- SU1263744A1 SU1263744A1 SU843768846A SU3768846A SU1263744A1 SU 1263744 A1 SU1263744 A1 SU 1263744A1 SU 843768846 A SU843768846 A SU 843768846A SU 3768846 A SU3768846 A SU 3768846A SU 1263744 A1 SU1263744 A1 SU 1263744A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- pairs
- working platform
- panel
- longitudinal
- transverse beams
- Prior art date
Links
Abstract
ПОДВЕСНЫЕ ПОДМОСТИ ДЛЯ РЕМОНТА ПРОЛЕТНЫХ СТРОЕНИЙ МОСТОВ С ПРОДОЛЬНЫМИ и ПОПЕРЕЧНЫМИ БАЛКАМИ, включающие рабочую площадку и две пары гибких т г, закрепленных одними Концами на противоположных по фасаду моста стропах рабочей площадки, о тличающиес тем, что, с целью снижени трудоемкости ремонтных работ за счет обеспечени возможности перемещени рабочей площадки из одной панели в другую по длине пролетного строени , подмости снабжены четырьм парами переставных отклон ющих блоков, разъемно укрепленных на поперечных балках очередной ремонтируемой панели, двум парами лебедок,разъемно укрепленных на продольных балках пролетного строени с обеих сторон рабочей площадки, и дополнительными гибкими т гами, закрепленными в исходном положении наклонно одними концами на противоположных о S по фасаду моста сторонах рабочей пло (Л щадки ,а другими концами - на поперечных балках в соседней в направлении перемещени подмостей панели, причем основные гибкие т ги запассованы через соответствующие пары отклон ющих блоков и закреплены другими концами на барабанах лебедок соответстйухзщей пары.Suspended platform REPAIRING bridge spans with longitudinal and transverse beams, comprising a working platform and two pairs of flexible rods, fixed at one end to opposite the facade bridge slings working platform, on tlichayuschies in that, in order to reduce the complexity of repairs by providing the possibility of moving the working platform from one panel to another along the length of the superstructure; the scaffolds are equipped with four pairs of adjustable deflecting blocks detachably fixed on the cross beams one repaired panel, two pairs of winches detachably mounted on the longitudinal beams of the superstructure on both sides of the working platform, and additional flexible rods fixed in the initial position obliquely with one end on the opposite sides of the S across the bridge facade the ends are on the transverse beams in the panel adjacent in the direction of movement of the scaffolds, the main flexible rods being stockpiled through the respective pairs of deflecting blocks and fixed with other ends on the drums l boots of a suitable pair.
Description
Изобретение относитс к строитель ству мостов и может быть использовано при реконструкции, капитальном ремонте и эксплуатации пролетных строений мостов, в особенности внеклассных , а также при монтаже пролетных строений, Целью изобретени вл етс снижение трудоемкости ремонтных работ за счет обеспечени возможности перемещени рабочей площадки из одной пане ли в другую по длине пролетного стро ени . На фиг. схематически изображено опускание подмостей в соседнюю панель; на фиг.2 - подъем подмостей к месту работ. Подвесные подмости дл ремонта пролетных строений мостов с продольными и поперечными балками включают рабочую площадку 1 -и две пары гибких т г 2, закрепленных одними концами на противоположных по фасаду моста 3 стропах рабочей площадки 1. Подмости снабжены четырьм парами переставных отклон ющих блоков 4, разъемно укрепленных на поперечных балках 5 и 6 очередной ремонтируемой панели , двум , парами лебедок 7, разъемно укрепленных на продольных балках пролетного строени попарно с обеих сторон рабочей площадки 1, и дополнительными гибкими т гами 8, закрепленными в исходном положении наклон44 но одними концами на противоположных по фасаду моста 3 сторонах рабочей площадки , а другими конца ш на поперечных балках 6 и 9 в соседней в направле ии перемещени подмостей панели. Основные гибкие т ги 2 запасованы через соответствуюище пары отклон ющих блоков 4 и закреплены другими концами на барабанах лебедок 7 соответствующей пары. Сначала ремонт с подмостей производ т в первой панели. К обоймам 10 под поперечными балками 6 и 9 закрепл ют верхние концы стропов 8 посто нной длины, нижние концы - к соответствующим узлам 1I на подвесной площадке 1 в створе поперечных балок 6 и 9. Жесткие т ги 12 снимают. Посредством гибких т г 2 и лебедок 7 подвесную площадку 1 опускают. По мере опускани , под действием собственного веса, площадка 1 вывешиваетс на монтажных стропах посто нной длины и за счет этого перемещаетс в соседнюю панель по криволинейной траектории до вертикального положени наклонных стропов. Производ т перепасовку ослаблен ых гибких т г 2 к обоймам отклон ю1и;им блокам 4, расположенным у поперечных балок 6 и 9 на жестких т гах 12. Затем производ т ремонтные работы во второй панели, и цикл работ, по перемещению подмостей повтор ют.The invention relates to the construction of bridges and can be used in the reconstruction, overhaul and operation of bridge superstructures, especially extracurricular, as well as the installation of superstructures. The aim of the invention is to reduce the labor intensity of repair work by allowing the working platform to be moved from one panel whether in another along the span. FIG. schematically shows the lowering of the scaffolding in the adjacent panel; figure 2 - the rise of the scaffolding to the place of work. Suspended scaffolding for repairing span structures of bridges with longitudinal and transverse beams includes a working platform 1 - and two pairs of flexible pipes, 2, fixed at one end on the 3 working platform 1 opposite to the facade of the bridge. The scaffolding is equipped with four pairs of adjustable deflecting blocks 4, detachable mounted on transverse beams 5 and 6 of the next repaired panel, two, pairs of winches 7, detachably mounted on the longitudinal beams of the superstructure in pairs on both sides of the working platform 1, and additional flexible and rods 8, fixed in the initial position by inclination 44 but with one end on the opposite side of the facade of the bridge 3 sides of the working platform, and the other end of the crossbar on the transverse beams 6 and 9 in the next in the direction of movement of the scaffold panel. The main flexible rods 2 are stocked through a corresponding area of a pair of deflecting units 4 and secured with other ends on the drums of the winches 7 of the corresponding pair. First, repairs to the scaffolding are done in the first panel. The upper ends of the slings 8 of constant length are fastened to the clamps 10 under the transverse beams 6 and 9, the lower ends to the corresponding nodes 1I on the suspension platform 1 in the crossbar of the transverse beams 6 and 9. The rigid rods 12 are removed. Through flexible t g 2 and winches 7 suspended platform 1 is lowered. As it is lowered, due to its own weight, the platform 1 is hung out on mounting slings of constant length and thereby moves into the adjacent panel along a curved path to the vertical position of the slant slings. Replaced weakened flexible tg 2 to clips are deflected; blocks 4, located at transverse beams 6 and 9 on rigid thrusts 12. Then, repair work is carried out in the second panel, and the cycle of work on the scaffolding is repeated.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843768846A SU1263744A1 (en) | 1984-07-13 | 1984-07-13 | Suspended scuffold for maintenance of bridge span structures with longitudinal and transverse beams |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843768846A SU1263744A1 (en) | 1984-07-13 | 1984-07-13 | Suspended scuffold for maintenance of bridge span structures with longitudinal and transverse beams |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1263744A1 true SU1263744A1 (en) | 1986-10-15 |
Family
ID=21129956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843768846A SU1263744A1 (en) | 1984-07-13 | 1984-07-13 | Suspended scuffold for maintenance of bridge span structures with longitudinal and transverse beams |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1263744A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5014381A (en) * | 1989-09-18 | 1991-05-14 | Eddy Jack E | Rolling platform assembly |
CN103194984A (en) * | 2013-04-02 | 2013-07-10 | 武汉中交试验检测加固工程有限责任公司 | Lifting frame platform system |
-
1984
- 1984-07-13 SU SU843768846A patent/SU1263744A1/en active
Non-Patent Citations (1)
Title |
---|
Строительство мостов и труб /Под ред. Кириллова B.C. М.гТраиспорт, 1975, с.428. Справочник по ремонту мостов и труб на железных дорогах. М.:Транспорт, 1973, с.436. * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5014381A (en) * | 1989-09-18 | 1991-05-14 | Eddy Jack E | Rolling platform assembly |
CN103194984A (en) * | 2013-04-02 | 2013-07-10 | 武汉中交试验检测加固工程有限责任公司 | Lifting frame platform system |
CN103194984B (en) * | 2013-04-02 | 2016-03-30 | 武汉中交试验检测加固工程有限责任公司 | Suspension bracket plateform system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1263744A1 (en) | Suspended scuffold for maintenance of bridge span structures with longitudinal and transverse beams | |
JP3110985B2 (en) | Construction method of column capital of overhang girder bridge | |
US3608670A (en) | Scaffold tender | |
JPH06235208A (en) | Method for building upper structure in high structure | |
JP4980257B2 (en) | Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge | |
CN210288126U (en) | Novel fixed effectual bei lei piece | |
DK148042B (en) | SCRAP FOR USE IN TREATING SUPERVISORY CONSTRUCTIONS WITH LARGE SPANGE | |
JPH04353105A (en) | Erecting method for bridge girder | |
JP4080070B2 (en) | Floor slab construction method and apparatus | |
SU1715934A1 (en) | Method of hoisting ferroconcrete beam superstructures of a bridge | |
JP2000087314A (en) | Method and device for construction of floor slab | |
SU1348443A1 (en) | Arrangement for suspension mounting of bridge span structures | |
JPS5845522B2 (en) | How to build a bridge | |
CN212375713U (en) | Bridge overhauls device | |
CN108715431B (en) | T roof beam maintenance reinforced (rfd) gallows platform | |
SU610906A1 (en) | Method of replacement of bridge metal span | |
SU1101497A1 (en) | Arrangement for mounting blocks of bridge span structure | |
CN216194148U (en) | Bridge temporary support dismantling device | |
CN212670271U (en) | Device convenient to steel longeron bridge support is installed fast | |
SU863753A1 (en) | Method of erecting the split span structures of overpass | |
SU1317080A1 (en) | Metal skeleton of multispan industrial building | |
SU670523A1 (en) | Crane trestle | |
SU1222739A1 (en) | Construction of expansion with reinforcements of bridge span structure | |
SU1649016A1 (en) | Arrangement for mounting and dismantling bridge span structures | |
SU947668A1 (en) | Device for testing beam bridge span frameworks |