SU954741A1 - Method of heat locking of tunnel furnaces and dryers - Google Patents
Method of heat locking of tunnel furnaces and dryers Download PDFInfo
- Publication number
- SU954741A1 SU954741A1 SU802992580A SU2992580A SU954741A1 SU 954741 A1 SU954741 A1 SU 954741A1 SU 802992580 A SU802992580 A SU 802992580A SU 2992580 A SU2992580 A SU 2992580A SU 954741 A1 SU954741 A1 SU 954741A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- zone
- dryer
- dryers
- hot air
- shrinkage
- Prior art date
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P40/00—Technologies relating to the processing of minerals
- Y02P40/60—Production of ceramic materials or ceramic elements, e.g. substitution of clay or shale by alternative raw materials, e.g. ashes
Landscapes
- Drying Of Solid Materials (AREA)
Description
(54) СПОСОБ ТЕПЛОВОЙ БЛОКИРОВКИ ТУННЕЛЬНЫХ ПЕЧЕЙ И СУШИЛОК(54) METHOD OF THERMAL BLOCKING OF TUNNEL FURNACES AND DRYERS
1one
Изобретение относитс к производству керамических стеновых материалов, преимущественно кирпича и керамических камней , а также керамических дренажных труб, и может быть использовано при производстве строительных материалов и изделий.The invention relates to the production of ceramic wall materials, mainly brick and ceramic stones, as well as ceramic drainage pipes, and can be used in the manufacture of building materials and products.
Известен способ тепловой блокировки туннельных печей и сушилок с зонами усадки и досушки материала путем отбора гор чего воздуха из зоны охлаждени печи и дымовых газов из зоны нагрева с подачей их в сушилку в конечный участок зоны усадки материала i,There is a method of thermally blocking tunnel kilns and dryers with shrinkage zones and drying the material by taking hot air from the cooling zone of the furnace and flue gases from the heating zone, feeding them into the dryer in the final section of the shrinkage zone of material i,
Недостаток известного способа, заключаетс в том, что он не обеспечивает полного использовани отбираемого тепла печей, при этом исключено попадание дымовых газов в рабочие помещени .A disadvantage of the known method is that it does not ensure the full utilization of the heat extracted from the furnaces, and flue gases do not enter the workrooms.
Цель изобретени - повышение теплового КПД.The purpose of the invention is to increase thermal efficiency.
Поставленна цель достигаетс тем, что отбирают отработавший теплоноситель из начального участка зонь досушки вThe goal is achieved by taking out the spent heat carrier from the initial part of the final drying zone to
колтгчестве 60-90% и смешивают его с , гор чим воздухом, а оставшуюс часть отработавшего теплоносител направл ют .в конечный участок зоны усадки в противотоке р материалом.the mixture is 60-90% and is mixed with hot air, and the remaining part of the spent coolant is directed to the final part of the shrinkage zone in countercurrent p material.
На фиг. 1 представлена схема туннельной печи и сушилки, поперечное сечение; на фиг. 2 - то же, вид сверху.FIG. 1 shows a diagram of a tunnel kiln and dryer, cross section; in fig. 2 - the same, top view.
Схема дл осуществлени предлагаемого способа тепловой блокировки включает туннельную печь 1 и сушилку 2, соединенные между собою вентил ционной системой, содержащей вентил тор 3, смесительную камеру 4, вентил тор 5, подачи теплоносител в зону 6 досушки сушилки 2 и вентил тор 7, отбирающий теплоноситель из зоны 6 досушки, составл ющие контур подачи го|э чего воздуха из зоны 8 охлаждени печи 1 в зону 6 суштшки 2, и вентил тор 9, смесительную камеру 1О, вентил тор 11 подачи теплоносит .ел в конечный участок зоны 12 усадки сушилки 2 и вентил тор 1 3 отбора отработавшего теплоносител из начального участка зоны 12, ,составп к щие контур подачи дымовых газов из ао ны 14 нагрева печи 1 в конечный ,учас- ток зоны 12 усадки сушилки 2. Материал размещают на тепежках 15. Между зоной 12 усадки и зоной 6 досушки сушипки 2 размещена перегородка 16. Атмосферный воздух 6 камеру 4 подают по стрелке А, а в камеру 1О - по стрелке Б. Способ тепловой блокировки туннель ной печи 1 и сушилки 2 по схеме, представленной на фиг. 1 и 2 осуществл ют следующим образом. Гор чий воздух из зоны 8 печи 1 вентил тором 3 подают в смесительную камеру 4, куда по стрелке А подают атмосферный воздух и отработавший теплоноситель нз зоны 6 досушки сушилки 2 вен тил тором 7. Из камеры 4 смесь гор чего воздуха, атмосферного воздуха и отработавшего теплоносител вентил тором 5 направл ют в начальный участок зоны 6 досушки. Причем из конечного участка зоны 6 досушки отбирают отработавшего теплоносител , направл емого в камеру 4, оставша с часть его поступает в противотоке с материалом размешенным на тележке 15, в зону 12 усадки сушилки 2. Количество этой части зо The scheme for implementing the proposed thermal interlocking method includes a tunnel furnace 1 and a dryer 2 connected between a ventilation system comprising a fan 3, a mixing chamber 4, a fan 5, supplying heat-transfer agent to zone 6 of dryer drier 2, and fan 7 selecting heat carrier from the drying zone 6, which make up the air supply circuit from air from the cooling zone 8 of the furnace 1 to the zone 6 of the dryer 2, and the fan 9, the mixing chamber 1O, the fan 11 supplying the heat transfer fluid to the final part of the drying zone 12 of the dryer 2 and fan 1 3 selection of the spent coolant from the initial section of zone 12, comprising the flue gas supply circuit from heating furnace 14 to the final heating unit 14, section 12 of the dryer 2 shrinkage. The material is placed on heat sinks 15. Between the shrink zone 12 and the drying zone 6 the bearings 2 contain a partition 16. Atmospheric air 6, chamber 4 is fed along arrow A, and into chamber 1O — along arrow B. A method of thermally blocking the tunnel furnace 1 and dryer 2 according to the scheme shown in FIG. 1 and 2 are carried out as follows. Hot air from zone 8 of furnace 1 is fed by fan 3 to mixing chamber 4, where arrow A serves atmospheric air and exhaust coolant from the dry-air dryer 6 zone 6 ventilator 7. From chamber 4, a mixture of hot air, atmospheric air and exhaust the heat carrier by the fan 5 is directed to the initial part of the drying zone 6. Moreover, from the final portion of the final drying zone 6, the spent heat carrier is taken, which is sent to chamber 4, the remaining part of it is supplied in countercurrent with the material placed on the trolley 15, into the drying zone 12 of the dryer 2. The amount of this portion is
теплоносител может быть регулируемой перегородкой 16.the heat carrier can be adjustable partition 16.
В конечный участок зоны 12 усадки сушилки 2 помимо части отработавшего теплоносител , поступающего из зоны 4, поступает смесь дымовых газов, подаваемых вентил тором 9 из зоны 14 нагреваIn the final section of the shrinkage zone 12 of the dryer 2, in addition to the part of the spent coolant coming from zone 4, a mixture of flue gases is supplied by the fan 9 from the heating zone 14
часть отработавшего теплоносител напра&л ют в конечный участок зоны .усадки в противотоке с материалом.A portion of the spent coolant is directed towards the final portion of the shrinkage zone in countercurrent with the material.
Источники информации, прин тые во внимание при экспертизе 1. Авторское свидетельство СССР NO 578545, кп. F 27 В 9/ОО, 1976 . ечи 1 в смесительную камеру 1О, атмооерный воздух, подаваемый по стрелке Б камеру 10, и отработавший теплонос тель , отбираемый из начального участка оны 12 усадки сушилки 2 вентил тором 13. Таким образом, часть отработавшего теплоносител в количестве 10-40%, направл ема в протовотоке с материа лом из конечного участка зоны 6 досушки сушилки 2 в конечный участок зоны 12 досушки, обеспечивает повышение теплового КПД туннельной печи 1 и сушилки 2. Форм ула изобретени Способ тепловой блокировки туннельных печей и сушилок с зонами усадки и досушки материала путем отбора гор чего воздуха из зоны охлаждени печи и дымовых газов из зоны нагрева с подачей их в сушилку в конечный участок зоны усадки материала, отличающийс тем, что, с целью повышени теплового КПД, отбирают отработавший теплоноситель из начального участка зоны досушки в количестве. 60-9О% и смешивают гор чим воздухом, а оставшуюс Sources of information taken into account in the examination 1. USSR author's certificate NO 578545, ce. F 27 B 9 / GS, 1976. Heat 1 to the mixing chamber 1O, atmo-mogenic air supplied along arrow B, chamber 10, and the exhaust coolant taken from the initial part of stage 12 are shrinkage of the dryer 2 by the fan 13. Thus, part of the exhaust coolant in the amount of 10-40% is directed in the flow of the material from the end portion of the drying zone 6 of the dryer 2 to the final portion of the drying zone 12, provides an increase in thermal efficiency of the tunnel kiln 1 and dryer 2. Formula of the invention Thermal blocking method of tunnel kilns and dryers with shrinkage zones and drying Material by taking hot air from the furnace cooling zone and flue gases from the heating zone with feeding them to the dryer in the final section of the material shrinkage zone, characterized in that, in order to increase thermal efficiency, the exhaust coolant is taken from the initial portion of the drying zone in quantity. 60-9O% and mix with hot air, and the rest
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802992580A SU954741A1 (en) | 1980-10-20 | 1980-10-20 | Method of heat locking of tunnel furnaces and dryers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802992580A SU954741A1 (en) | 1980-10-20 | 1980-10-20 | Method of heat locking of tunnel furnaces and dryers |
Publications (1)
Publication Number | Publication Date |
---|---|
SU954741A1 true SU954741A1 (en) | 1982-08-30 |
Family
ID=20921753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802992580A SU954741A1 (en) | 1980-10-20 | 1980-10-20 | Method of heat locking of tunnel furnaces and dryers |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU954741A1 (en) |
-
1980
- 1980-10-20 SU SU802992580A patent/SU954741A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2015144716A (en) | A UNIVERSAL METHOD FOR USING SLAG BALLS HEATED TO HIGH TEMPERATURES OBTAINED FROM ROTARY FURNACE FOR THE PRODUCTION OF PHOSPHORIC ACID, AND A TECHNOLOGICAL PROCESS OF SUCH USE | |
SE7906176L (en) | PROCEDURE FOR THE USE OF MINERAL MATERIALS IN A DIRECTORY-REGENERATIVE CHAMBER | |
GB1136864A (en) | Improved method of, and apparatus for, heat-treating minerals | |
US3312455A (en) | Method and apparatus for calcining gypsum in two stages | |
SU954741A1 (en) | Method of heat locking of tunnel furnaces and dryers | |
GB1371718A (en) | Continuous heat treating furnace | |
SU976267A1 (en) | Method of heat locking of tunnel furnace and dryer | |
SU578545A1 (en) | Method of heat interlocking of tunneltype furnaces and driers | |
JPH0618213Y2 (en) | Roof tile dryer | |
RU2024805C1 (en) | Set for producing cement clinker | |
SU139594A1 (en) | Horizontal multi-chamber continuous furnace for clinker firing in a fluidized bed | |
RU2010780C1 (en) | Method of manufacturing cement clinkers and plant for production thereof | |
FR2359800A1 (en) | Calcining powdered material, esp. cement - using heat exchanger in preheater stages to produce hot air used in precalcining chamber | |
SU832284A1 (en) | Method of utilizing heat for drying ceramic articles | |
GB1518233A (en) | Burning or sintering of cement clinker lime magnesite dolomite or similar materials | |
SU413354A1 (en) | ||
SU771075A1 (en) | Chamber for thermal treatment of mineral wool materials | |
SU1423895A1 (en) | Tunnel kiln | |
RU29992U1 (en) | Tunnel kiln | |
SU964396A1 (en) | Tunnel furnace | |
RU2059179C1 (en) | Heat unit | |
SU773409A1 (en) | Tunnel furnace | |
US1658331A (en) | Tunnel kiln | |
SU1296802A1 (en) | Method for drying gypsum and gypsum-concrete articles | |
CSIZI | APPLICATION OF WASTE HEAT TO BRICK PRODUCTION |