SU1348443A1 - Arrangement for suspension mounting of bridge span structures - Google Patents

Arrangement for suspension mounting of bridge span structures Download PDF

Info

Publication number
SU1348443A1
SU1348443A1 SU853993343A SU3993343A SU1348443A1 SU 1348443 A1 SU1348443 A1 SU 1348443A1 SU 853993343 A SU853993343 A SU 853993343A SU 3993343 A SU3993343 A SU 3993343A SU 1348443 A1 SU1348443 A1 SU 1348443A1
Authority
SU
USSR - Soviet Union
Prior art keywords
span
support
beams
truss
bridge
Prior art date
Application number
SU853993343A
Other languages
Russian (ru)
Inventor
Владимир Евгеньевич Олешкевич
Виктор Михайлович Самсонов
Николай Константинович Удалов
Original Assignee
Государственный Институт По Изысканиям И Проектированию Мостов "Ленгипротрансмост"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственный Институт По Изысканиям И Проектированию Мостов "Ленгипротрансмост" filed Critical Государственный Институт По Изысканиям И Проектированию Мостов "Ленгипротрансмост"
Priority to SU853993343A priority Critical patent/SU1348443A1/en
Application granted granted Critical
Publication of SU1348443A1 publication Critical patent/SU1348443A1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

1one

Изобретение относитс  к мосто- строительству и предназначено дл  монтажа из отдельных блоков пролетных строений автодорожных мостов с ездой поверху.The invention relates to bridge construction and is intended to be mounted from separate blocks of superstructures of road bridges with a ride on top.

Целью изобретени   вл етс  снижение трудоемкости и повьшение темпа монтажа пролетных строений мостов .The aim of the invention is to reduce the labor intensity and increase the rate of installation of bridge span structures.

Fla фиг.1 изображено устройство, вид с фасада моста в процессе монтажа пролетного строени ; на фиг.2 - разрез А-А на фиг.1; на фиг.З - разрез Б-Б на фиг.1; на фиг.4 - разрез В-В на фиг.1; на фиг.З - этапы работы устройства при монтаже пролетного строени .Fla of FIG. 1 shows the device, viewed from the facade of the bridge during the installation of the superstructure; figure 2 - section aa in figure 1; on fig.Z - section BB in figure 1; figure 4 is a section bb In figure 1; FIG. 3 shows the stages of operation of the device during the installation of the span.

Устройство включает пространст венную ферму 1, состо щую из продоль- 2о этого монтажный кран 7 убирают сThe device includes a spatial farm 1 consisting of a longitudinal assembly crane 7 that is removed from

ных балок 2 и балок 3 поперечных св зей. Ферма 1 охватывает снизу монтируемое пролетное строение 4 и укреплена на нем посредством верхних консолей 5 и роликов 6, установленных как сверху, так и снизу пролетного строени  4. На проезжей части монтируемого пролетного строени  4 установлен монтажный кран 7, выполн ющий монтаж пролетного строени  4 из блоков 8. Балки 3 поперечных св зей имеют в середине пролета монтажный стык 9, и кажда  половина балки 3 прикреплена щарниром 10 с вертикально расположенной осью вращени  к продольным балкам 2. На переднем конце продольных балок 2 установлен механизм 11 подъема с опорной балкой 12, имеющей кронщтейны 13 с опорными бащмаками 14 и вырезы 15, предназначенные дл  размещени  в них опорных частей 16 пролетного строени  4 на верху опоры моста 17. На пространственной ферме 1 установлены рабочие площадки 18.beams 2 and cross beams 3. Farm 1 spans the mounted span structure 4 from below and is fixed on it by means of upper cantilevers 5 and rollers 6 mounted both above and below the span 4. On the carriageway of the mounted span 4, a mounting crane 7 is installed that performs the installation of the span 4 of blocks 8. The beams 3 of the cross links have a mounting joint 9 in the middle of the span, and each half of the beam 3 is attached by a joint 10 with a vertical axis of rotation to the longitudinal beams 2. At the front end of the longitudinal beams 2 a lifting mechanism 11 with a support beam 12 having brackets 13 with supporting braces 14 and notches 15 for accommodating supporting parts 16 of the span 4 in them at the top of the bridge support 17. On spatial farm 1 there are working platforms 18.

Устройство работает следующим образом .The device works as follows.

Монтаж пролетного строени  4 из отдельньк блоков 8 осуществл ют краном 7, перемещающимс  по собранной части пролетного строени  4. Подачу блоков 8 под кран производ т по собранной части моста с берега.При навесной сборке пролетного строени  по мере увеличени  вылета консоли исчерпываетс  его несуща  способность в корне консоли и монтаж не может быть продолжен без поддержки этой консоли. Лл  этой цели на смонтиро30The span structure 4 is assembled from individual blocks 8 by crane 7, moving along the assembled part of the span 4. The blocks 8 are delivered to the crane along the assembled part of the bridge from the shore. When the span structure is mounted, as the console extends, its bearing capacity is exhausted. console root and installation cannot continue without the support of this console. Ll this goal on mount30

3535

консоли пролетного строени , а пр странственную ферму 1 выдвигают т чтобы ее передний конец достал до следующей оТюры 17 моста, как пок 25 зано на фиг.З. Дл  того, чтобы по н ть провисающий от собственного са конец консоли, подвижную часть механизма 11 подъема с подвешенно на его конце опорной балкой 12 по нимают в верхнее положение. При э высота подъема достаточна дл  тог чтобы опорна  балка 12 прощла над верхней частью опоры 17 моста, на торой еще не установлены опорные части 16 пролетного строени  4. Э операци  может быть выполнена, по скольку консоль пролетного строен 4 разгружена за счет отвода с нее монтажного крана 7. Опорную балку 12 механизма 11 подъема с башмака 14 устанавливают на верх опоры 17 ста по оси опорных частей 16. Мех низм 11 подъема поднимает консоль пролетного строени  4 в проектное положение (фиг.З). Монтаж пролетн строени  продолжаетс  краном 7. П ред установкой надопорного блока на верх опоры, на подферменники,у танавливают краном опорные части пролетного строени  4 и последний блок 8 этого пролета монтируют на опорными част ми 16. Механизм 11 подъема опускает пролетное строен 4 на опорные части 16. При этом о на  балка 12 разгружаетс  и подни етс  над верхом опоры 17, а ферма 1 снова повисает на роликах 6 на пролетном строении 4. Монтажный к 7 продолжает монтаж блоков 8, а пthe superstructure console, and the spatial farm 1 are advanced so that its front end reaches the next bridge 17 of the bridge, as shown in fig. 3. In order to sag from its own end of the console, the movable part of the lifting mechanism 11 with its support beam 12 suspended at its end is raised to the upper position. With e, the lifting height is sufficient for the support beam 12 to forgive above the upper part of the bridge support 17, on which the support parts 16 of the span 4 are not yet installed. This operation can be performed as the span console 4 is unloaded due to its removal crane 7. The support beam 12 of the lifting mechanism 11 from the shoe 14 is mounted on the top of the support 17 hundred along the axis of the supporting parts 16. The lifting mechanism 11 raises the console of the span 4 to the design position (FIG. 3). The installation of the span structure is continued by crane 7. Before installing the supra-block on the top of the support, on sub-axles, the supporting parts of the superstructure 4 and the last block 8 of this span are mounted on the supporting parts 16. The lifting mechanism 11 lowers the superstructure 4 on the supporting parts 16. At the same time, the beam 12 unloads and rises above the top of the support 17, and the truss 1 again hangs on the rollers 6 on the span 4. The mounting to 7 continues the installation of blocks 8, and

4040

4545

5050

5555

484432484432

ванной части пролетного строени  4 монтируют пространственную ферму 1, имеющую возможность продольного перемещени  по пролетному строению 4 посредством перекатывани  ее на роликах 6 по верхнему и нижнему по сам главных балок пролетного строени  4. При этом остаетс  полностьюThe bath part of the superstructure 4 mounts a spatial truss 1, having the possibility of longitudinal movement along the superstructure 4 by rolling it on rollers 6 along the upper and lower along the main beams of the superstructure 4. It remains completely

1Q свободной проезжа  часть монтируемого пролетного строени  4, по которой перемещаютс  кран 7 и транспортные средства, подающие блоки 8.1Q is a free passage of the part of the spans 4 being mounted along which the crane 7 is moving and the vehicles feeding the blocks 8.

В исходном положении пространст15 венной фермы 1 на консоли пролетного строени  4 (фиг.1) монтажный кран 7 ставит последний блок 8, дл  которого еще хватает несущей способности пролетного строени  4. ПослеIn the initial position of the space farm 1 on the cantilever of the span 4 (Fig. 1), the erecting crane 7 places the last block 8, for which the carrying capacity of the span 4 is still sufficient. After

00

5five

консоли пролетного строени , а пространственную ферму 1 выдвигают так, чтобы ее передний конец достал до следующей оТюры 17 моста, как пока- 5 зано на фиг.З. Дл  того, чтобы под- н ть провисающий от собственного веса конец консоли, подвижную часть механизма 11 подъема с подвешенной на его конце опорной балкой 12 поднимают в верхнее положение. При этом высота подъема достаточна дл  того, чтобы опорна  балка 12 прощла над верхней частью опоры 17 моста, на которой еще не установлены опорные части 16 пролетного строени  4. Эта операци  может быть выполнена, поскольку консоль пролетного строени  4 разгружена за счет отвода с нее монтажного крана 7. Опорную балку 12 механизма 11 подъема с башмаками 14 устанавливают на верх опоры 17 мо. ста по оси опорных частей 16. Механизм 11 подъема поднимает консоль пролетного строени  4 в проектное положение (фиг.З). Монтаж пролетного строени  продолжаетс  краном 7. Перед установкой надопорного блока 8 на верх опоры, на подферменники,устанавливают краном опорные части 16 пролетного строени  4 и последний блок 8 этого пролета монтируют над опорными част ми 16. Механизм 11 подъема опускает пролетное строение 4 на опорные части 16. При этом опорна  балка 12 разгружаетс  и поднимаетс  над верхом опоры 17, а ферма 1 снова повисает на роликах 6 на пролетном строении 4. Монтажный кран 7 продолжает монтаж блоков 8, а про0the span console, and the spatial farm 1 is advanced so that its front end reaches the next bridge 17 of the bridge, as shown in FIG. In order to raise the end of the cantilever sagging from its own weight, the movable part of the lifting mechanism 11 with the supporting beam 12 suspended at its end is lifted to the upper position. In this case, the lifting height is sufficient so that the support beam 12 forgives above the upper part of the bridge support 17, on which the support parts 16 of the span 4 are not yet installed. This operation can be performed because the console of the span 4 is unloaded due to the removal of mounting crane 7. The support beam 12 of the lifting mechanism 11 with the shoes 14 is mounted on the top of the support 17 mo. one hundred along the axis of the supporting parts 16. The lifting mechanism 11 lifts the console of the superstructure 4 to the design position (FIG. 3). Installation of the span is continued by crane 7. Before installing the supra-block 8 on the top of the support, on sub-brackets, the supports 16 of the span 4 and the last block 8 of this span are mounted on the supports 16 by the crane. The lifting mechanism 11 lowers the span 4 onto the supports 16. In this case, the support beam 12 unloads and rises above the top of the support 17, and the truss 1 again hangs on the rollers 6 on the superstructure 4. The mounting crane 7 continues the installation of the blocks 8, and the pro

5five

00

5five

странственную ферму 1 продвигают впред по мере готовности пролетного строени  4, обеспечива  наличие рабочих площадок 18 дл  рабочих, ведущих монтаж. Продвижение фермы 1 через опору 17 моста становитс  возмоным в св зи с наличием вырезов 15 в опорной балке 12 дл  опорных частей 16 пролетного строени  4 (выре зы позвол ют смещать ферму 1 вперед после подъема опорной балки 12 над верхом опоры 17 без дополнительных работ, продвига  ферму 1 вперед вместе с балкой 12); кронштейнов 13, снабженных башмаками 14, которые об спечивают прием всех нагрузок строг по оси опорных частей 16; стыков 9 в балках 3, которые позвол ют разъедин ть балки на две части; шарниров 10, вокруг которых поворачиваютс  половинки балок 3 поперечных .св зей (их устанавливают продольно относительно оси моста).the stranded farm 1 is being propelled forward as the span structure 4 is ready, ensuring the availability of working platforms 18 for workers leading the installation. Promotion of the truss 1 through the bridge support 17 becomes possible due to the presence of notches 15 in the support beam 12 for the support parts 16 of the span structure 4 (the cut-outs allow the truss 1 to move forward after lifting the support beam 12 above the top of the support 17 without additional work, advancing farm 1 forward together with beam 12); brackets 13, equipped with shoes 14, which obschivaet receiving all loads strictly along the axis of the supporting parts 16; joints 9 in beams 3, which allow the beams to be divided into two parts; the hinges 10, around which the halves of the beams 3 of the transverse links rotate (they are mounted longitudinally about the axis of the bridge).

Дл  перемещени  балок 3 поперечных св зей через опору 17 моста разбирают средний стык 9 и поворачивают половинки балок относительно щарниров 10, оставл   неразобр нны- fdn остальные балки 3 поперечных св зей , которые обеспечивают жесткость при перемещении всего устройства, Разбира  поочередно балки 3 поперечных св зей, пропускают всю пространственную ферму через опору 17 моста. Верхние консоли 5 могут быть выполнены поворотными в горизонтальной плоскости.To move the beams 3 cross-links through the bridge support 17, disassemble the middle joint 9 and rotate the halves of the beams relative to the hinges 10, leaving the remaining beams 3 cross-links to disassemble the fdn, which alternately beams 3 cross-links , pass the entire spatial farm through the support 17 of the bridge. The upper console 5 can be made rotatable in a horizontal plane.

Предлагаемое устройство обеспечивает непрерывный монтаж пролетногоThe proposed device provides continuous installation of span

Формула и Formula and

строени  по всей его длине, при этом исключаютс  разборки основных конструкций устройства и применение грузоподъемных кранов дл  перестановки устройства из пролета в пролет, что позвол ет уменьщить трудоемкость работ и увеличить темп монтажа.structures along its entire length, eliminating dismantling of the main structures of the device and the use of cranes for moving the device from one span to another, which reduces the laboriousness of the work and increases the installation rate.

зобретени acquisitions

Формула и Formula and

Claims (2)

1. Устройство дл  навесного монтажа пролетных строений мостов с ездой поверху, включающее пространственную ферму, содержащую продольные балки, объединенные поперечными св - , выполненную с возможностью продольного перемещени  по смонтированной части пролетного строени , механизм подъема, установленный на1. A device for the mounted mounting of spans of bridges with a ride on top, including a spatial farm, containing longitudinal beams, combined by transversal st - made with the possibility of longitudinal movement along the mounted part of the span, the lifting mechanism mounted on переднем конце фермы и взаимодействующий при провисании конца фермы с опорой моста посредством опорной балки, отличающеес  тем,the front end of the truss and interacting when the end of the truss is swaying with the support of the bridge by means of a support beam, characterized by что, с целью снижени  трудоемкости и повьщ1ени  темпа монтажа, продольные балки пространственной фермы расположены по боковым сторонам пролетного строени , а поперечные св зи вьшолнены в виде разъемных балок, размещенных под пролетным строением , и снабжены шарнирами в местах их присоединени  к продольным балкам пространственной фермы.that, in order to reduce labor intensity and increase the rate of installation, the longitudinal beams of an isometric truss are located on the sides of the span, and the cross-links are made in the form of detachable beams located under the span and are jointed to the longitudinal beams of an isalized truss. 2. Устройство по п.1, отличающеес  тем, что опорна  балка механизма подъема имеет кронштейны с опорными бащмаками, опирающимис  на верх опоры моста, и вы- 2. The device according to claim 1, characterized in that the support beam of the lifting mechanism has brackets with support brackets supported on the top of the bridge support and резы дл  размещени  опорных частей про.петного строени .cuts to accommodate support parts of the pro. weave structure. -- д ЛОжЗвd lol АBUT 1717 Фиг. fFIG. f 5 - Б5 B IffIff Оси еладнь/х пролетного строени Axis ead / x span W,W, 1212 фие. Jfie. J 1515 ;/; / В - вB - in г иg and 1one Ос гла8н1 1Х балок пролет ноео cmpoeHt ftOS gla8n1 1kh beams span noooo cmpoeHt ft 111111 ф(/е. tf (/ e. t ITIT тt нn ff Э-avJ-g ffgE-avJ-g ffg 1one ff Фиг. 5FIG. five
SU853993343A 1985-12-19 1985-12-19 Arrangement for suspension mounting of bridge span structures SU1348443A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853993343A SU1348443A1 (en) 1985-12-19 1985-12-19 Arrangement for suspension mounting of bridge span structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853993343A SU1348443A1 (en) 1985-12-19 1985-12-19 Arrangement for suspension mounting of bridge span structures

Publications (1)

Publication Number Publication Date
SU1348443A1 true SU1348443A1 (en) 1987-10-30

Family

ID=21211183

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853993343A SU1348443A1 (en) 1985-12-19 1985-12-19 Arrangement for suspension mounting of bridge span structures

Country Status (1)

Country Link
SU (1) SU1348443A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Патент Австрии № 333833, кл. 19 b 045, опублик. 1969. *

Similar Documents

Publication Publication Date Title
CN114808747A (en) Multifunctional bridge girder erection machine and bridge girder erection construction method
SU1348443A1 (en) Arrangement for suspension mounting of bridge span structures
US2067344A (en) Bridge span inspection and maintenance traveler
JP3110985B2 (en) Construction method of column capital of overhang girder bridge
US3608670A (en) Scaffold tender
KR101016152B1 (en) Rapid Replacement Method and Apparatus Using Pulling-Up Facility and Scaffold Truss with Wheels under the Bottom of Existing and Replacing Bridges
SU1030463A1 (en) Method of installation of prefabricated reinforcing beam of suspended and guy-rope bridges
SU1263744A1 (en) Suspended scuffold for maintenance of bridge span structures with longitudinal and transverse beams
DK148042B (en) SCRAP FOR USE IN TREATING SUPERVISORY CONSTRUCTIONS WITH LARGE SPANGE
CN216999336U (en) Self-propelled rhombic truss hanging basket
CN218431639U (en) Double-ship parallel-leaning ladder
CN216713750U (en) Cable laying running gear in subway tunnel
CN215052189U (en) Bridge girder erection machine for box girder splicing wide bridge
SU1486462A1 (en) Overhead crane track
SU885415A1 (en) Unit for mounting the members of bridge span structure
SU600076A1 (en) Cantilever-sluice crane for overhead assembling of reinforced-concrete bridges
SU1293270A1 (en) Truss-hoisting arrangement
SU1260483A1 (en) Suspension cradle
SU1239192A1 (en) Arrangement for mounting bridge span structures assembled of ribbed beams
SU1502763A1 (en) Spreadable and hoistable scaffold
SU960418A1 (en) Hoist for assembling derricks
SU1218030A1 (en) Movable scaffold
SU670523A1 (en) Crane trestle
SU1609848A1 (en) Drawbridge
SU1006563A1 (en) Metal span structure of bridge and method for installation of the same