SU969644A1 - Overhead bridge crane - Google Patents

Overhead bridge crane Download PDF

Info

Publication number
SU969644A1
SU969644A1 SU813268907A SU3268907A SU969644A1 SU 969644 A1 SU969644 A1 SU 969644A1 SU 813268907 A SU813268907 A SU 813268907A SU 3268907 A SU3268907 A SU 3268907A SU 969644 A1 SU969644 A1 SU 969644A1
Authority
SU
USSR - Soviet Union
Prior art keywords
carriage
distance
span
thrust
stop
Prior art date
Application number
SU813268907A
Other languages
Russian (ru)
Inventor
Виктор Гаврилович Стручков
Лев Филиппович Лампрехт
Original Assignee
Курский Завод "Спецэлеватормельмаш"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Курский Завод "Спецэлеватормельмаш" filed Critical Курский Завод "Спецэлеватормельмаш"
Priority to SU813268907A priority Critical patent/SU969644A1/en
Application granted granted Critical
Publication of SU969644A1 publication Critical patent/SU969644A1/en

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Description

Изобретение относитс  к подъем но- транспортному машиностроению, а именно к конструкци м подвесных мостовых кранов.The invention relates to the lifting of a non-transport machinery, namely, the structures of overhead bridge cranes.

Известен подвесной мостовой кран, содержащий пролетную и концевые балки , подвешенные к ходовым кареткам с механизмами передвижени , безребордными катками, опирающимис  на подвесные пути, и горизонтальными направл ющими роликами, грузоподъемный механизм на пролетной балке 1.A suspension bridge crane is known, comprising span and end beams suspended from running carriages with movement mechanisms, skating rollers supported on the gangways, and horizontal guide rollers, a lifting mechanism on span beam 1.

Недостатком известного крана  вл етс  значительный износ подвесных путей вследствие их непараллельности , а также вследствие перекоса крана при работе раздельных приводов механизма передвижени .A disadvantage of the known crane is considerable wear of the suspension paths due to their non-parallelism, as well as due to the crane tilting during the operation of separate drives of the movement mechanism.

Цель изобретени  - уменьшение износа подвесного пути.The purpose of the invention is to reduce wear of the suspension path.

Поставленна  цель достигаетс  тем, что в подвесном мостовом кране, содержащем пролетную и концевые балки , подвешенные к ходовым кареткам с механизмами передвижени , безребордными катками, опирающимис  на подвесные пути, и гориз.онтальными направл ющими роликами, грузоподъемный механизм на пролетной балке, одна из концевых балок соединена сThe goal is achieved by the fact that, in a suspended bridge crane containing span and end beams, suspended from running carriages with traveling mechanisms, roll-up rollers supported on overhead tracks, and horizontal guide rollers, a lifting mechanism on the span beam is one of the end rollers. beams connected to

. .

каждой ходовой кареткой парой т г, концы которых прикреплены к упом нутым балке и каретке посредством шарниров, оси которых расположены на рассто нии L, св занном соотношениемeach running carriage with a pair of tg, the ends of which are attached to the said beam and the carriage by means of hinges, the axes of which are located at a distance L, connected by the ratio

1-е1st

L гL g

Ц C

Q где L - рассто ние между ос ми т ги; С - допустима  величина непараллельности подвесных путей; I - рассто ние от шарнира креплени  т ги к Каретке до упора на каретке;Q where L is the distance between the axles of the pulses; C - permissible value of non-parallelism of suspended tracks; I is the distance from the hinge attachment to the carriage up to the stop on the carriage;

5 К - величина зазора между т гой и упором.5 K is the size of the gap between the pull and the stop.

На фиг. 1 изображен предлагаемый кран, общий вид на фиг. 2 - узел FIG. 1 shows the proposed crane, a general view of FIG. 2 - knot

20 на фиг. 1.20 in FIG. one.

Подвесной мостовой кран содержит пролетную 1 и концевые балки 2 и 3, подвешенные к ходовым кареткам 4 и 5 с механизмами передвижени  б и 7, An overhead bridge crane contains a span 1 and end beams 2 and 3 suspended from the undercarriage 4 and 5 with the movement mechanisms b and 7,

25 безребордными катками 8, опиргисщимис  на подвесные пути 9, и горизонтальными направл ющими роликами 10, расположенными выше оси безребордных катков В, грузоподъемный механизм 25 bead rollers 8, which are supported on outboard tracks 9, and horizontal guide rollers 10, located above the axis of hopeless rollers B, a lifting mechanism

30 11 на пролетной балке 1. Концева  балка 3 соединена с ходо вой кареткой 5 парой т г 12 и 13, концы которых прикреплены к упом нутой балке и каретке посредством шарниров , оси которых 14 и 15 расположёны друг от друга на рассто нии 1, св занном соотношением рассто ние между ос ми т ги; допустима  величина непараллельности .подвесных путей; рассто ние от шарнира креплени  т ги к каретке до упора на каретке. Смещение пролетной балки от Номинального положени  ограничено упорами 16 на каретке. Вертикальна  стенка подвесного пу ти 9 снабжена накладками 17, с которыми взаимодействуют горизонтальные направл ющие ролики 10., закрепленные в кронштейнах 18 на каретке. Подвесной мостовой кран работает следующим образом. При включенных механизмах передви жени  б и 7 кран перемещаетс  вдоль подвесных путей 9. При этом непараллельность указанных путей и перекос крана компенсируютс  подвижным соединением одного из концевых балок 3 с кареткой 5 посредством пары т г 12 и 13 и наличием зазора К между т гами и упорами 16 на каретке, что исключает раскачивание пролётной балки 1. Наличие накладок 17 на сте ке подвесного пути 9 также уменьшает его износ. Применение предлагаемого изобреени  позволит уменьшить износ подесных путей, повысить надежность аботы подвесных мостовых кранов. формула изобретени  Подвесной мостовой кран, содержащий пролетную и кондевне балки, подвешенные к ходовым кареткам с механизмами передвижени , безребордными катками, опирающимис  на подвесные пути, и горизонтальньоми направл ющими роликами, грузоподъемный механизм на пролетной балке, отличающийс  тем, что, с целью уменьшени  износа подвижного пути, одна из концевых балок соединена с каждой ходовой кареткой парой т г, концы которых прикреплены к упом нутым балке и каретке посредством шарйиров , оси которых расположены друг от друга на рассто нии L, св занном соотношением I -с L Ъ рассто ние между осдми т ги/ допустима  величина непараллельности подвесных путей; рассто ние от шарнира крепле1Д1Я т ги к каретке до упора на каретке; величина зазора между т гой и упором. Источники информации, прин тые во внимание при экспертизе 1. Авторское свидетельство СССР №640959, КЛ. В 66 С 17/00, 1976.30 11 on the span beam 1. The end beam 3 is connected to the running carriage 5 by a pair of tg 12 and 13, the ends of which are attached to the beam and the carriage by means of hinges, whose axes 14 and 15 are spaced from each other at a distance of 1 the ratio between the axles of the gi; allowable value of non-parallelism. suspension paths; the distance from the hinge attachment gi to the carriage until it stops on the carriage. The offset of the span from the nominal position is limited by the stops 16 on the carriage. The vertical wall of the suspension path 9 is provided with plates 17, with which the horizontal guide rollers 10 interact, fixed in brackets 18 on the carriage. Suspended overhead crane works as follows. When the moving mechanisms b and 7 are turned on, the crane moves along the outboard tracks 9. At the same time, the non-parallelism of these ways and the crane skew are compensated by moving the connection of one of the end beams 3 to the carriage 5 by means of a pair of pipes 12 and 13 and the presence of a gap C between the cables and stops 16 on the carriage, which eliminates the swinging of the passage beam 1. The presence of the pads 17 on the stack of the suspension track 9 also reduces its wear. The application of the proposed invention will reduce wear on the tracks, increase the reliability of overhead bridge cranes. Claims: Suspended bridge crane, comprising span and beam beams, suspended from traveling carriages with movement mechanisms, roll-up rollers supported on suspension paths, and horizontal and guide rollers, a lifting mechanism on the span beam, characterized in that, in order to reduce rolling wear ways, one of the end beams is connected to each running carriage by a pair of tons of grams, the ends of which are attached to the said beam and the carriage by means of dairns, whose axes are located apart from each other and distance L, communication-bonded relation I c b L a distance between the thrust SDMX / admissible value parallelism hanging tracks; the distance from the hinge is fixed to the carriage up to the stop on the carriage; the size of the gap between the thrust and the stop. Sources of information taken into account in the examination 1. USSR author's certificate №640959, CL. B 66 C 17/00, 1976.

-i-i

и /and /

хххх.Лсухх/ху/ххх/х -а xxxx.Lsuhh / xy / xxx / x-a

/7/ 7

Я  I

Claims (1)

Формула изобретенияClaim Подвесной мостовой кран, содержащий пролетную и концевые балки, подвешенные к ходовым кареткам с механизмами передвижения, безребордными катками, опирающимися на подвесные пути, и горизонтальными направляющими роликами, грузоподъемный механизм на пролетной балке, отличающийся тем, что, с целью уменьшения износа подвижного пути, одна из концевых балок соединена с каждой ходовой кареткой парой тяг, концы которых прикреплены к упомянутым балке и каретке посредством шарйиров, оси которых расположены друг от друга на расстоянии L, связанном соотношением т > *‘с где L - расстояние между осдми тяги;An overhead overhead crane comprising a span and end beams suspended from running carriages with movement mechanisms, bezreborny rollers resting on suspension tracks, and horizontal guide rollers, a load-lifting mechanism on the span beam, characterized in that, in order to reduce wear of the moving track, one of the end beams is connected to each running carriage by a pair of rods, the ends of which are attached to the said beam and the carriage by means of hinges, the axes of which are located at a distance L connected from each other the ratio m> * ' s where L is the distance between the axle of the thrust; С - допустимая величина непараллельности подвесных путей;C is the permissible value of the non-parallelism of the suspension tracks; <Е - расстояние от шарнира креплеΛιη тяги к каретке до упора на каретке;<E is the distance from the hinge of the stronger Λιη thrust to the carriage to the stop on the carriage; К - величина зазора между тягой и упором.K is the gap between the thrust and the stop.
SU813268907A 1981-02-18 1981-02-18 Overhead bridge crane SU969644A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813268907A SU969644A1 (en) 1981-02-18 1981-02-18 Overhead bridge crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813268907A SU969644A1 (en) 1981-02-18 1981-02-18 Overhead bridge crane

Publications (1)

Publication Number Publication Date
SU969644A1 true SU969644A1 (en) 1982-10-30

Family

ID=20950888

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813268907A SU969644A1 (en) 1981-02-18 1981-02-18 Overhead bridge crane

Country Status (1)

Country Link
SU (1) SU969644A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5743702A (en) * 1996-05-03 1998-04-28 Gunderson; Michael J. Method and apparatus for a vehicle mounted hoisting system
RU2751102C1 (en) * 2020-10-28 2021-07-08 Федеральное государственное бюджетное образовательное учреждение высшего образования "Казанский государственный архитектурно-строительный университет" (КазГАСУ) End beam of hoisting crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5743702A (en) * 1996-05-03 1998-04-28 Gunderson; Michael J. Method and apparatus for a vehicle mounted hoisting system
RU2751102C1 (en) * 2020-10-28 2021-07-08 Федеральное государственное бюджетное образовательное учреждение высшего образования "Казанский государственный архитектурно-строительный университет" (КазГАСУ) End beam of hoisting crane

Similar Documents

Publication Publication Date Title
US5799755A (en) Linear motor transfer of cab horizontally between elevator and bogey platforms
SU969644A1 (en) Overhead bridge crane
CN104118803A (en) Arch gantry crane
GB2319239A (en) Horizontal transfer of elevator cab between elevator frame and landing bogey
US5507234A (en) Apparatus for correcting skew of a traveling crane
US2365821A (en) Compensating counterbalance for booms and the like
SU1730008A1 (en) Traveling crane
CN110282554A (en) A kind of scalable suspension bridge crane in girder both sides
SU1068375A1 (en) Overhead crane
US3459311A (en) Full-revolving bridge cranes
SU984981A1 (en) Overhead bridge crane
SU660879A1 (en) Overhead monorail track
SU477932A1 (en) Suspended multi-span crane
SU885414A2 (en) Device for erecting constructions
SU1544699A1 (en) Overhead travelling crane
SU865769A1 (en) Leading part of hoisting crane
SU931642A1 (en) Construction hoist
SU971779A1 (en) Cantilever-lock crane for erecting bridge structures
SU1523531A1 (en) Travelling crane
SU1252214A1 (en) Hauling device for overhead monorail
SU867850A1 (en) Bridge crane running gear
RU1794867C (en) Load-lifting crane
SU612894A1 (en) Bridge-type crane
SU472095A1 (en) Running gear for multi-support suspended bridge cranes
SU1217772A1 (en) Overhead travelling crane