SU992648A1 - Method of erecting a twin-block split span bridge and erection coupling apparatus for performing same - Google Patents

Method of erecting a twin-block split span bridge and erection coupling apparatus for performing same Download PDF

Info

Publication number
SU992648A1
SU992648A1 SU813333142A SU3333142A SU992648A1 SU 992648 A1 SU992648 A1 SU 992648A1 SU 813333142 A SU813333142 A SU 813333142A SU 3333142 A SU3333142 A SU 3333142A SU 992648 A1 SU992648 A1 SU 992648A1
Authority
SU
USSR - Soviet Union
Prior art keywords
blocks
span
bridge
mounting
block
Prior art date
Application number
SU813333142A
Other languages
Russian (ru)
Inventor
Станисла Григорьевич Фоменко
Original Assignee
Всесоюзный Научно-Исследовательский Институт Транспортного Строительства (Цниис)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Научно-Исследовательский Институт Транспортного Строительства (Цниис) filed Critical Всесоюзный Научно-Исследовательский Институт Транспортного Строительства (Цниис)
Priority to SU813333142A priority Critical patent/SU992648A1/en
Application granted granted Critical
Publication of SU992648A1 publication Critical patent/SU992648A1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

Изобретение относитс  к мостостроению и может быть использовано при монтаже разрезных пролетных строений мостов с помсйцью кранов.The invention relates to bridge construction and can be used in the installation of split span structures of bridges with cranes.

Известен способ монталса разрезного пролетного строени  моста, включающий установку на дно преп тстви  качающейс  paNU, шарнирно соединенной верхним концом с передней частью пролетного строени , а также надвижку пролетного строени  с использованием т говых и тормозных лебедок Cl ) The known method of mounting the split span of the bridge, including the installation of an obstacle to the bottom of the paNU pivotally connected to the front end of the span, as well as the extension of the span using Cl and brake winches

Недостаток данного способа - значительна  трудоемкость ввиду необходимости монтажа качающейс  рамы, установки т говых тормозны: лебедок и трособлочной систеш накаточных путей, а также осуществлени  надвижки .The disadvantage of this method is considerable laboriousness due to the need to install the rocking frame, install traction brakes: winches and a cable-blocking system, as well as pulling.

Наиболее близок k предлагаемому по технической сущности и достигаемому эффекту способ монтажа разрезного двухблочного пролетного строени  моста, включающий строповку одного из блоков монтируемого пролетного строени  к установленному на одном из берегов или смонтированной части пролетного строени  моста монтажному крану, установкуClosest to k is the proposed method for mounting a split two-block span of the bridge, proposed by the technical essence and the effect achieved, including slinging one of the blocks of the mounted span to the crane mounted on one of the banks or the mounted part of the bridge span, installation

блока одним концом на опору моот, строповку к монтажному крану другого блока монтируемого пролетного строени  и установку его противоположным концом на соседнюю опору моста, а также жесткое объединение блоков межДу собой. Согласно известному способу перед установкой первого блока пролетного строени  в монтируемом пролете сооружают временную промежуточную опору,на которую устанавливают другой конец этого блока, после установки которого монтажный кран перемещают назад, гфоизвод т строповку к нему второго блока, перемещают кран на смонтированный первый блок и устанавливают второй ,блок одним концом на временную опору, а Ш)угим - на соседнюю опору моста, а после жесткого объединени  обоих блоков пролетного строени  над временной опорой последнкио разбирают 21one end of the block to support the bridge, slinging to the mounting crane of another block of the mounted span and installing it with the opposite end on the adjacent bridge support, as well as rigid combination of blocks between one another. According to a known method, before installing the first block of the span in the mounted span, a temporary intermediate support is installed on which the other end of this block is installed, after installation of which the mounting crane is moved back, the second block is attached to it, the crane is mounted on the mounted first block and the second , block one end of the temporary support, and (3) coal - on the adjacent support of the bridge, and after the rigid combination of both blocks of the superstructure above the temporary support, the last rayut 21

Известно также монтажное сцепное устройство, включающее верхнее и нижнее фиксирукхцие приспособлени , ykpenленные соответственно у верхнего и нижнего по сов стыкуемых блоков монтируемого пролетного строени . Верхнее фиксирующее приспособление выполнено в виде укрепленного на обоих блоках упоров с отверсти ми и пропущенных в эти отверсти  инвентарных ст жек, фиксируемых по месту, а нижнее фиксирующее приспособление в виде раэъемно . укрепленной снизу одного из блоков опорной балки с имеющей вырез консолью, заход щей по другой блок, снабженный разъемно укрепленной снизу его упорной балкой, опертой в плоскости выреза консоли на опорную балку через клинь  3 J. Недостаток известного способа монтажа заключаетс  в значительной трудоемкости вследствие необходимост сооружени  и последующей разборки временной промежуточной опоры и достаточно длительной подгонки блоков дл обеспечени  жесткого объединени  их Необходимость осуществлени  предварительной стыковки блоков и наличие ручных операций обусловливают повышенную трудоемкость и.звестного сцепного устройства. Цель изобретени  - снижение трудо емкости монтажа путем исключени  опе раций, по устройству и разборке в мон тируемом пролете временной промежуточной опоры и упрощени  взаимного объединени  блоков. Указанна  цель достигаетс  тем, что согласно способу монтажа разрезного двухблочного пролетного строе ни  моста, включающему строповку одного из блоков монтируемого пролетного строени , к установленному на одном из берегов или смонтированной части {1ролетного строени  моста монтажному крану, установку блока одним концом на опору моста, строповку к монтс1жному крану другого блока монтируемого пролетного строени  и установку его противоположным концом на соседнюю опору моста, жесткое объединение блоков между собой, стро повку и установку на опоры моста обо их блоков монтируемого пролетного строени  производ т одновременно с использованием дополнительного мон тажного крана,, установленного на про тивоположном берегу или смонтированной части пролетного строени , приче перед жестким объединением блоков производ т предварительную их стыкс ку с использованием монтажного сцепного устройства. В монтажном сцепном устройстве, включающем верхнее и нижнее фиксирующие приспособлени , укрепленные соответственно у верхнего и нижнего по сов стыкуемых блоков монтируемого пролетного строени , верхнее фиксирующее приспособление выполнено в виже пары штырей горизонтально укре ленных на одном из блоков и пары направл ющих под них, укрепленных н другом блоке, а нижнее фиксирующее приспособление выполнено в виде пары укрепленных с обеих сторон одного и блоков подпружиненных рычагов с захватами и пары упоров под захваты, укрепленных на другом блоке. На фиг. 1 изображен момент монтажа перед предварительной стыковкой блоков ,- на фиг. 2 - момент предварительной стыковки блоков; на фиг. 3 верхнее фиксирующее приспособление монтажного сцепного устройства в момент стыковки, вид сверху; на фиг. 4 - нижнее фиксирующее приспособление монтажного сцепного устрой- ства в момент стыковки, вид сверху. Способ монтажа разрезного двухблочного пролетного строени  моста включает одновременную строповку и установку противоположными концами на опоры 1 и 2 моста обоих блоков 3 и 4 двум  монтажными, преимущественно , консольными кранами 5 и б, расположенными на противоположных берегах или на смонтированных в боковых пролетах част х пролетного строени  моста, предварительную стыковку блоков 3 и 4 и жесткое объединение блоков 3 и 4 между собой. Предварительна  стыковка блоков осуществл етс  монтажным сцепным устройством 7, которое содержит верхнее и нижнее фиксирующие приспособлени  , укрепленные соответственно у верхнего и нижнего по са стыкуемых блоков 3 и 4 монтируемого пролетного строени . При этом верхнее фиксирующее приспособление выполнено в виде пары штырей 8, горизонтально укрепленных на одном из блоков, и пары направл ющих (не показаны) под них, укрепленных на другом блоке, а нижнее фиксирующее приспособление выполнено в виде пары укрепленных с обеих сторон одного из блоков подпружиненных с помощью пружин 9 рычагов 10 с захватами 11 и пары упоров 12, укрепленных на другом блоке. Сцепное устройство снабжено также размыкающими приспособлени ми 13, каждое из которых может быть выполнено с винтом 14, вращением которого соответствующий захват 11 подпружиненного рычага 10 выводитс  из зацеплени  с одним из упоров 12. Предварительна  навесна  стыковка блоков 3 и 4 монтируемого пролетного строени  осуществл етс  при горизонтальной сдвижке блоков путем введени  первоначально застроенных концов штырей 8 одного из блоков в направл ющие другого блока с последующей раздвижкой подпружиненных рычагов 10 первого блока торцом второго блока до зацеплени  захватов 11 обратных граней упоров 12 второго блока под действием пружин 9. При необходимости сцепное устройство 7 может быть демонтировано после жесткого объединени  блоков 3 и 4 между собой.It is also known mounting coupling device, including the upper and lower fixture attachments, ykpenenny respectively at the upper and lower matching connectable units of the spans. The upper locking device is made as reinforced on both blocks of the stops with openings and the inventory tools that are fixed in place and passed through these openings, and the lower locking device is in the form of detachable. one of the blocks of the support beam fixed below, with a cut-out console extending along the other block, equipped with a support beam detachably fixed below, supported in the plane of the console cut-out on the support beam through a wedge 3 J. The disadvantage of the known mounting method is and subsequent disassembling of the temporary intermediate support and sufficiently long fitting of the blocks to ensure their rigid integration. The need to carry out preliminary joining of the blocks Choose manual operations cause increased complexity i.zvestnogo coupling. The purpose of the invention is to reduce the labor capacity of the installation by eliminating operations on the design and disassembly of the temporary intermediate support in the monitored span and simplification of the interconnection of the blocks. This goal is achieved in that according to the method of installation of a split two-block span of a bridge, including slinging of one of the blocks of a mounted span, to an assembly crane installed on one of the banks or mounted part of the bridge span, sling to the mounting crane of another block of the mounted span and its installation on the opposite end to the adjacent bridge support, rigid combination of the blocks between them, construction and installation Patent Application in bridge about their superstructures mounted support blocks is produced concurrently with the optional mon platemaking ,, crane mounted on oppositely about shore or mounted spans, wherein before the hard blocks is produced by combining their provisional m styks ku using mounting coupling. In the mounting coupling device, including the upper and lower locking devices, fastened respectively at the upper and lower compatible blocks of the mounted span, the upper locking device is made in a pair of pins horizontally fixed on one of the blocks and a pair of guides under them the other block, and the lower locking device is made in the form of a pair of one armored on both sides and blocks of spring-loaded arms with hooks and a pair of stops for grips, reinforced another block. FIG. 1 shows the moment of installation before the preliminary docking of the blocks, - in FIG. 2 - the moment of preliminary joining of blocks; in fig. 3 top fixing device mounting mounting device at the time of docking, top view; in fig. 4 - lower locking device of the mounting hitch at the moment of docking, top view. The method of mounting the split two-block span of the bridge includes simultaneous slinging and installation of two blocks 3 and 4 on the supports 1 and 2 of the bridge of both blocks 3 and 4 with two mounting, mainly cantilever cranes 5 and b, located on the opposite banks or parts of the span that are mounted in the side spans. bridge, preliminary docking of blocks 3 and 4 and rigid combination of blocks 3 and 4 between themselves. The pre-joining of the blocks is carried out by the mounting coupling device 7, which contains upper and lower fixing devices, fixed, respectively, at the upper and lower parts of the connecting blocks 3 and 4 of the spans being mounted. The upper locking device is made in the form of a pair of pins 8, horizontally fixed on one of the blocks, and a pair of guides (not shown) under them, fixed on the other block, and the lower locking device is made in the form of a pair of reinforced on both sides of one of the blocks spring-loaded with the help of springs 9 levers 10 with grippers 11 and a pair of lugs 12 mounted on another block. The hitch is also provided with disconnecting devices 13, each of which can be made with a screw 14, the rotation of which corresponding gripper 11 of the spring-loaded lever 10 is disengaged from one of the stops 12. Pre-hinged alignment of the blocks 3 and 4 of the spans being mounted is horizontal shifting the blocks by inserting the initially built up ends of the pins 8 of one of the blocks into the guides of the other block with the subsequent sliding of the spring-loaded levers 10 of the first block with the end face the second block before the engagement of the grippers 11 of the reverse edges of the stops 12 of the second block under the action of the springs 9. If necessary, the coupling device 7 can be dismantled after rigidly combining the blocks 3 and 4 between them.

Предлагаемое техническое решение обеспечивает существенное снижение трудоемкости монтажа при необходимости перекрыти  пролета разрезным пролетным строением, масса которого превышает технические возможности имеющегос  в наличии кранового оборудовани , без сооружени  промежуточной временной опоры в монтируемом пролете при упрощении операций по взаимному объединению блоков монтируемого пролетного строени .The proposed technical solution provides a significant reduction in the laboriousness of the installation, if necessary, of spanning the span with a split span, the mass of which exceeds the technical capabilities of the existing crane equipment, without constructing an intermediate temporary support in the mounted span while simplifying operations on the mutual unification of the blocks of the superstructure being mounted.

Claims (3)

1. Способ монтажа разрезного двухблочного пролетного строени  моста, включающий строповку одного из блоков монтируемого пролетного строени  к установленному на одном из берегов или смонтированной части пролетного строени  моста монтажно -1у крану, установку блока одним концом на опору моста, строповку к монтажному крану другого блока монтируемого пролетного строени  и установку его противоположным концом на соседнюю опору моста, а также жесткое объединение блоков между собой, отличающийс  тем, что, с целью снижени  трудоемкости монтажа путем исключени  операций по устройству и разборке в монтируемом пролете временной промежуточной опоры и упрощени  взаимного объединени  блоков, строповку и установку на опоры моста обоих блоков монтируемого пролетного строени  производ т одновременно с использованием дополнительного монтажного крана,, установленного на противоположном берегу или смонтиро ванной части пролетного строени , причем перед жестким объединением блоков производ т предварительную и, стыковку с использованием монтажного сцепного устройства.1. The method of installation of a split two-block span of the bridge, including slinging one of the blocks of the mounted span to the crane mounted on one of the banks or the mounted part of the bridge span of the bridge, -1u mounting the unit, slinging to the mounting crane of the other unit mounted the superstructure and its opposite end to be installed on the adjacent bridge support, as well as rigid combination of the blocks between themselves, characterized in that, in order to reduce the labor intensity, by eliminating the operation and disassembling in the mounted span of the temporary intermediate support and simplifying the interconnection of the blocks, slinging and mounting both spans to the bridge supports both at the same time using an additional crane mounted on the opposite shore or mounted part of the span building, and prior to the rigid combination of the blocks, preliminary and docking is performed using a mounting hitch. 2. Монтажное сцепное устройство, включающее верхнее и нижнее фиксирую0 щее приспособлени , укрепленные соответственно у -верхнего и нижнего по сов стыкуекых блоков монтируемого пролетного строени , отличающеес  тем, что, с целью сниже5 ни  трудоемкости предварительной стыковки блоков, верхнее фиксирующее npif способление выполнено в виде пары штырей, горизонтально укрепленных на одном из блоков, и пары направл ющих под них, укрепленных на другом блоке, 2. Mounting hitch, including upper and lower locking fixtures, reinforced respectively at the upper and lower consistent joints of the units of the spans being mounted, characterized in that, in order to reduce the laboriousness of the preliminary joining of the blocks, the upper fixing npif is made in the form pairs of pins, horizontally reinforced on one of the blocks, and a pair of guides under them, mounted on the other block, 0 а нижнее фиксирукицее приспособление выполнено в виде пары укрепленных с обеих сторон одного из блоков подпружиненных рычагов с захватами и па5 ры упоров под захваты, укрепленных на другом блоке.0 and the lower fixture device is made in the form of a pair of spring-mounted levers fixed on both sides with grippers and a pair of stops for grips fixed on the other block. Источники информации, прин тые во внимание при экспертизеSources of information taken into account in the examination 1.Евг1 афов Г.К. Мосты на желез0 ных дорогах. М., Трансжелдориздат,1. Evg1 afov G.K. Railroad bridges. M., Transzheldorizdat, 1955, с. 564-565, рис.714в.1955, p. 564-565, rice 714b. 2.Кручинкин А.В. и др. Монтаж стальных пролетных строений мостов. М., Транспорт, 1978, с. 92 (прото5 тип).2.Kruchinkin A.V. et al. Installation of steel bridge span structures. M., Transport, 1978, p. 92 (proto5 type). 3.Авторское свидетельство СССР I 746022, кл. Е 01 D 21/00, 1972 прототип).3. Authors certificate of the USSR I 746022, cl. E 01 D 21/00, 1972 prototype).
SU813333142A 1981-09-04 1981-09-04 Method of erecting a twin-block split span bridge and erection coupling apparatus for performing same SU992648A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813333142A SU992648A1 (en) 1981-09-04 1981-09-04 Method of erecting a twin-block split span bridge and erection coupling apparatus for performing same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813333142A SU992648A1 (en) 1981-09-04 1981-09-04 Method of erecting a twin-block split span bridge and erection coupling apparatus for performing same

Publications (1)

Publication Number Publication Date
SU992648A1 true SU992648A1 (en) 1983-01-30

Family

ID=20975025

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813333142A SU992648A1 (en) 1981-09-04 1981-09-04 Method of erecting a twin-block split span bridge and erection coupling apparatus for performing same

Country Status (1)

Country Link
SU (1) SU992648A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761357A (en) * 2020-12-30 2021-05-07 北京城建集团有限责任公司 Closure method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761357A (en) * 2020-12-30 2021-05-07 北京城建集团有限责任公司 Closure method
CN112761357B (en) * 2020-12-30 2022-07-22 北京城建集团有限责任公司 Closure method

Similar Documents

Publication Publication Date Title
JP2000265417A (en) Moving timbering construction method for bridge floor slab overhang section
SU992648A1 (en) Method of erecting a twin-block split span bridge and erection coupling apparatus for performing same
CN109137747B (en) Elastic hanging bracket for large-span arch bridge girder construction
CN110468743A (en) A kind of traveling cradle and construction method for the transformation of old pier coping
JP4634917B2 (en) Mobile suspension scaffolding
JP3038163B2 (en) Overhang work equipment
CN109208906B (en) Template form removal device for building site
JP4606941B2 (en) Floor slab peeling machine and floor slab peeling method
CN106436977B (en) The mounting structure and installation method of out-hung panel
SU1030463A1 (en) Method of installation of prefabricated reinforcing beam of suspended and guy-rope bridges
RU2717445C1 (en) Middle section of guide beams of superstructure
JPS6041165B2 (en) Equipment for cantilevering bridge structures made of reinforced concrete or prestressed concrete into sections.
SU1030462A1 (en) Method of installation of prefabricated reinforcing beam of suspended and guy-rope bridges
SU1546534A1 (en) Suspension bridge and method of mounting same
KR102045173B1 (en) Apparatus for Maintenance of Bridge
CN110329428A (en) A kind of platform peculiar to vessel
GB2227266A (en) Concrete deck for panel bridge
CN219793547U (en) Road surface leveling device for road bridge construction
CN109371838B (en) Integral catwalk deflection steel frame
JPH0842133A (en) Mobile suspension type scaffold device
SU1263744A1 (en) Suspended scuffold for maintenance of bridge span structures with longitudinal and transverse beams
CN213741076U (en) Unsettled pier shaft reinforcing bar fixing device of well digging basis
NZ523674A (en) Clamp plate for casting mold sidewalls, with interlocking members projecting in opposite directions at ends of plate, and clamp magnet
CN211596426U (en) Suspension bridge beam section hoist and mount interim cable clamp
RU1788190C (en) Hooded skeleton structure