋼板隱藏咬合 =士成======= 定件在適當間 Μ Ϊ發Ϊ之又—目的’係在提供—種高性能顧鋼祕藏咬人 iti在底層鋼板上支撐結合上層鋼板的扣合固 •己口補強板件之結合’可進—步提高結構切強度,而達到 201026937 防火性能與防颱性能之進步性達成者。 •解決課題之技術手段: 為_上述之目的,本發_包含在下層 姚 丄的上=垂行舖設結合配 列結合於各底層口,; ^的各排固定,-侧結合組成補強支撐,將1火層舖設 ,板上,而將每一底層鋼板所配合兩片各為—半寬 i声 ^侧上折邊彎折扣合端,相對包覆於各排固定^直^上戚 t頭部組成隱藏咬合式深溝斷面之屋頂广 ==為Η型鋼,而上層鋼架則以c型;:=排 ’其中’固^件係由兩直角彎折板片在兩垂直板^上^ 2!:棋狀,Τ兩綱折板片以垂直板片背向以ί 以:扣ί二使; 結合組縱向板片靠抵”丄”型固定件垂直板片中段 【實施方式】 造内Ϊ下及ί;】ίϊί列舉—具體實施例,詳細介紹本發明之構 及其所靶達成之功能效益如后; 加、加2所示’其係包含於鋼架10上配合屋頂鋼板 ^層30、固疋件40,及補強板件50等所組成,其中; 11 ^ } 層鋼由數底層鋼板21 (如第1圖箭頭所指之底 層鋼板22 的七峰結構)配合兩片各為—半寬度的上 221刑成”、,,上層鋼板22兩侧各垂直彎折一適當高度上折邊 —,,?,,壯Ϊ型的深溝斷面結構,而在上折邊221的上端形成 列結合的成2,可相對與底層鋼板21中間溝底排 201026937 43〇〇’可鋼板21與上層鋼板22之間。 兩垂直板片相對設有圓包含由兩直角·彎折板片40在 端41 ,兩直角彎折板月4η σΡ 42,而在上端相對延伸拱狀彎折 相對結合組成垂直板片背向貼靠_形鉚結部42 使麟棋謂 如第4圖所_為|*、+、「型斷面的長條板體結構。 21先舖姓人;结構之組合可將屋頂鋼板20的底層鋼板 φ 端兩與 ,χιζ 免形成畸零尺寸,所以可省去配合隔件結構 H程序,能迅速完成結合安_彳安裝工時的縮短二3 本=降低’而沒有使鶴件結構則可節省零件備料成本^ ’ 上折當高度的 又’本發明隱藏咬合式的固定件40,結構#以鉍含卜 201026937 .示為本發贿行風雨試驗之報告書,如射表列之 ίΐ^ΐϊ有··氣密性賊驗、靜'録雜·試驗、正風壓 多項試驗’而其試以:二 J的安全性與梅☆及年 明未射聽上_续妙性,且本發 ❹ 鲁 第2圖 第3囷 第1圖.係本發明之立體示意圖。 ,本發明固定件之立體分解圖。 ”圖―:係本發明之組合剖面示意 10....鋼架 11.. 20·....屋頂鋼板 21. 221-----1折邊 222. 40....直角彎折板片 42----圓形鉚結部 40 50----補強板件 底層鋼板 扣合端 41....棋狀彎折端 ..固定件 41, 係本發明固定件之立體組合圖。 圖 12-----L層鋼架 22-----L層鋼板 3〇----防火層 ----扣結頭部Leakage caused by leaking water 201026937 The hole is not waterproof, which is the fourth disadvantage. The fixing bolts used for the upper steel plates are added to the steel plates: they are pulled off during the heat expansion and contraction, so that the structural integrity and strongness of the house and the assembly of the pieces, the gambling burden, and the joints of the lap joint are installed. The mu structure is not able to be effectively cooled after installation. The tip material is changed / the bolt is fixed in the hot rise. The material improvement point is the one that is used for the hidden occlusion of the invention and the combination of the installation and the sample operation, and can quickly complete the better economic benefit. The cost of the dewatering parts is reduced, and the weight of the roof structure is increased, and the improvement is achieved after the assembly is improved. The recognition force and _ degree of the ml structure are more important than the purpose of the present invention. The Afc jg ^ # ΐ system: the deep groove section structure of the group can be found on the layer: plate = Ιΐΐί, „气_ The occlusal splicing and splicing joints are used for the purpose of prolonging the service life of the tidying and sealing performance. Λ Ϊ Ϊ , , 系 系 系 系 系 系 系 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能 高性能====== When the fitting is in the proper position, the purpose of the — — 目的 目的 目的 目的 目的 目的 目的 目的 目的 目的 目的 目的 iti iti iti iti iti iti iti iti iti iti iti iti iti iti iti iti iti iti iti iti iti The combination of the plates can be used to improve the structural cutting strength, and achieve the progress of the 201026937 fire performance and the performance of the anti-station performance. • The technical means to solve the problem: For the above purpose, the present _ is included in the lower level Yao Yao The upper = vertical laying combination is combined with the bottom layer; ^ is fixed in each row, and the side is combined to form a reinforcing support. The fire layer is laid on the plate, and each of the bottom steel plates is matched with two pieces - Half width i sound ^ side upper fold bend discount end, relatively wrapped in each row fixed ^ ^The top of the head is composed of a hidden bite type deep trench section. The roof is wide == is a Η-shaped steel, while the upper steel frame is a c-type;:= 排' where the 'solid' is bent by two right angles in two Vertical plate ^上^ 2!: Chess-like, Τ two-section folding plate with vertical plate back facing with ί: buckle ί two; combined group longitudinal plate against the "丄" type fixing piece vertical plate middle section [实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 实施 。 It is composed of a roof steel plate layer 30, a fixing member 40, and a reinforcing plate member 50, wherein; 11 ^ } the layer steel is composed of a plurality of bottom steel plates 21 (such as the seven-peak structure of the bottom steel plate 22 indicated by the arrow in Fig. 1) In conjunction with the two pieces of the upper half of the width of the 221,", the upper layer of the steel plate 22 is bent perpendicularly at an appropriate height on the sides -,? , the deep groove section structure of the sturdy type, and the column-bonded formation 2 is formed at the upper end of the upper hem 221, and can be opposite to the bottom layer of the bottom steel plate 21 at the bottom of the 201026937 43 〇〇 ' between the steel plate 21 and the upper steel plate 22 . The two vertical plates are oppositely provided with a circle comprising two right-angled and bent plates 40 at the end 41, two right-angled bent plates of the month 4η σΡ 42, and the upper ends are relatively extended and arched and bent to form a vertical plate backing stickers. By the _-shaped rivet portion 42, the lyrics are said to be as shown in Fig. 4 as |*, +, "long-slab structure of the profile section. 21 first surnames; the combination of structures can be the bottom layer of the roof steel plate 20. The two ends of the steel plate φ and χιζ are free from the formation of a distorted size. Therefore, the H-program for the spacer structure can be omitted, and the shortening of the installation time can be quickly completed. The reduction of the second and the third is reduced = and the structure of the crane is saved. Part preparation cost ^ 'Folding up the height of the 'the hidden bite type fixing piece 40 of the present invention, the structure #以铋含卜201026937. Shows the report of the bribery test, such as the shot list ΐ ΐ ΐϊ There are · · · · · · · · · · · · · ····················································································· 2D, Fig. 1 is a perspective view of the present invention. An exploded perspective view of the fixing member of the present invention. ―: is a schematic sectional view of the present invention. 10.. Steel frame 11.. 20·.... Roof steel plate 21. 221-----1 hem 222. 40.... Right angle bent plate 42----Circular rivet joint 40 50----Reinforcing plate lower layer steel plate fastening end 41....Chess-shaped bent end.. Fixing member 41 is a three-dimensional combination diagram of the fixing member of the present invention. Figure 12-----L layer steel frame 22-----L layer steel plate 3〇----fireproof layer ---- buckle head