JP4980257B2 - Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge - Google Patents

Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge Download PDF

Info

Publication number
JP4980257B2
JP4980257B2 JP2008019581A JP2008019581A JP4980257B2 JP 4980257 B2 JP4980257 B2 JP 4980257B2 JP 2008019581 A JP2008019581 A JP 2008019581A JP 2008019581 A JP2008019581 A JP 2008019581A JP 4980257 B2 JP4980257 B2 JP 4980257B2
Authority
JP
Japan
Prior art keywords
construction
block
overhanging
work vehicle
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008019581A
Other languages
Japanese (ja)
Other versions
JP2009179999A (en
Inventor
明夫 正司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oriental Shiraishi Corp
Original Assignee
Oriental Shiraishi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oriental Shiraishi Corp filed Critical Oriental Shiraishi Corp
Priority to JP2008019581A priority Critical patent/JP4980257B2/en
Publication of JP2009179999A publication Critical patent/JP2009179999A/en
Application granted granted Critical
Publication of JP4980257B2 publication Critical patent/JP4980257B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、張出し架設工法により構築されるプレストレストコンクリート橋において、橋脚の上方に位置する張出し第1ブロックの施工用架設装置およびその一部を利用した移動作業車の構築方法並びに橋梁の張出し施工方法に関する。   The present invention relates to a prestressed concrete bridge constructed by an overhanging construction method, a construction apparatus for construction of a first overhanging block located above a pier, a construction method of a mobile work vehicle using a part thereof, and a method of overhanging a bridge About.

従来、橋梁の柱頭部施工において、これまで橋脚にブラケットを設け、そのブラケットを作業床としつつ、張出し第1ブロックの荷重を支持していた。張出し第1ブロックを施工することで、その上に橋軸方向左右2台の張出し架設機を載置することが出来る。   Conventionally, in bridge column head construction, a bracket has been provided on the pier so far, and the load of the first block of extension has been supported while using the bracket as a work floor. By constructing the projecting first block, it is possible to place two projecting construction machines on the left and right in the bridge axis direction.

しかし、この方法では、ブラケットの構築に多くの時間と労力を要するという問題がある。   However, this method has a problem that it takes much time and labor to construct the bracket.

また、従来の通常の張出し架設機40は、図10上に示すように、走行レール33の上に配置される走行車輪(移動装置)10を備えた長尺の水平材41があり、前記長尺の水平材41に下部が連結された間隔をおいて平行な前部斜材39と後部斜材42の2本の斜材と、各斜材39,42の端部に固定される1本の鉛直材6を備えており、その各斜材41,42および鉛直材6の上に橋軸方向に延長する水平な縦梁4が設置されており、側面から見ると平行四辺形の枠内に鉛直材6が設けられている形態をしている。なお、図中、35は走行用車輪、36は伸縮可能な脚部である。   Further, as shown in FIG. 10, the conventional normal overhanging machine 40 has a long horizontal member 41 having a traveling wheel (moving device) 10 disposed on the traveling rail 33, and the long Two diagonal members, a front diagonal member 39 and a rear diagonal member 42, which are parallel to each other with a lower portion connected to the horizontal member 41 of the scale, and one fixed to the end portions of the diagonal members 39, 42. Vertical beams 6 extending horizontally in the direction of the bridge axis are installed on each of the diagonal members 41 and 42 and the vertical members 6, and viewed from the side, within a parallelogram frame The vertical member 6 is provided on the top. In the figure, 35 is a traveling wheel, and 36 is a leg portion that can be expanded and contracted.

これを2フレーム橋梁主桁のほぼウェブの上にそれぞれ配置し、横梁25で繋いで、橋軸方向から見て門型の形態をしている。   These are arranged almost on the web of the two-frame bridge main girder, and are connected by a horizontal beam 25 to form a gate shape when viewed from the bridge axis direction.

前記のような張出し架設機40は、橋軸方向の長さが長いために、柱頭部上に直列に2台の張出し架設機40を設置することができない。
そこで、橋脚と橋軸方向に同じ幅で柱頭部を施工し、狭い範囲に2台の張出し架設機を設置するために、一方は主構を規定幅に、他方を狭くして架設機を内部に入り組ませることが知られている(例えば特許文献1参照)。
特開2004−218316号
Since the overhanging machine 40 as described above has a long length in the bridge axis direction, it is not possible to install two overhanging machines 40 in series on the column head.
Therefore, in order to install the column heads with the same width in the bridge pier and the bridge axis direction, and install two overhanging machines in a narrow area, one of the main structure is set to the specified width and the other is narrowed to install the installation machine. It is known to be involved (see, for example, Patent Document 1).
JP 2004-218316 A

しかし、狭い柱頭部のうえに2台の主構が入り組み、作業スペースがより狭くなるという課題が残されている。また、主構幅を狭くした張出し架設機を前進させた後、規定の幅に戻さなければならないという問題がある。
本発明は前記の課題を有利に解消することができる第1ブロックの施工用架設装置およびその一部を利用した移動作業車の構築方法並びに橋梁の張出し施工方法を提供することを目的とする。
However, there remains a problem that two main structures are intricately arranged on a narrow column head and the work space becomes narrower. In addition, there is a problem that after extending the overhanging machine with a narrow main structure width, it must be returned to a specified width.
It is an object of the present invention to provide a construction apparatus for constructing a first block, a construction method for a mobile work vehicle using a part thereof, and a bridge overhang construction method that can advantageously solve the above problems.

前記の課題を有利に解決するために、第1発明の張出し第1ブロックの施工用架設装置においては、柱頭部上に仮設設置される張出し第1ブロックの施工用架設装置であって、その施工用架設装置は、柱頭部上に設置される支柱を備えていると共に、柱頭部から張出し施工方向に伸びる支持梁を備え、前記支持梁に支持され、かつ移動作業車における横梁として利用される橋軸直角方向に伸びる着脱可能な横支持梁を備え、前記横支持梁により支保工を吊り下げ支持していることを特徴とする。
また、第2発明では、第1発明の張出し第1ブロックの施工用架設装置において、前記支柱は、伸縮可能な支柱とされていることを特徴とする。
また、第3発明では、第1発明または第2発明の張出し第1ブロックの施工用架設装置により、張出し第1ブロックを施工した後、前記支保工を吊り下げ支持する前記横支持梁を、張出し第1ブロック上に移動可能に設置される移動作業車における横梁として組み込むと共に、その横梁に吊り下げ支持されている支保工以外の張出し第1ブロックの施工用架設装置の部分を撤去して横梁組み込み移動作業車とすることを特徴とする移動作業車の構築方法。
また、第4発明の橋梁の張出し施工方法においては、第1または第2発明の張出し第1ブロックの施工用架設装置により、張出し第1ブロックを施工した後、前記支保工を吊り下げ支持する前記横支持梁を、張出し第1ブロック上に移動可能に設置される移動作業車における横梁として組み込むと共に、その横梁を込んだ横梁組み込み移動作業車により、第2ブロック以降を施工することを特徴とする。
In order to advantageously solve the above-described problem, the overhanging first block construction erection device according to the first aspect of the present invention is the overhanging first block construction erection device temporarily installed on the column head, and its construction The erection apparatus includes a support column installed on the column head, a support beam extending from the column head and extending in a construction direction, supported by the support beam, and used as a lateral beam in a mobile work vehicle. A detachable lateral support beam extending in a direction perpendicular to the axis is provided, and the support is suspended and supported by the lateral support beam.
Moreover, in the 2nd invention, in the construction apparatus for construction of the 1st overhang | projection 1st invention, the said support | pillar is made into the support | pillar which can be expanded-contracted, It is characterized by the above-mentioned.
Further, in the third invention, after the construction of the overhanging first block by the construction device for construction of the overhanging first block of the first invention or the second invention, the lateral support beam for supporting the suspension is suspended. Incorporated as a transverse beam in a mobile work vehicle that is movably installed on the first block, and removed the part of the construction equipment for the construction of the first block that is not overhanging and supported by the transverse beam, and incorporated into the transverse beam A construction method of a mobile work vehicle characterized by being a mobile work vehicle.
In the bridge overhang construction method according to the fourth aspect of the present invention, the construction of the overhanging first block according to the first or second aspect of the invention is used to suspend and support the support after the construction of the first overhanging block. The lateral support beam is incorporated as a lateral beam in a mobile work vehicle that is movably installed on the overhanging first block, and the second and subsequent blocks are constructed by the lateral beam built-in mobile work vehicle incorporating the lateral beam. .

第1発明によると、柱頭部上に仮設設置される張出し第1ブロックの施工用架設装置であって、その施工用架設装置は、柱頭部上に設置される支柱を備えていると共に、柱頭部から張出し施工方向に伸びる支持梁を備え、前記支持梁に支持され、かつ移動作業車における横梁として利用される橋軸直角方向に伸びる着脱可能な横支持梁を備え、前記横支持梁により支保工を吊り下げ支持しているので、柱頭部に仮設設置した施工用架設装置により、張出し第1ブロックを施工することができる。
また、第2発明によると、伸縮可能な支柱を備えているので、移動作業車に横梁として組み込む場合に容易に、盛り替えて、組み込むことができる。
また、第3発明によると、第1発明または第2発明の張出し第1ブロックの施工用架設装置により、張出し第1ブロックを施工した後、前記支保工を吊り下げ支持する前記横支持梁を、張出し第1ブロック上に移動可能に設置される移動作業車における横梁として組み込のみ、横梁および横梁により吊り下げ支持されている支保工以外の張出し第1ブロックの施工用架設装置の部品部分を撤去して、容易に横梁組み込み移動作業車を、従来のように、狭隘な柱頭部上において、移動作業車を組み立てることなく、柱頭部および張出し第1ブロック上で構築することができる。したがって、柱頭部上および張出し第1ブロック上を有効に利用して、移動作業車を組み立てることができる。
また、第4発明によると、第1発明または第2発明の張出し第1ブロックの施工用架設装置により、張出し第1ブロックを施工した後、前記支保工を吊り下げ支持する前記横支持梁を、張出し第1ブロック上に移動可能に設置される移動作業車における横梁として組み込むと共に、その横梁を込んだ横梁組み込み移動作業車により、第2ブロック以降を施工するので、狭隘な柱頭部上において、移動作業車を組み立てることなく、柱頭部上および張出し第1ブロック上を有効に利用して、移動作業車を組み立て、第2ブロック以降を施工することができる。
According to a first aspect of the present invention, there is an overhanging first block construction erection device temporarily installed on a column head, the erection device having a column installed on the column head, and the column head A support beam extending in the overhang construction direction, and a detachable lateral support beam that is supported by the support beam and extends in a direction perpendicular to the bridge axis that is used as a lateral beam in a mobile work vehicle, and is supported by the lateral support beam. Since the suspension is supported, the overhanging first block can be constructed by the construction installation device temporarily installed on the column head.
In addition, according to the second invention, since the extendable support column is provided, it can be easily replaced and assembled when it is incorporated into a mobile work vehicle as a cross beam.
Further, according to the third invention, after the construction of the overhanging first block by the construction device for construction of the overhanging first block of the first invention or the second invention, the lateral support beam for supporting the suspension work is suspended, Removal of parts of the construction equipment for the construction of the first block of the overhanging first block other than the support work that is suspended and supported by the horizontal beam and the transverse beam only as a horizontal beam in the mobile work vehicle installed movably on the first overhanging block Thus, it is possible to easily construct the horizontal beam built-in mobile work vehicle on the column head and the projecting first block without assembling the mobile work vehicle on a narrow column head as in the prior art. Therefore, it is possible to assemble the mobile work vehicle by effectively utilizing the top of the column head and the overhanging first block.
Further, according to the fourth invention, after the construction of the overhanging first block by the construction device for construction of the overhanging first block of the first invention or the second invention, the lateral support beam for supporting the suspension work by hanging, Incorporated as a horizontal beam in a mobile work vehicle installed movably on the overhanging first block, and the second and subsequent blocks are constructed by a horizontal beam built-in mobile work vehicle that incorporates the horizontal beam, so it moves on a narrow column head Without assembling the work vehicle, the mobile work vehicle can be assembled and the second and subsequent blocks can be constructed by effectively utilizing the top of the pillar and the overhanging first block.

次に、本発明を図示の実施形態に基づいて詳細に説明する。     Next, the present invention will be described in detail based on the illustrated embodiment.

図1〜図7は、本発明の張出し第1ブロックの施工用装置1を設置するまでの工程を示すものであって、図1(a)(b)に示すように、コンクリート製橋脚にブラケット29aを介して作業足場29を設けて橋脚28を順次築造した後、橋脚28上に、図2に示すように、前記ブラケット29aを利用して柱頭部12を構築する。   FIGS. 1-7 shows the process until the installation apparatus 1 of the overhanging first block of the present invention is installed. As shown in FIGS. 1 (a) and 1 (b), a bracket is attached to a concrete pier. After the work scaffold 29 is provided via 29a and the piers 28 are sequentially built, the column head 12 is constructed on the piers 28 using the brackets 29a as shown in FIG.

次いで、図3に示すように柱頭部12上に、張出し第1ブロックの施工用装置1を、これを構成する部品を図示省略のクレーンを利用して順次吊り上げて組み立てる。   Next, as shown in FIG. 3, the overhanging first block construction device 1 is assembled on the column head 12 by sequentially lifting the components constituting the first block using a crane (not shown).

前記の張出し第1ブロックの施工用装置1は、橋軸方向に間隔をおいて配置された複数(図示の場合には、橋軸方向に間隔をおいて2本、および橋軸直角方向に間隔をおいて2本の合計4本)の下部の支柱2を備えている。その各下部の支柱2の上部には、液圧式の伸縮式ジャッキ3を備えて、伸縮式の下部の支柱2とされている。前記の伸縮式液圧ジャッキ3の下部は、下部の支柱2にボルト等により着脱可能に取付られている。前記の各下部の支柱2は、柱頭部12の平面積内に収まる位置に配置され、各下部の支柱2の下部は、柱頭部12における橋軸直角方向の両端部に位置するように配置されていると共に、柱頭部12に埋め込み固定したアンカー(アンカーナットあるいはアンカーボルト「図示を省略」)にボルトあるいはナットにより取り外し可能に設置されている。   The overhanging first block construction apparatus 1 includes a plurality of devices arranged at intervals in the bridge axis direction (in the illustrated case, two at intervals in the bridge axis direction, and at intervals in the direction perpendicular to the bridge axis). 2 and a total of 4) of the lower support columns 2 are provided. A hydraulic telescopic jack 3 is provided on the upper portion of each lower support column 2 to form an expandable lower support column 2. The lower part of the telescopic hydraulic jack 3 is detachably attached to the lower support column 2 with bolts or the like. The lower struts 2 are arranged at positions that fit within the plane area of the column head 12, and the lower portions of the lower struts 2 are arranged at both ends of the column head 12 in the direction perpendicular to the bridge axis. In addition, an anchor (anchor nut or anchor bolt “not shown”) embedded and fixed in the column head 12 is detachably installed with a bolt or nut.

橋軸直角方向の両側の2本の下部の支柱2上部の前記伸縮式ジャッキ3に渡って、下弦材として橋軸方向に延長する支持梁5が架設固定され、前記の橋軸直角方向に隣り合う支持梁5には、前記伸縮式ジャッキ3の鉛直上において、それぞれ上部の支柱7が立設されてその下部が着脱可能に固定され、橋軸方向に隣り合う各上部の支柱7の上部相互は上部連結材8により連結され、また、上部の支柱7の上端部と支持梁5の先端部とは、形鋼等の鋼材からなる斜材9により連結され、さらに上部の支柱7と下部の支柱2とは、ブレース11により連結されて、側部フレーム13が構成されている。   A support beam 5 extending in the bridge axis direction as a lower chord material is installed and fixed over the telescopic jack 3 on the upper part of the two lower support columns 2 on both sides in the bridge axis perpendicular direction, and adjacent to the bridge axis perpendicular direction. In the supporting beam 5, an upper support column 7 is erected in the vertical direction of the telescopic jack 3 and its lower part is detachably fixed, and the upper support columns 7 adjacent to each other in the bridge axis direction are connected to each other. Are connected by an upper connecting member 8, and the upper end portion of the upper support column 7 and the tip end portion of the support beam 5 are connected by an oblique member 9 made of a steel material such as a shape steel. The support frame 2 is connected by a brace 11 to form a side frame 13.

橋軸直角方向に間隔をおいて隣り合う前記の側部フレーム13における上部の支柱7相互は、上部横連結材14がボルト・ナット等により着脱可能に連結されてていると共にブレース16の端部が連結されて、橋軸方向から見て門型のフレームを構成している。
前記の各支持梁5の長さは、張出し施工で施工する張出し第1ブロックの長さ(張出し施工を行うための移動作業車を載置出来る長さ)を施工できる長さ(橋軸方向に対称位置に施工される張出し第1ブロック15端部間の長さよりも長い寸法)とされている。前記のように側部フレーム13は、2列配置されて、繋ぎ梁としての上部横連結材14およびブレース16により一体化されて、橋軸方向から見て門型フレームとされている。
The upper support columns 7 in the side frames 13 adjacent to each other in the direction perpendicular to the bridge axis are connected to each other by an upper lateral connecting member 14 detachably connected thereto by bolts, nuts, and the like, and an end portion of the brace 16. Are connected to form a portal frame as viewed from the bridge axis direction.
The length of each of the supporting beams 5 is a length (in the direction of the bridge axis) that can be constructed by the length of the first overhanging block to be constructed by the overhang construction (the length on which the movable work vehicle for carrying out the overhang construction can be placed). The dimension is longer than the length between the ends of the overhanging first block 15 constructed at a symmetrical position). As described above, the side frames 13 are arranged in two rows, and are integrated by the upper horizontal connecting member 14 and the brace 16 as connecting beams to form a portal frame when viewed from the bridge axis direction.

なお、部材相互を着脱可能に連結させる部材としては、ボルト・ナットあるいはPC鋼棒とナット等適宜の手段を採用するようにしてもよい。橋軸直角方向の両側において、上部および下部の支柱部と支持梁5と上部連結材8と斜材9等により、それぞれ側部フレーム13を構成している。   As a member for detachably connecting the members, appropriate means such as a bolt / nut or a PC steel rod and a nut may be adopted. On both sides in the direction perpendicular to the bridge axis, the side frames 13 are constituted by the upper and lower support columns, the support beam 5, the upper connecting member 8, the diagonal member 9, and the like.

橋軸方向の前方および後方にそれぞれ張出すように設けられている前記支持梁5の前部および後部の上部には、橋軸直角方向に隣り合う前記支持梁5に渡って、それぞれ橋軸方向に間隔をおくと共に橋軸直角方向に間隔を延長する一対の前部側の横支持梁26(図3の右側)、および一対の後部側の横支持梁26(図3の左側)が図示省略のボルト・ナット等により着脱可能に取付られている。   The upper part of the front part and the rear part of the support beam 5 provided so as to project forward and rearward in the bridge axis direction, respectively, over the support beam 5 adjacent in the direction perpendicular to the bridge axis, respectively. A pair of front support beams 26 (the right side in FIG. 3) and a pair of rear side support beams 26 (the left side in FIG. 3) that are spaced apart from each other and extend in the direction perpendicular to the bridge axis are not shown. It is detachably attached with bolts and nuts.

前記一対の前部側の横支持梁26、および一対の後部側の横支持梁26の端部には、それぞれ、総ネジ異径PC鋼棒、ネジ付き棒鋼、ネジ付き帯鋼などのネジ付き縦部材17の上部が、ナット18あるいは図示省略のセンターホールジャッキおよびナットを介して支持されてレベル調整可能に吊り下げ支持され、前部側の4本の前記各ネジ付き縦部材17を挿通した前部側の作業床19は、その下部に配置されて前記ネジ付き縦部材17にねじ込まれたナット18、あるいは前記ネジ付き縦部材17に挿通された図示省略のセンターホールジャッキおよびねじ込まれる前記ナット18により、上下方向および傾斜角が調整可能に支持されている。   The ends of the pair of front support beams 26 on the front side and the pair of rear support beams 26 on the rear side are respectively provided with screws such as a total-thread different-diameter PC steel bar, a threaded steel bar, and a threaded steel strip. The upper part of the vertical member 17 is supported by a nut 18 or a center hole jack and a nut (not shown) and is supported so as to be adjustable in level, and the four threaded vertical members 17 on the front side are inserted. The work floor 19 on the front side is disposed under the nut 18 screwed into the threaded vertical member 17, or a center hole jack (not shown) inserted into the threaded vertical member 17 and the nut to be screwed in 18, the vertical direction and the tilt angle are supported in an adjustable manner.

前記の作業床19には、柱頭部12に接続するブロック築造用の型枠20(図4参照)およびその型枠を支持する支持部材(図示を省略)等が付属している。前記の作業床19および支持部材により支保工が構成されている。   The work floor 19 is attached with a block building mold 20 (see FIG. 4) connected to the column head 12 and a support member (not shown) for supporting the mold. The work floor 19 and the support member constitute a support work.

前記の支柱2,7を含む側部フレーム13、橋軸方向の支持梁5、横支持梁26、ネジ付き縦部材17および作業床19等により、張出し第1ブロックの施工用装置1が構成されている。   The overhanging first block construction apparatus 1 is constituted by the side frame 13 including the support columns 2, 7, the support beam 5 in the bridge axis direction, the lateral support beam 26, the threaded vertical member 17 and the work floor 19. ing.

図3に示す状態から、作業床19を、張出し第1ブロック15を築造すべく所定のレベルに保持し、型枠20を所定の位置に配置すると共に配筋およびPCケーブル用シース(いずれも図示を省略)を配置してコンクリートを打設し、養生後、前記PCケーブル用シース内に配置したPC鋼材を、張出し第1ブロック15の端部で緊張定着し、型枠を降下させる等して脱型して張出し第1ブロック15を構築する(図4の状態)。   From the state shown in FIG. 3, the work floor 19 is held at a predetermined level to build the first overhanging block 15, the formwork 20 is disposed at a predetermined position, and the reinforcing bar and PC cable sheath (both shown) After placing the concrete, the PC steel material placed in the PC cable sheath is tension-fixed at the end of the overhanging first block 15, and the mold is lowered. The overhanging first block 15 is constructed by demolding (state shown in FIG. 4).

次に、図4に示す張出し第1ブロックの施工用装置1の状態から、第2ブロック以降のブロックの築造する移動作業車に変化させる工程について説明する。   Next, a process of changing from the state of the overhanging first block construction apparatus 1 shown in FIG. 4 to a mobile work vehicle constructed by blocks after the second block will be described.

図5に示す状態から、下部の支柱2上部の液圧式ジャッキ3を伸長して、各横支持梁26における橋軸直角方向の中間部に間隔をおいて、それぞれ、伸縮式ジャッキ22を備えた伸縮可能な盛り替え用仮設支柱21を、柱頭部12上面と前記横支持梁26の下面との間に配置し、液圧式ジャッキ3を短縮して、前記の盛り替え用仮設支柱21に横支持梁26より上の部分の前記張出し第1ブロックの施工装置1の上側部分を支持させる。   From the state shown in FIG. 5, the hydraulic jack 3 on the upper portion of the lower support column 2 is extended, and each of the lateral support beams 26 is provided with a telescopic jack 22 with a space in the middle portion in the direction perpendicular to the bridge axis. The repositionable temporary support column 21 is disposed between the upper surface of the column head 12 and the lower surface of the horizontal support beam 26, and the hydraulic jack 3 is shortened to support the refill temporary column 21 laterally. The upper part of the construction device 1 of the projecting first block above the beam 26 is supported.

次いで、柱頭部12および張出し第1ブロック15上に、クレーン等により吊り上げて、橋軸直角方向に間隔をおいて平行であると共に橋軸方向に延長するように、前部側および後部側の走行用レール33をそれぞれ敷設し、また、その各走行用レール33上に、移動作業車34の側部菱形フレーム24をクレーン等により吊り上げて、側部菱形フレーム24における走行用駆動車輪10を載置すると共に、前部側および後部側の各横支持梁26の下側に、側部菱形フレーム24における橋軸方向に延長する縦梁4を配置する。
また、伸縮可能な盛り替え用仮設支柱21を短縮して、前部側および後部側の各横支持梁26の下面と縦梁4の上面を当接してこれらをボルト・ナット等により着脱可能に固定して、各横支持梁26を移動作業車34における横梁25とすると共に、側部菱形フレーム24相互を縦梁4と横梁25を図示省略のボルト・ナットにより連結して、移動作業車34を門型フレーム構造とする。また、移動作業車34の後部に適宜、柱頭部あるいは張出しブロックに対して、着脱可能なアンカー30を設ける。
次いで、クレーン等により、側部フレーム13またはこれを構成している斜材9、ブレース11、上部連結材8、上部の支柱7等を支持した状体で順次分解して吊り降ろして撤去し、前記液圧式ジャッキ3および下部の支柱2を吊り降ろして撤去する。
Next, it is lifted on the column head 12 and the overhanging first block 15 by a crane or the like, and travels on the front side and the rear side so as to be parallel to the bridge axis perpendicular to the bridge axis and extend in the bridge axis direction. Each rail 33 is laid, and the side rhombus frame 24 of the mobile work vehicle 34 is lifted on each traveling rail 33 by a crane or the like, and the driving wheel 10 for traveling on the side rhombus frame 24 is placed. At the same time, the vertical beams 4 extending in the bridge axis direction of the side rhombus frame 24 are arranged below the respective lateral support beams 26 on the front side and the rear side.
Further, the retractable temporary supporting column 21 can be shortened so that the lower surface of each horizontal support beam 26 on the front side and the rear side is in contact with the upper surface of the vertical beam 4 so that they can be attached and detached with bolts, nuts, or the like. Each lateral support beam 26 is fixed to be a horizontal beam 25 in the mobile work vehicle 34, and the side rhombus frame 24 is connected to the vertical beam 4 and the horizontal beam 25 by bolts and nuts (not shown). Is a portal frame structure. Moreover, the anchor 30 which can be attached or detached with respect to a pillar head or an overhang | projection block is provided in the rear part of the mobile work vehicle 34 suitably.
Next, with a crane or the like, the side frame 13 or the diagonal member 9, the brace 11, the upper connecting member 8, the upper support column 7 and the like constituting the side frame 13 are sequentially disassembled and suspended and removed, The hydraulic jack 3 and the lower support column 2 are suspended and removed.

次いで、クレーン等により、前記支持梁5上の斜材9および上部の支柱7およびブレース等を吊り降ろし撤去すると共に、前記支持梁5および盛り替え用仮設支柱21を吊り降ろし撤去して、柱頭部12および張出し第1ブロック15上に、移動作業車34またはその走行用レールのみとなるようにする(図7に示す状態)。すなわち、横支持梁部材26および横支持梁26により吊り下げ支持されている作業床を含む支保工を残して、それ以外の張出し第1ブロック施工用装置の部分を適宜、部品に分解して撤去する。   Next, the diagonal member 9 and the upper support column 7 and the brace etc. on the support beam 5 are suspended and removed by a crane or the like, and the support beam 5 and the temporary replacement support column 21 are suspended and removed. 12 and the overhanging first block 15 are made to be only the mobile work vehicle 34 or its traveling rail (state shown in FIG. 7). That is, with the support beam including the horizontal support beam member 26 and the work floor suspended and supported by the horizontal support beam 26, the other parts of the first overhanging first block construction device are appropriately disassembled and removed. To do.

前記の図7に示す移動作業車34の状態は、横支持梁26から利用した横梁25、およびその横梁25にネジ付き縦部材17を介して支持されている前部側の作業床19および後部側の作業床19は、それぞれ、張出し第1ブロックの施工用装置1の部分をそのまま移動用作業車23を構成する部分として利用されており、効率よく、移動作業車34に変化させて組み立てることが可能になる。   The state of the mobile work vehicle 34 shown in FIG. 7 is as follows. The horizontal beam 25 used from the horizontal support beam 26, and the front work floor 19 and the rear portion supported by the horizontal beam 25 via the threaded vertical member 17. The side work floor 19 is used as it is as a part constituting the moving work vehicle 23 as it is as a part of the construction device 1 of the overhanging first block. Is possible.

前記のようにして、移動作業車34とした後、図示を省略するが、適宜アンカー30を取り外して、張出し第1ブロック15の端部まで、移動作業車34を、駆動車輪10および走行用車輪を転動させて張出し方向に移動して位置固定し、作業床19および型枠20を所定の張出し第2のブロックを構築すべき所定の位置に配置し、張出し第2ブロック部分の配筋後、コンクリートを打設して、張出し第2ブロックを構築し、以下、同様な作業を繰り返して、橋梁を構築する。橋軸方向の反対側も同様である。   Although not shown in the figure after the mobile work vehicle 34 is formed as described above, the anchor 30 is removed as appropriate, and the mobile work vehicle 34 is moved to the end of the overhanging first block 15 so that the drive wheel 10 and the traveling wheel are moved. Is moved in the overhanging direction to fix the position, the work floor 19 and the formwork 20 are arranged at a predetermined position where the second overhanging second block is to be constructed, and after the bar arrangement of the overhanging second block portion Then, concrete is cast to construct the second overhanging block, and then the same work is repeated to construct a bridge. The same applies to the opposite side of the bridge axis direction.

前記実施形態においては、橋軸方向の各作業床19は、橋軸方向にそれぞれ独立した形態を示したが、本発明を実施する場合、張出し第1ブロックを構築するまでは、各作業床19相互を、足場部を備えた連結材により連結し、第1ブロックの構築後において、前記連結材を撤去するようにしてもよい。   In the above-described embodiment, each work floor 19 in the bridge axis direction has an independent form in the bridge axis direction. However, when the present invention is implemented, each work floor 19 is constructed until the overhanging first block is constructed. They may be connected to each other by a connecting material provided with a scaffold part, and the connecting material may be removed after the construction of the first block.

本発明の張出し第1ブロックの施工用装置を柱頭部に設置するための工程を示すものであって、(a)は橋脚を完成させた状態の橋軸直角方向から見た側面図、(b)は(a)の正面図である。The process for installing the construction apparatus of the overhang | projection 1st block of this invention in a column head is shown, Comprising: (a) is the side view seen from the bridge axis orthogonal direction of the state which completed the bridge pier, (b) ) Is a front view of (a). 本発明の張出し第1ブロックの施工用装置を柱頭部に設置するための工程を示すものであって、(a)は柱頭部を施工した状態の橋軸直角方向から見た側面図、(b)は(a)の正面図である。The process for installing the construction apparatus of the overhang | projection 1st block of this invention in a pillar head is shown, Comprising: (a) is the side view seen from the bridge axis orthogonal direction of the state which constructed the pillar head, (b ) Is a front view of (a). 本発明の張出し第1ブロックの施工用装置を柱頭部に設置した状態を示すものであって、(a)は橋軸直角方向から見た側面図、(b)は(a)の正面図である。The state which installed the construction apparatus of the overhang | projection 1st block of this invention in a pillar head, Comprising: (a) is the side view seen from the bridge axis perpendicular direction, (b) is the front view of (a). is there. 図3の状態から張出し第1ブロックを施工した状態を示すものであって、(a)は橋軸直角方向から見た側面図、(b)は(a)の正面図である。FIG. 4 shows a state in which the projecting first block is constructed from the state of FIG. 3, wherein (a) is a side view seen from the direction perpendicular to the bridge axis, and (b) is a front view of (a). 図4の状態から、柱頭部と張出し第1ブロックの施工用装置との間に盛り替え仮受け柱を設置した状態を示すものであって、(a)は橋軸直角方向から見た側面図、(b)は(a)の正面図である。FIG. 4 shows a state in which a refilling temporary receiving column is installed between the column head and the construction device for the projecting first block from the state of FIG. 4, and (a) is a side view seen from the direction perpendicular to the bridge axis. (B) is a front view of (a). 図5の状態から、柱頭部および第1ブロッにレールを敷設すると共に、横支持梁の下側に、その横支持梁を横梁として移動作業車に組み込むように、横梁付き移動作業車を組立ている状態を示すものであって、(a)は橋軸直角方向から見た側面図、(b)は(a)の正面図である。From the state of FIG. 5, the rail is laid on the column head and the first block, and the mobile work vehicle with a horizontal beam is assembled on the lower side of the horizontal support beam so that the horizontal support beam is incorporated into the mobile work vehicle as a horizontal beam. It shows a state, (a) is a side view seen from the direction perpendicular to the bridge axis, (b) is a front view of (a). 横支持梁以外の張出し第1ブロックの施工用装置を分解して撤去した状態を示すものであって、(a)は橋軸直角方向から見た側面図、(b)は(a)の正面図である。It shows the state of disassembling and removing the construction device for the first projecting block other than the lateral support beams, (a) is a side view seen from the direction perpendicular to the bridge axis, and (b) is the front view of (a). FIG. 図7の状態から、第2ブロックを施工すべく、横梁付き移動作業車を張出し第1ブロックの先端側に移動して位置固定した状態を示すものであって、(a)は橋軸直角方向から見た側面図、(b)は(a)の正面図である。FIG. 7 shows a state in which a movable working vehicle with a cross beam is extended and moved to the tip side of the first block to fix the position in order to construct the second block, and (a) is a direction perpendicular to the bridge axis. The side view seen from (b) is a front view of (a). 従来の張出し架設機の説明図であるIt is explanatory drawing of the conventional overhang construction machine

符号の説明Explanation of symbols

1 第1ブロックの施工用装置
2 下部の支柱
3 ジャッキ
4 縦梁
5 支持梁
6 鉛直材
7 上部の支柱
8 上部連結材
9 斜材
10 走行車輪(移動装置)
11 ブレース
12 柱頭部
13 側部フレーム
14 上部横連結材
15 張出し第1ブロック
16 ブレース
17 ネジ付き縦部材
18 ナット
19 作業床
20 型枠
21 盛り替え用仮設支柱
22 ジャッキ
23 移動作業車
24 側部菱形フレーム
25 横梁
26 横支持梁
28 橋脚
29 作業足場
29a ブラケット
30 アンカー
33 走行レール
34 移動作業車
35 走行用車輪
36 伸縮可能な脚部
39 前部斜材
40 通常の張出し架設機
41 水平材
42 後部斜材
DESCRIPTION OF SYMBOLS 1 Construction apparatus of 1st block 2 Lower support | pillar 3 Jack 4 Vertical beam 5 Support beam 6 Vertical material 7 Upper support 8 Upper connection material 9 Diagonal material 10 Traveling wheel (moving device)
DESCRIPTION OF SYMBOLS 11 Brace 12 Column head 13 Side frame 14 Upper horizontal connection material 15 Overhang 1st block 16 Brace 17 Threaded vertical member 18 Nut 19 Work floor 20 Formwork 21 Temporary support column 22 Jack 23 Mobile work vehicle 24 Side diamond Frame 25 Lateral beam 26 Lateral support beam 28 Bridge pier 29 Working scaffold 29a Bracket 30 Anchor 33 Traveling rail 34 Mobile work vehicle 35 Traveling wheel 36 Retractable leg 39 Front diagonal member 40 Normal overhanging machine 41 Horizontal material 42 Rear diagonal Material

Claims (4)

柱頭部上に仮設設置される張出し第1ブロックの施工用架設装置であって、その施工用架設装置は、柱頭部上に設置される支柱を備えていると共に、柱頭部から張出し施工方向に伸びる支持梁を備え、前記支持梁に支持され、かつ移動作業車における横梁として利用される橋軸直角方向に伸びる着脱可能な横支持梁を備え、前記横支持梁により支保工を吊り下げ支持していることを特徴とする張出し第1ブロックの施工用架設装置。   A construction erection device for a first overhang that is temporarily installed on a column head, the construction erection device having a column installed on the column head and extending from the column head in the overhanging direction. A support beam, a detachable lateral support beam that is supported by the support beam and that extends in a direction perpendicular to the bridge axis that is used as a lateral beam in a mobile work vehicle, and supports the suspension work suspended by the lateral support beam. An overhanging apparatus for constructing an overhanging first block, characterized in that: 前記支柱は、伸縮可能な支柱とされていることを特徴とする請求項1に記載の張出し第1ブロックの施工用架設装置。   The construction device for constructing the first projecting block according to claim 1, wherein the support column is an extendable support column. 請求項1または2の張出し第1ブロックの施工用架設装置により、張出し第1ブロックを施工した後、前記支保工を吊り下げ支持する前記横支持梁を、張出し第1ブロック上に移動可能に設置される移動作業車における横梁として組み込むと共に、その横梁に吊り下げ支持されている支保工以外の張出し第1ブロックの施工用架設装置の部分を撤去して横梁組み込み移動作業車とすることを特徴とする移動作業車の構築方法。   The construction of the overhanging first block construction apparatus according to claim 1 or 2, wherein after the construction of the overhanging first block, the lateral support beam for supporting the suspension work is movably installed on the overhanging first block. It is incorporated as a horizontal beam in a mobile work vehicle, and the construction work device for the horizontal beam is removed by removing the part of the construction device for the construction of the first extended block other than the support work supported by the horizontal beam. To build a mobile work vehicle. 請求項1または2の張出し第1ブロックの施工用架設装置により、張出し第1ブロックを施工した後、前記支保工を吊り下げ支持する前記横支持梁を、張出し第1ブロック上に移動可能に設置される移動作業車における横梁として組み込むと共に、その横梁を込んだ横梁組み込み移動作業車により、第2ブロック以降を施工することを特徴とする橋梁の張出し施工方法。   The construction of the overhanging first block construction apparatus according to claim 1 or 2, wherein after the construction of the overhanging first block, the lateral support beam for supporting the suspension work is movably installed on the overhanging first block. A bridge overhang construction method characterized in that the second and subsequent blocks are constructed using a transverse beam built-in movable work vehicle that incorporates the transverse beam as a transverse beam in a movable work vehicle.
JP2008019581A 2008-01-30 2008-01-30 Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge Expired - Fee Related JP4980257B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008019581A JP4980257B2 (en) 2008-01-30 2008-01-30 Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008019581A JP4980257B2 (en) 2008-01-30 2008-01-30 Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge

Publications (2)

Publication Number Publication Date
JP2009179999A JP2009179999A (en) 2009-08-13
JP4980257B2 true JP4980257B2 (en) 2012-07-18

Family

ID=41034184

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008019581A Expired - Fee Related JP4980257B2 (en) 2008-01-30 2008-01-30 Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge

Country Status (1)

Country Link
JP (1) JP4980257B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102174795B (en) * 2011-03-28 2012-04-18 中铁一局集团有限公司 Reversible suspended basket wheel type travelling system and method
JP6509096B2 (en) * 2015-11-12 2019-05-08 鹿島建設株式会社 Extension method
CN105839550B (en) * 2016-05-23 2017-10-03 中交第一公路工程局有限公司 A kind of compressing walking mechanism and cantilever cradle for cantilever cradle
CN106400694B (en) * 2016-11-14 2018-07-03 中交第二航务工程局有限公司 A kind of high pier stent assembled prepressing device and method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3110985B2 (en) * 1995-08-22 2000-11-20 株式会社ピー・エス Construction method of column capital of overhang girder bridge
JP3845619B2 (en) * 2003-01-16 2006-11-15 株式会社ピーエス三菱 Column head construction method
JP2006052573A (en) * 2004-08-11 2006-02-23 Oriental Construction Co Ltd Method of overhangingly erecting bridge, and diagonal member anchoring structure for use therein

Also Published As

Publication number Publication date
JP2009179999A (en) 2009-08-13

Similar Documents

Publication Publication Date Title
JP6902184B2 (en) Work equipment and overhang erection method
JP5056608B2 (en) Retraction removal method and retraction device for mobile work vehicle for cantilever installation
JP5179804B2 (en) Mobile suspension support
JP5319216B2 (en) Bridge girder erection device and bridge girder erection method
KR101259031B1 (en) Form traveller having transversal frame, and launching method for the same
JP5807253B2 (en) Telescopic scaffold structure and suspension scaffold installation method using the same
JP2012202076A (en) Construction device of overhead viaduct and construction method of overhead viaduct
JP4777922B2 (en) Mobile suspension support
JP4937838B2 (en) How to build a bridge
JP4980257B2 (en) Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge
JP3845619B2 (en) Column head construction method
JP5184248B2 (en) Construction method of level crossing
CN112726411B (en) Integral dragging construction method for single-hole large cantilever steel truss girder
JP5260709B2 (en) Bridge girder delivery method
JP4329535B2 (en) Mobile work vehicle for overhanging slabs
JP2009263868A (en) Manufacturing equipment and manufacturing method for prestressed composite girder employing erection girder as reaction body
KR101030053B1 (en) Movement type apparatus for constructing and detaching frame panel of a steel box bridge
JP2008050811A (en) Movable suspended scaffolding apparatus
JP2009121145A (en) Overhanging erection machine and overhang erection method
JP2000087316A (en) Method and device for construction of floor slab
JP5187969B2 (en) Overhead viaduct construction equipment and construction method
JP4719179B2 (en) Dismantling / removal method of support work and upper support work
KR101200246B1 (en) Toggle link means steel-fram assembly jig system
JP4080070B2 (en) Floor slab construction method and apparatus
KR20190122925A (en) Bridges Construction Vents

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110119

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120327

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120328

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120418

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150427

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees