SU972120A1 - Power matching support for two-layer excavation - Google Patents
Power matching support for two-layer excavation Download PDFInfo
- Publication number
- SU972120A1 SU972120A1 SU802913466A SU2913466A SU972120A1 SU 972120 A1 SU972120 A1 SU 972120A1 SU 802913466 A SU802913466 A SU 802913466A SU 2913466 A SU2913466 A SU 2913466A SU 972120 A1 SU972120 A1 SU 972120A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- support
- layer
- power matching
- matching support
- layer excavation
- Prior art date
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Description
(54) МЕХАНИЗИРОВАННАЯ КРЕПБ СОПРЯЖЕНИЯ ДЛЯ ДВУХСЛОЕВОЙ ВЫЕМКИ(54) MECHANIZED CREW FORMING FOR TWO-LAYER EXTRACT
1one
Изобретение относитс к механизированным креп м и может быть использовано дл поддержани сопр жений лав со штреками при двухслоевой вые.мке пологих пластов полезных ископае.мых с межслоевой пачкой .The invention relates to mechanized supports and can be used to maintain the interface between lavas and drifts in a two-layer voyage of gentle seams of mineral deposits with an interlayer pack.
Известна механизированна крепь дл двухслоевой выемки углей, включающа перекрыти с гидростойками, до1мкраты передвижени и раздвижное ограждение, шарнирно закрепленное на перекрытии 1.Known mechanized lining for two-layer coal excavation, including overlaps with hydraulic legs, movement mounts and a sliding guard, hinged on the ceiling 1.
Недостаток этой крепи - деформации перекрыти и ограждений при крупноблочном обрушении кровли.The disadvantage of this support is deformations of the overlap and fences during large-block roof collapse.
Наиболее близкой по технической сущности из известных вл етс механизированна крепь, сопр женна дл двухслоевой выемки, включающа св занные между собой верхними домкратами передвижени внешние и внутренние секции, содержащие пары гидростоек и перекрыти , на которых шарнирно закреплены раздвижные ограждени 2.The closest to the technical essence of the known is mechanized lining, conjugated for a two-layered recess, including external and internal sections connected to each other by means of overhead jacks, containing pairs of hydraulic rails and overlaps on which sliding barriers 2 are hinged.
Недостатками этой крепи вл ютс высокие нагрузки на ограждени секции при опускании кровли и, как следствие, раздутие цилиндров гидростоек, деформации перекрытий и обрыв ограждений.The disadvantages of this support are high loads on the fences of the section when the roof is lowered and, as a result, the expansion of the cylinders of hydraulic posts, deformation of the floors and the break of the fences.
Цель изобретени - повышение надежности крепи сопр жени при работе на пластах с межслоевой пачкой.The purpose of the invention is to improve the reliability of the support when working on layers with an interlayer stack.
Поставленна цель достигаетс тем, что в механизированной крепи сопр жени дл двухслоевой выемки, включающей св занные между собой верхними домкратами передвижени внешние и внутреннюю секции , содержащие пары гидростоек перекры10 ти , на которых шарнирно закреплены раздвижные ограждени , ограждени выполнены из продольных балок с вертикальными кронштейнами на забойных концах дл св зи с перекрыти ми и выдвижными опорами 15 с гидростойками на завальных концах, при этом высота кронштейнов больше вынимае .мой мощности пласта верхнего сло .The goal is achieved by the fact that in the mechanized lining of an interface for a two-layer notch, including external and internal sections interconnected by upper jacks of movement, containing a pair of hydraulic posts of the ceiling, on which sliding barriers are hinged, they are made of longitudinal beams with vertical brackets on downhole ends for connection with overlappings and retractable supports 15 with hydraulically supported posts on the embankment ends, while the height of the brackets is more removed. about slo
На фиг. 1 изображена предлагаема крепь сопр жени , вид сбоку; на фиг. 2 - то же, вид с завальной стороны.FIG. 1 shows the proposed joint support, side view; in fig. 2 - the same view from the scoop.
2020
Механизированна крепь сопр жени при двухслоевой выемке пологих пластов с межслоевой пачкой включает три секции поддерживающе-оградительного типа.Mechanized lining of mating in a two-layer excavation of flat seams with an interlayer pack includes three sections of a supporting-protective type.
Поддерживающа часть крепи, состо ща из верхн ков 1 и 2, гидростоек 3 и домкратов 4 передвижени крепи, устанавливаетс на сопр жении лавы верхнего сло со штреком. Ограждающие перекрыти 5, представл ющие собой сварные балки, усиленные ребрами жесткости, перекрывают всплощную рабочее пространство сопр жени лавы нижнего сло со щтреком ниже уровн кровли межслоевой пачки. С одной стороны ограждающие перекрыти 5 щарнирно соедин ютс с верхн ками 1 поддерживающей части крепи посредством жестко св занных с ограждающим перекрытием кронштейнов 6, а с другой стороны опираютс на выдвижные опоры 7 с гидростойками 8, позвол ющими регулировать угол наклона ограждающих перекрытий. К основани м выдвижных опор щарнирно закрепл ютс цилиндры домкратов 4 передвижени забойного конвейера лавы нижнего сло , которые одновременно используютс в качестве вспомогательных домкратов передвижени крепи. Передвижка крепи осуществл етс с блока управлени , расположенного в зоне поддерживающей части крепи, и производитс следующим образом. Разгружаютс гидростойки любой крайней секции . Дл исключени попадани обрущенных пород, наход щихс на ограждающих перекрыти х, в рабочую зону сопр жени ограждающее перекрытие опускаетс на величину , не превышающую толщины соседнего ограждающего перекрыти .The supporting part of the lining, consisting of the tops 1 and 2, hydraulic posts 3 and jacks 4 of the movement of the lining, is mounted on the mating of the upper layer's lava with the drift. Fencing overlaps 5, which are welded beams reinforced with stiffening ribs, overlap the flat working space of the mating of the lower layer's lava with a shield below the roof level of the interlayer pack. On the one hand, the fencing overlaps 5 are hingedly connected to the top 1 of the supporting part of the lining by means of brackets 6 rigidly connected to the fencing overlapping, and on the other hand they are supported on the retractable supports 7 with the hydraulically adjustable 8, which allow to adjust the angle of the overlapping of the overlapping. The cylinders of the jacks 4 of movement of the bottom face lava face conveyor belt, which are simultaneously used as auxiliary jacks of the support support, are pivotally attached to the bases of the sliding supports. The shifting of the support is carried out from the control unit located in the area of the supporting part of the support, and is performed as follows. Hydraulic legs of any extreme section are unloaded. In order to prevent the collapsed rocks located on the enclosing ceilings from entering the working area of the mating, the enclosing overlap is lowered by an amount not exceeding the thickness of the adjacent enclosing overlap.
Одновременно включаютс домкраты передвижени секции и передвижени забойного конвейера лавы нижнего сло .At the same time, the jacks for moving the section and moving the bottomhole lava conveyor belt are turned on.
При этом забойный конвейер лавы нижнего сло удерживаетс от смещени двум домкратами передвижени конвейера соседних секций.In this case, the downhole lava conveyor of the lower layer is kept from being moved by two jacks to the movement of the conveyor of adjacent sections.
После окончани передвижки первой крайней секции передвигаетс втора крайн секци , а затем и средн секции.After the end of the first extreme section has been completed, the second extreme section is moved, and then the middle section is moved.
Предлагаема механизированна крепь сопр жени может быть использована при двухслоевой выемке пологих пластов полезных ископаемых с оставлением межслоевой пачки.The proposed mechanized lining of the mate can be used for two-layer excavation of shallow mineral layers, leaving an interlayer pack.
Породы кровли за крепью лавы верхнего сло обрущиваютс плитами, размеры которых вдоль лавы значительно превыщают ширину выработки на сопр жении. В результате при посадках кровли породы будут обрущатьс на межслоевую пачку и лишь затем, размалыва сь, нагружать ограждени крепи сопр жени .Rocks of the roof behind the lava support of the upper layer are crushed with slabs whose dimensions along the lava considerably exceed the width of the excavation at the interface. As a result, during the landing of the roof, the rocks will collapse on the interlayer pack and only then, by grinding, load the fencing of the support.
Кроме того, выравниваетс лини обрушени кровли в лаве верхнего сло и на сопр жении, поэтому отпадает необходимость креплени бермовых зон.In addition, the line of collapse of the roof in the lava of the upper layer and on the interface is aligned, therefore, the need to fasten berm zones is eliminated.
Таким образом, повышаетс надежность работы крепи и безопасность ее обслуживани .Thus, the reliability of the support and the safety of its service are improved.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802913466A SU972120A1 (en) | 1980-04-21 | 1980-04-21 | Power matching support for two-layer excavation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802913466A SU972120A1 (en) | 1980-04-21 | 1980-04-21 | Power matching support for two-layer excavation |
Publications (1)
Publication Number | Publication Date |
---|---|
SU972120A1 true SU972120A1 (en) | 1982-11-07 |
Family
ID=20891170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802913466A SU972120A1 (en) | 1980-04-21 | 1980-04-21 | Power matching support for two-layer excavation |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU972120A1 (en) |
-
1980
- 1980-04-21 SU SU802913466A patent/SU972120A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4065929A (en) | Mine roof support and method in longwall mining of thick mineral seams | |
SU972120A1 (en) | Power matching support for two-layer excavation | |
SU1134726A1 (en) | Unit for mining thick coal seams | |
US4505517A (en) | Self-advancing mine roof supports | |
RU2021520C1 (en) | Aggregate roadway support | |
US3636715A (en) | Method of and machine for erecting long straggling subterraneous buildings | |
SU1677330A1 (en) | Powered shield support for inclined and steeply dipping seams | |
SU1073475A2 (en) | Power roof support | |
SU486135A1 (en) | Mechanized roof support | |
US4415295A (en) | Mineral mining installations | |
SU1070318A1 (en) | Power roof support unit | |
SU1084457A1 (en) | Power support | |
RU2172410C2 (en) | Powered tunneling and stoping complex (unit) | |
SU1739048A1 (en) | Powered support for layer mining in thick steep and inclined beds | |
RU2059827C1 (en) | Set for steeply deepen seams | |
SU1765448A1 (en) | Powered roof support | |
SU1021788A1 (en) | Power roof support unit | |
SU1696723A1 (en) | Powered stoping complex | |
SU1145135A1 (en) | Scraper-planer unit | |
RU2052122C1 (en) | Unitized aggregated powered support for inclined beds | |
RU2651831C1 (en) | Method for development of a high slope coal layer by flows on the skate and section of the shield support of the mining face for its implementation | |
CA1166460A (en) | Mineral mining installation | |
RU2046947C1 (en) | Method to develop thick steep and inclined coal stratums | |
RU2058492C1 (en) | Powered support assembly for sloping beds | |
RU2011835C1 (en) | Powered connection support |