SU949180A1 - Method for controlling main roof in working coal seams with long stoping faces - Google Patents
Method for controlling main roof in working coal seams with long stoping faces Download PDFInfo
- Publication number
- SU949180A1 SU949180A1 SU803212625A SU3212625A SU949180A1 SU 949180 A1 SU949180 A1 SU 949180A1 SU 803212625 A SU803212625 A SU 803212625A SU 3212625 A SU3212625 A SU 3212625A SU 949180 A1 SU949180 A1 SU 949180A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- roof
- coal
- long
- coal seams
- main roof
- Prior art date
Links
Landscapes
- Ship Loading And Unloading (AREA)
Description
(54) СПОСОБ УПРАВЛЕНИЯ ОСНОВНОЙ КРОВЛЕЙ(54) METHOD OF MANAGING PRIMARY ROOFING
ПРИ РАЗРАБОТКЕ УГОЛЬНБ1Х ПЛАСТОВ ДЛИННЫМИIN THE DEVELOPMENT OF CARBON LAYERS
ОЧИСТНЫМИ ЗАБОЯМИCLEANING PARTS
Изобретение относитс к горной промышленности и предназначено дл управлени основной кровлей при разработке угольных пластов длинными очистными забо ми.The invention relates to the mining industry and is intended to control the main roof during the development of coal seams with long refining holes.
Известен способ управлени кровлей fl .A known method of controlling the roof fl.
Однако данный способ недостаточно эффективен .However, this method is not effective enough.
Известен способ управлени основной кровлей при разработке угольных пластов длинными очистными забо ми, включающий разгрузку пород кровли путем ослаблени угольного массива впереди очистного забо 2.There is a known method of controlling the main roof when developing coal seams with long clearing holes, which includes unloading roof rocks by weakening the coal mass in front of the clearing holes 2.
Однако данный способ также характеризуетс недостаточной эффективностью.However, this method is also characterized by insufficient efficiency.
Целью изобретени вл етс повышение эффективности управлени кровлей за счет ее плавного опускани и снижени интенсивности вывалообразовани .The aim of the invention is to increase the efficiency of roof management by smoothly lowering it and reducing the intensity of the evacuation.
Поставленна цель достигаетс тем, что ослабление угольного массива производ т вертикальными щел ми, которые образуют путем разбуривани из очистного забо перпендикул рно кровле пласта на всю его мощность , причем глубину щели принимают равной двум м&щност м пласта, а рассто ниеThe goal is achieved by the fact that the weakening of the coal mass is produced by vertical gaps, which are formed by drilling out of the refining slab perpendicular to the roof of the reservoir for its full thickness, the depth of the slit being equal to two times the thickness of
между щел ми принимают равным мощности пласта.between the gaps is assumed to be equal to the thickness of the reservoir.
На фиг. 1 показана схема управлени кровлей; на фиг. 2 - разрез А-А на фиг. 1.FIG. 1 shows a roof control circuit; in fig. 2 shows section A-A in FIG. one.
Способ осуществл етс следующим образом .The method is carried out as follows.
При односторонней схеме выемки угл бурение вертикальной щели 1 в угольном массиве 2 производ т на всю мощность пласта специальной буровой установкой 3, With a one-sided excavation scheme, coal drilling of a vertical slit 1 in coal mass 2 is performed on the entire thickness of the seam with a special drilling rig 3,
10 которую располагают на забойном конвейере 4 и передвигают по нему с помощью падающего механизма, использу комбайновую цепь. Бурение производ т после того, как конвейер передвинут к забою во врем выемки каждой очередной полосы угл на рас15 сто нии 12-15 см от исполнительного органа комбайна 5. Первоначально шпуры бур т диаметром 42 мм выще почвы пласта на 0,2 м. Рассто ние между шпурами по линии, перпендикул рной плоскости пласта должно 10 which is located on the downhole conveyor 4 and is moved along it by means of a falling mechanism using a combine chain. The drilling is done after the conveyor is moved to the bottom during the excavation of each next strip of coal at a distance of 12-15 cm from the executive body of the combine 5. Initially, the holes were drilled with a diameter of 42 mm above the reservoir by 0.2 m. between the holes along the line perpendicular to the plane of the formation should
20 составл ть 3-4 см. После этого шпуры разбуривают коронкой диаметром 70-80 мм. Таким образом, в краевой зоне угольного пласта образуют вертикальные щели, перпендикул рные кровле пласта. При челно20 is 3-4 cm. After this, the holes are drilled with a crown with a diameter of 70-80 mm. Thus, in the marginal zone of the coal seam, vertical slots, perpendicular to the roof of the seam, are formed. With shuttle
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU803212625A SU949180A1 (en) | 1980-12-04 | 1980-12-04 | Method for controlling main roof in working coal seams with long stoping faces |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU803212625A SU949180A1 (en) | 1980-12-04 | 1980-12-04 | Method for controlling main roof in working coal seams with long stoping faces |
Publications (1)
Publication Number | Publication Date |
---|---|
SU949180A1 true SU949180A1 (en) | 1982-08-07 |
Family
ID=20929932
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU803212625A SU949180A1 (en) | 1980-12-04 | 1980-12-04 | Method for controlling main roof in working coal seams with long stoping faces |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU949180A1 (en) |
-
1980
- 1980-12-04 SU SU803212625A patent/SU949180A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU949180A1 (en) | Method for controlling main roof in working coal seams with long stoping faces | |
RU2177546C1 (en) | Method of controlling difficult-to-cave roof | |
SU623969A1 (en) | Method of controlling tough roof | |
SU1239333A1 (en) | Method of mining thin and medium-thick coal seams in a suit with unstable side rock | |
SU934004A1 (en) | Method of roof control at mining of mineral beds | |
SU1105664A1 (en) | Method of degassing a coal seam in pillar-less mining in columns | |
SU1032187A1 (en) | Method of working neighrour coal seams | |
SU934006A1 (en) | Method of working gently-sloping mineral beds | |
SU781351A1 (en) | Method of mining sloping coal seams | |
RU2312988C1 (en) | Method for selective hollow coal bed cutting | |
SU977815A1 (en) | Method for working steeply sloping seams with mechanizd complexes | |
SU985294A1 (en) | Method of controlling rock pressure in longwall | |
SU1188326A1 (en) | Method of mining bedded deposits | |
SU949182A1 (en) | Method for working gently sloping mineral seams | |
SU907251A1 (en) | Method of working coal beds | |
SU922281A1 (en) | Mine roof control method | |
SU723162A1 (en) | Method of protecting preparatory mine workings | |
SU787656A1 (en) | Solid roof control method | |
SU1046536A1 (en) | Method for ventilating stoping face in working thick steep and inclined seams in horizontal splices using mechanized complexes | |
SU1665038A1 (en) | Method of driving narrow-face workings with separate coal and rock extraction | |
RU1788261C (en) | Method for mining ore bodies | |
RU2090757C1 (en) | Method of prevention of sudden outbursts of salt and gas | |
SU827790A1 (en) | Method of working thick gently sloping mineral deposits | |
SU768983A1 (en) | Method of working steep coal seams | |
SU1249163A1 (en) | Method of advance supporting of roof of stoping working |