Description
(54) КРЕПЬ ПОДГОТОВИТЕЛЬНЫХ ВЫРАБОТОК(54) STRONGHOOD OF THE PREPARATORY WORKS
1one
Изобретение относитс к горной промышленности , а именно к креплению шахтных подготовительных выработок.FIELD OF THE INVENTION The invention relates to the mining industry, namely to the fastening of the mine development workings.
Известны крепи подготовительных выработок , состо щие из рам, кажда из которых включает элементы в виде перекрыти ,Known lining preparatory workings, consisting of frames, each of which includes elements in the form of overlap,
боковых стенок и основани с узлами податливости 1J.the side walls and the base with the nodes of compliance 1J.
Наиболее близким техническим решением вл етс крепь подготовительных выработок, состо ща из перекрыти , основани и боковых стоек в виде телескопических коробчатых опор с силовыми гидроцилиндрами и узлов податливости 2.The closest technical solution is the support of development workings, consisting of overlapping, base and side posts in the form of telescopic box supports with power hydraulic cylinders and nodes of compliance 2.
Общим недостатком известных устройств вл етс больща трудоемкость их установки .A common drawback of the known devices is the greater complexity of their installation.
Цель изобретени - упрощение процесса возведени крепи.The purpose of the invention is to simplify the process of the erection of lining.
Поставленна цель достигаетс тем, что перекрытие выполнено из двух составных желобообразных отрезков, одни концы которых щарнирно соединены с верхними концами боковых стоек, а противоположные выполнены со сквозными отверсти ми дл размещени в них металлического стержн , приThe goal is achieved by the fact that the overlap is made of two composite gutter-like segments, one ends of which are pivotally connected to the upper ends of the side racks, and the opposite ends are made with through holes for accommodating a metal rod,
этом отрезки перекрыти соединены хомутами .this overlap segments are connected by clamps.
Основание выполнено желобообразной формы.The base is made trough-shaped.
На фиг. 1 изображена предлагаема FIG. 1 depicts the proposed
5 крепь, общий вид; на фиг. 2 - узел соединени отрезков, составл ющих перекрытие. Крепь включает телескопические коробчатые опоры 1, внутри которых расположены силовые гидроцилиндры 2, к которым на щар ,Q нирах 3 прикреплены основание 4 и перекрытие , состо щее из двух отрезков 5 и 6 желобообразной формы, скрепленных между собой хомутами 7. В желобообразном отрезке 5 выполнено несколько отверстий. На желобообразном отрезке 6 выполнено на конце5 lining, general view; in fig. 2 is a junction of the segments constituting the overlap. The support includes telescopic box supports 1, inside of which are located hydraulic cylinders 2, to which a base 4 and an overlap consisting of two segments 5 and 6 of trough-like shape, fastened together with clamps 7, are attached to Q 3 reins. several holes. On the groove segment 6 is performed at the end
15 одно отверстие такого же диаметра, как и на отрезке 5, и конец отрезка 6 закруглен. Во врем монтажа крепи в сов.мещенные отверсти отрезков 5 и 6 вставл ютс стержни 8, гидроцилиндром 9 создаетс вертикаль2Q на нагрузка на перекрытие.15 one hole of the same diameter as in segment 5, and the end of segment 6 is rounded. During installation, the lugs of the segments 5 and 6 are inserted into the joint-mounted holes of the rods 8, and the hydraulic cylinder 9 creates a vertical 2Q for load on the floor.
При монтаже крепи устанавливаютс боковые опоры 1, снабженные силовыми гидроцилиндрами 2, к нижним концам боковых опор 1 прикрепл етс шарнирами 3 основание 4 из желобообразного спецпрофил , кWhen mounting the lining, lateral supports 1, fitted with power cylinders 2, are mounted, hinges 3 are attached to the lower ends of lateral supports 1, the base 4 of the groove-shaped special profile, to
BepxHHjM концам опор 1 прикрепл ют соответствующие концы отрезков 5 и 6 желообразной формы, составл ющих перекрытие, а противоположные концы отрезков 5 и 6 соедин ютс между собой под углом друг к другу в зависимости от рассто ни между боковыми стенками щтрека при помощи круглого металлического стержн 8, вставленного в совмещенные друг с другом боковые отверсти на концах отрезков 5 и 6. При помощи силовых гидроцилиндров 2 даетс вертикальный распор. Затем силовым гидроцилиндром 9 создаетс вертикальна нагрузка в месте соединени отрезков 5 и 6 между собой. Нагрузка даетс до тех пор, пока отрезки 5 и 6 не займут горизонтальное положение и выт нутс в одну линию. В то врем кра отрезков 5 и 6, соединенные с боковыми опорами 1, разойдутс в сторону и будут давить в бока выработки. После того , как отрезки 5 и 6 займут фиксированное положение, они соедин ютс между собой хомутами 7, а металлический стержень 8 выбиваетс из отверсти , перекрытие будет работать в податливом режиме при нагрузке с боков выработки.BepxHHjM the ends of the supports 1 attach the corresponding ends of the segments 5 and 6 of an iliform shape constituting the overlap, and the opposite ends of the segments 5 and 6 are interconnected at an angle to each other depending on the distance between the side walls of the tongue 8 with a round metal rod 8 inserted into the side holes aligned with each other at the ends of the segments 5 and 6. With the help of the power cylinders 2, a vertical distance is given. Then the power cylinder 9 creates a vertical load at the junction of segments 5 and 6 between them. The load is given until segments 5 and 6 are horizontal and are aligned. At that time, the edges of the segments 5 and 6, connected to the side supports 1, will spread to the side and will press into the sides of the excavation. After the segments 5 and 6 have a fixed position, they are interconnected by clamps 7, and the metal rod 8 is knocked out of the hole, the overlap will operate in a compliant mode with a load from the sides of the working.
Загругление на конце отрезка 6 должно быть достаточным дл свободного проворота отрезкоэ между собой после того, как они будут соединены втулкой и начнетс распор перекрыти .The rounding at the end of the segment 6 should be sufficient to allow the segment to freely rotate between themselves after they are joined by the sleeve and the overlap begins to break.
Предлагаема крепь отличаетс относительно низкими затратами на изготовление по сравнению с прототипом, так как используютс два силовых гидроцилиндра с телескопическими коробчатыми опорами вместо четырех. При этом сохран етс возможностьThe proposed support is characterized by relatively low manufacturing costs compared to the prototype, since two power cylinders with telescopic box supports are used instead of four. At the same time, the possibility
создани предварительного распора как на кровлю выработки, так и на бока, с дальнейшей работой крепи в податливом режиме. Это предохран ет крепь от деформации и разрущени дл повторного использовани . Элементы перекрыти и основани составл ют типовой желобчатый спецпрофиль типа СВП. Отверсти можно легко сделать в мастерской, имеющейс на любой шахте. Перекрыти надежно фиксируютс к боковым ножам.creating a preliminary thrust on both the roof of the mine and the side, with the further work of the support in a compliant mode. This prevents the lining from being deformed and destroyed for reuse. The overlapping elements and the bases constitute a typical grooved special profile of the type of SVP. Holes can be easily made in the workshop that is available at any mine. The overlaps are securely fixed to the side knives.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813234771A SU972114A1 (en) | 1981-01-12 | 1981-01-12 | Support for preparatary workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813234771A SU972114A1 (en) | 1981-01-12 | 1981-01-12 | Support for preparatary workings |
Publications (1)
Publication Number | Publication Date |
---|---|
SU972114A1 true SU972114A1 (en) | 1982-11-07 |
Family
ID=20938244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU813234771A SU972114A1 (en) | 1981-01-12 | 1981-01-12 | Support for preparatary workings |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU972114A1 (en) |
-
1981
- 1981-01-12 SU SU813234771A patent/SU972114A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU972114A1 (en) | Support for preparatary workings | |
SU1606707A1 (en) | Entry-driving support | |
RU96111486A (en) | METHOD FOR PRESERVING MINING | |
KR100502150B1 (en) | Panel Assembly for Ground Protection of Earths Wall and Destruction Method of it | |
SU977798A1 (en) | Yieldable unit for roof support of special section | |
SU1737128A1 (en) | Barrel-shaped standard steel support | |
KR20210013927A (en) | Steel pipe connection apparatus of vinyl greenhouse truss structure | |
SU1694916A1 (en) | Support for development working | |
CN217151999U (en) | Tunneling advance support device | |
SU994742A1 (en) | Apparatus for pressing into soil a sinkable lining | |
KR890000681B1 (en) | Constructing method of a building unit | |
RU2083841C1 (en) | Universal pliable framed support | |
SU1493790A1 (en) | Support for development workings | |
SU960443A1 (en) | Preparotary working timbering for steep beds | |
CN216950432U (en) | Roadway side advanced support device for coal roadway driving working face | |
RU2112141C1 (en) | Process of location of braces on frame members of support and gear for its realization | |
SU870726A1 (en) | Support for advance workings | |
JPS58195652A (en) | Hanging-up construction of roof enclosure | |
RU1804561C (en) | Frame support | |
SU1270350A1 (en) | Method of constructing framework support of development working | |
SU732536A1 (en) | Steel and concrete mining roof support | |
SU796434A1 (en) | Housing of shield for tunnelling with prefabricated lining | |
SU1317143A1 (en) | Method of erecting the frame of arc support | |
SU1618891A1 (en) | Device for supporting development working | |
SU773283A1 (en) | Interim roof support for preparatory workings |