SU949180A1 - Method for controlling main roof in working coal seams with long stoping faces - Google Patents

Method for controlling main roof in working coal seams with long stoping faces Download PDF

Info

Publication number
SU949180A1
SU949180A1 SU803212625A SU3212625A SU949180A1 SU 949180 A1 SU949180 A1 SU 949180A1 SU 803212625 A SU803212625 A SU 803212625A SU 3212625 A SU3212625 A SU 3212625A SU 949180 A1 SU949180 A1 SU 949180A1
Authority
SU
USSR - Soviet Union
Prior art keywords
roof
coal
long
coal seams
main roof
Prior art date
Application number
SU803212625A
Other languages
Russian (ru)
Inventor
Алексей Алексеевич Борисов
Борис Петрович Овчаренко
Григорий Васильевич Овчаренко
Константин Никитич Лазченко
Павел Николаевич Дмитриев
Original Assignee
Ленинградский Ордена Ленина,Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Горный Институт Им.Г.В.Плеханова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ленинградский Ордена Ленина,Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Горный Институт Им.Г.В.Плеханова filed Critical Ленинградский Ордена Ленина,Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Горный Институт Им.Г.В.Плеханова
Priority to SU803212625A priority Critical patent/SU949180A1/en
Application granted granted Critical
Publication of SU949180A1 publication Critical patent/SU949180A1/en

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Description

(54) СПОСОБ УПРАВЛЕНИЯ ОСНОВНОЙ КРОВЛЕЙ(54) METHOD OF MANAGING PRIMARY ROOFING

ПРИ РАЗРАБОТКЕ УГОЛЬНБ1Х ПЛАСТОВ ДЛИННЫМИIN THE DEVELOPMENT OF CARBON LAYERS

ОЧИСТНЫМИ ЗАБОЯМИCLEANING PARTS

Изобретение относитс  к горной промышленности и предназначено дл  управлени  основной кровлей при разработке угольных пластов длинными очистными забо ми.The invention relates to the mining industry and is intended to control the main roof during the development of coal seams with long refining holes.

Известен способ управлени  кровлей fl .A known method of controlling the roof fl.

Однако данный способ недостаточно эффективен .However, this method is not effective enough.

Известен способ управлени  основной кровлей при разработке угольных пластов длинными очистными забо ми, включающий разгрузку пород кровли путем ослаблени  угольного массива впереди очистного забо  2.There is a known method of controlling the main roof when developing coal seams with long clearing holes, which includes unloading roof rocks by weakening the coal mass in front of the clearing holes 2.

Однако данный способ также характеризуетс  недостаточной эффективностью.However, this method is also characterized by insufficient efficiency.

Целью изобретени   вл етс  повышение эффективности управлени  кровлей за счет ее плавного опускани  и снижени  интенсивности вывалообразовани .The aim of the invention is to increase the efficiency of roof management by smoothly lowering it and reducing the intensity of the evacuation.

Поставленна  цель достигаетс  тем, что ослабление угольного массива производ т вертикальными щел ми, которые образуют путем разбуривани  из очистного забо  перпендикул рно кровле пласта на всю его мощность , причем глубину щели принимают равной двум м&щност м пласта, а рассто ниеThe goal is achieved by the fact that the weakening of the coal mass is produced by vertical gaps, which are formed by drilling out of the refining slab perpendicular to the roof of the reservoir for its full thickness, the depth of the slit being equal to two times the thickness of

между щел ми принимают равным мощности пласта.between the gaps is assumed to be equal to the thickness of the reservoir.

На фиг. 1 показана схема управлени  кровлей; на фиг. 2 - разрез А-А на фиг. 1.FIG. 1 shows a roof control circuit; in fig. 2 shows section A-A in FIG. one.

Способ осуществл етс  следующим образом .The method is carried out as follows.

При односторонней схеме выемки угл  бурение вертикальной щели 1 в угольном массиве 2 производ т на всю мощность пласта специальной буровой установкой 3, With a one-sided excavation scheme, coal drilling of a vertical slit 1 in coal mass 2 is performed on the entire thickness of the seam with a special drilling rig 3,

10 которую располагают на забойном конвейере 4 и передвигают по нему с помощью падающего механизма, использу  комбайновую цепь. Бурение производ т после того, как конвейер передвинут к забою во врем  выемки каждой очередной полосы угл  на рас15 сто нии 12-15 см от исполнительного органа комбайна 5. Первоначально шпуры бур т диаметром 42 мм выще почвы пласта на 0,2 м. Рассто ние между шпурами по линии, перпендикул рной плоскости пласта должно 10 which is located on the downhole conveyor 4 and is moved along it by means of a falling mechanism using a combine chain. The drilling is done after the conveyor is moved to the bottom during the excavation of each next strip of coal at a distance of 12-15 cm from the executive body of the combine 5. Initially, the holes were drilled with a diameter of 42 mm above the reservoir by 0.2 m. between the holes along the line perpendicular to the plane of the formation should

20 составл ть 3-4 см. После этого шпуры разбуривают коронкой диаметром 70-80 мм. Таким образом, в краевой зоне угольного пласта образуют вертикальные щели, перпендикул рные кровле пласта. При челно20 is 3-4 cm. After this, the holes are drilled with a crown with a diameter of 70-80 mm. Thus, in the marginal zone of the coal seam, vertical slots, perpendicular to the roof of the seam, are formed. With shuttle

Claims (1)

Формула изобретенияClaim Способ управления основной кровлей при разработке угольных пластов длинными очистными забоями, включающий разгрузку пород кровли путем ослабления угольного массива впереди очистного забоя, отличающийся тем, что, с целью повышения эффективности управления кровлей за счет ее плав5 ного опускания и снижения интенсивности вывалообразования, ослабление угольного массива производят вертикальными щелями, которые образуют путем разбуривания из очистного забоя перпендикулярно кровле 10 пласта на всю его мощность, причем глубину щели принимают равной двум мощностям пласта, а расстояние между щелями принимают равным мощности пласта.A method of controlling the main roof during the development of coal seams with long working faces, including unloading the roof rocks by loosening the coal mass in front of the working face, characterized in that, in order to increase the efficiency of roof management due to its smooth lowering and reduce the rate of dumping, the mass of coal is weakened vertical slots, which are formed by drilling from the stope perpendicular roof reservoir 10 for all its power, and the depth of the slot taking m seam thickness equal to two, and the distance between the slits is determined to be the power reservoir.
SU803212625A 1980-12-04 1980-12-04 Method for controlling main roof in working coal seams with long stoping faces SU949180A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU803212625A SU949180A1 (en) 1980-12-04 1980-12-04 Method for controlling main roof in working coal seams with long stoping faces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU803212625A SU949180A1 (en) 1980-12-04 1980-12-04 Method for controlling main roof in working coal seams with long stoping faces

Publications (1)

Publication Number Publication Date
SU949180A1 true SU949180A1 (en) 1982-08-07

Family

ID=20929932

Family Applications (1)

Application Number Title Priority Date Filing Date
SU803212625A SU949180A1 (en) 1980-12-04 1980-12-04 Method for controlling main roof in working coal seams with long stoping faces

Country Status (1)

Country Link
SU (1) SU949180A1 (en)

Similar Documents

Publication Publication Date Title
SU949180A1 (en) Method for controlling main roof in working coal seams with long stoping faces
RU2177546C1 (en) Method of controlling difficult-to-cave roof
SU623969A1 (en) Method of controlling tough roof
SU1239333A1 (en) Method of mining thin and medium-thick coal seams in a suit with unstable side rock
SU934004A1 (en) Method of roof control at mining of mineral beds
SU1105664A1 (en) Method of degassing a coal seam in pillar-less mining in columns
SU1032187A1 (en) Method of working neighrour coal seams
SU934006A1 (en) Method of working gently-sloping mineral beds
SU781351A1 (en) Method of mining sloping coal seams
RU2312988C1 (en) Method for selective hollow coal bed cutting
SU977815A1 (en) Method for working steeply sloping seams with mechanizd complexes
SU985294A1 (en) Method of controlling rock pressure in longwall
SU1188326A1 (en) Method of mining bedded deposits
SU949182A1 (en) Method for working gently sloping mineral seams
SU907251A1 (en) Method of working coal beds
SU922281A1 (en) Mine roof control method
SU723162A1 (en) Method of protecting preparatory mine workings
SU787656A1 (en) Solid roof control method
SU1046536A1 (en) Method for ventilating stoping face in working thick steep and inclined seams in horizontal splices using mechanized complexes
SU1665038A1 (en) Method of driving narrow-face workings with separate coal and rock extraction
RU1788261C (en) Method for mining ore bodies
RU2090757C1 (en) Method of prevention of sudden outbursts of salt and gas
SU827790A1 (en) Method of working thick gently sloping mineral deposits
SU768983A1 (en) Method of working steep coal seams
SU1249163A1 (en) Method of advance supporting of roof of stoping working