SU781351A1 - Method of mining sloping coal seams - Google Patents

Method of mining sloping coal seams Download PDF

Info

Publication number
SU781351A1
SU781351A1 SU792710120A SU2710120A SU781351A1 SU 781351 A1 SU781351 A1 SU 781351A1 SU 792710120 A SU792710120 A SU 792710120A SU 2710120 A SU2710120 A SU 2710120A SU 781351 A1 SU781351 A1 SU 781351A1
Authority
SU
USSR - Soviet Union
Prior art keywords
excavation
workings
subsurface
insulating strips
coal seams
Prior art date
Application number
SU792710120A
Other languages
Russian (ru)
Inventor
Владимир Романович Сальников
Александр Егорович Сазонов
Юрий Гаврилович Пахтусов
Рудольф Прокопьевич Болотов
Данил Адольфович Каминский
Original Assignee
Всесоюзный научно-исследовательский и проектно-конструкторский институт добычи угля гидравлическим способом
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский и проектно-конструкторский институт добычи угля гидравлическим способом filed Critical Всесоюзный научно-исследовательский и проектно-конструкторский институт добычи угля гидравлическим способом
Priority to SU792710120A priority Critical patent/SU781351A1/en
Application granted granted Critical
Publication of SU781351A1 publication Critical patent/SU781351A1/en

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Description

Изобретение относитс  к горной промышленности и может быть использовано при разработке крутых угольных пластов. Известен способ разработки крутых угольных пластов, включающий проведение подготовительных выработок в выемочном . поле, разделение выемочного пол  на блоки и отработку блоков с оставлением между последними целиков угл  1. Однако данный способ характеризуетс  потер ми угл  и недостаточно безопасен. Известен способ разработки крутых угольных пластов, включающий проведение подготовительных выработок в пределах выемочного пол  и отработку пласта в последнем очистными забо ми с разделением выемочного пол  по простиранию на блоки изол ционными полосами из твердеющего ма териала, возводимыми по падению пласта 2. Однако данный способ характеризуетс  недостаточной интенсивностью ведени  горных работ, а также не .обеспечивает эффективной подэтажной гидроотбойки. Цель изобретени  - интенсификаци  горных работ и обеспечение эффективной подэтажной гидроотбойки угл  в выемочном поле. Поставленна  цель достигаетс  тем, что каждый подэтаж отрабатывают сразу на всю длину выемочного пол , при этом изол ционные полосы возвод т в каждом подэтаже с опережением над отработкой последнего путем выемки камер в пределах подэтажа и подачи в камеры твердеющего материала; подэтажные выработки в изол ционных полосах, расположенных в подлежащем отработке массиве пласта, поддерживают; подэтажные выработки в изол ционных полосах, расположенных в выработанном пространстве, заполн ют твердеющим материалом. На фиг. 1 изображена схема отработки пласта; на фиг. 2 - разрез А-А на фиг. 1. Способ заключаетс  в следующем. Вскрытие пласта осуществл ют подэтажными кверщлагами 1, проводимыми из грузоходового ската 2, из которых в дальнейщем провод т подэтажные щтреки 3. Грузо-ходовой скат соедин ют с кверщлагами 4 и 5 на уровне вентил ционного и транспортного горизонтов. На уровне транспортного горизонта от подэтажного кверщлага 1 до границThe invention relates to the mining industry and can be used in the development of steep coal seams. There is a method of developing steep coal seams, including the conduct of development workings in the excavation. the field, the division of the excavation field into blocks, and the development of blocks, leaving the pillar 1 between the last ones. However, this method is characterized by coal losses and is not safe enough. There is a method of developing steep coal seams, which includes carrying out preparatory workings within the excavation floor and testing the reservoir in the last clearing forks, separating the excavation floor along the strike of the blocks with insulating strips from the hardening material of reservoir 2. However, this method is characterized by insufficient mining intensity, and also does not provide an efficient sublevel hydrotube. The purpose of the invention is the intensification of mining operations and the provision of effective sublevel coal hydraulic extraction in the excavation field. The goal is achieved by the fact that each sub-floor is worked out immediately for the entire length of the excavation floor, while the insulating strips are erected in each sub-floor with anticipation of working out the latter by removing the chambers within the sub-floor and feeding hardening material into the chambers; subsurface workings in the insulating strips located in the reservoir mass to be tested are maintained; sublevel workings in insulating strips located in the worked-out space are filled with hardening material. FIG. 1 shows a reservoir mining scheme; in fig. 2 shows section A-A in FIG. 1. The method is as follows. The reservoir is opened by sublevel avers 1, carried out from a cargo slope 2, of which later are carried out by a sublevel 3. The load-running slope is connected to anchor 4 and 5 at the level of the ventilation and transport horizons. At the level of the transport horizon from the sublevel kverschlag 1 to the borders

выемочного пол  провод т аккумулирующий штрек 6, из которого на всю высоту выемочного пол  провод т вентил ционные печи- 7. Выемочное поле оконтуривают надквершлажными изол ционными полосами 8. Выемочное поле дел т на блоки путем возведени  изол ционных полос 9 из твердеющего материала . Межблоковые изол ционные полосы возвод т по мере выемки угл  в подэтажах с опережением 1-3 подэтажа. Полосы возвод т путем выемки камер в пределах подэтажа и подачи в камеры твердеющего материала. Подэтажные выработки в изол ционных полосах, расположенных в подлежащем отработке массиве пласта, поддерживают , а подэтажные выработки в изол ционных полосах, расположенных в выработанном пространстве, заполн ют твердеющим материалом 10. Подэтажные щтреки имеют уклон в сторону кверщлага 5 дл  безнапорного гидротранспорта к углеспускной выработке 11. Отбойку угл  в забо х 12 производ т гидромониторами 13.the excavation floor leads to an accumulation drift 6, from which ventilating furnaces are led to the entire height of the excavation floor 7. The extraction field is contoured with insulating wet strip 8. The extraction field is divided into blocks by building insulating strips 9 of hardening material. The interblock insulating strips erected as the coal was dredged in the sub-floors with an advance of 1-3 sub-floors. The strips are erected by removing the chambers within the substage and feeding the hardening material into the chambers. The subsurface excavations in the insulating strips located in the reservoir mass to be developed are maintained, and the subsurface excavations in the insulating strips located in the excavated space are filled with hardening material 10. The subsurface slopes are inclined towards Xervert 5 to free-flow hydrotransport to the coal-bearing excavation 11 The breaking of coal in the bottom x 12 is carried out by hydraulic monitors 13.

Данный способ позвол ет интенсифицировать горные работы и обеспечивает эффективную подэтажную гидроотбойку пласта.This method allows the intensification of mining operations and provides an effective sublevel formation hydraulic jacking.

Claims (3)

1. Способ разработки крутых угольных пластов, включающий проведение подготовительных выработок в пределах выемочноГО ПОЛЯ и отработку пласта в последнем очистными забо ми с разделением выемочного пол  по простиранию пласта на блоки изол ционными полосами из твердеющего материала, возводимыми по падению пласта, отличающийс  тем, что, с целью интенсификации горных работ и обеспечени  эффективной подэтажной гидроотбойки угл  в выемочном поле, каждый подэтаж отрабатывают сразу на всю длину выемочного пол  при этом изол ционные полосы возвод т в каждом подэтаже с опережением над отработкой последнего путем выемки камер в пределах подэтажа и подачи в камеры твердеющего материала.1. A method for developing steep coal seams, which includes carrying out development workings within the excavation FIELD and working the reservoir in the last clearing, separating the excavation floor along the strike of the reservoir into blocks with insulating strips of hardening material, in order to intensify mining operations and ensure efficient sublevel hydrotreating coal in the excavation field, each subsurface work immediately on the entire length of the excavation floor, while insulating strips erecting each substage t ahead of the last working off by chambers within recesses substage and in solidifying material supply chamber. 2.Способ по п. 1, отличающийс  тем, что подэтажные выработки в изол ционных полосах, расположенных в подлежащем отработке массиве пласта, поддерживают.2. A method according to claim 1, characterized in that the subsurface workings in the insulating strips located in the formation mass to be tested are maintained. 3.Способ по п. 1, отличающийс  тем, что подэтажные выработки в изол ционных полосах , расположенных в выработанном пространстве , заполн ют твердеющим материа-, лом.3. The method according to claim 1, characterized in that the subsurface workings in the insulation strips located in the worked-out space are filled with hardening material, scrap. Источники информации, прин тые во внимание при экспертизеSources of information taken into account in the examination 1.«Совершенствование подземной разработки угольных пластов Кузбасса. Прокопьевск, 1975, № 26, с. 30.1. “Improving the underground mining of Kuzbass coal seams. Prokopyevsk, 1975, No. 26, p. thirty. 2.Синайский В. П. Упрочнение закладочного массива при разработке мощных пластов в Кузнецком бассейне. М., ЦНИЭуголь, 1959, с. 51-55.2. Sinaisky V.P. Strengthening of the backfill array in the development of thick layers in the Kuznetsk basin. M., CNIEugol, 1959, p. 51-55. -чс -ch izz;izz;
SU792710120A 1979-01-05 1979-01-05 Method of mining sloping coal seams SU781351A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792710120A SU781351A1 (en) 1979-01-05 1979-01-05 Method of mining sloping coal seams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792710120A SU781351A1 (en) 1979-01-05 1979-01-05 Method of mining sloping coal seams

Publications (1)

Publication Number Publication Date
SU781351A1 true SU781351A1 (en) 1980-11-23

Family

ID=20804118

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792710120A SU781351A1 (en) 1979-01-05 1979-01-05 Method of mining sloping coal seams

Country Status (1)

Country Link
SU (1) SU781351A1 (en)

Similar Documents

Publication Publication Date Title
SU781351A1 (en) Method of mining sloping coal seams
RU2277170C1 (en) Development method for composite formations having gob interlayers
SU987103A1 (en) Method of working thick horizontal and gently sloping deposits
RU2099524C1 (en) Combined method of mining of formation of steeply dipping coal seams
SU934006A1 (en) Method of working gently-sloping mineral beds
SU1323716A1 (en) Method of remining mineral deposits
SU625059A1 (en) Method of conducting filling-up work
SU827790A1 (en) Method of working thick gently sloping mineral deposits
RU2232894C1 (en) Method for subterranean excavation of mineral deposits by means of chamber-column method
SU702170A1 (en) Method of mining thick steep coal seams
SU949179A1 (en) Method for underground working of seam deposits
SU861606A1 (en) Method of mining thin steeply deeping veins
SU690181A1 (en) Method of combined mining of mineral fields
SU589399A1 (en) Method of working thick steep coal-bearing seams
RU2091583C1 (en) Method of mining of mineral upper horizons
SU646054A1 (en) Method of mining steep ore deposits
RU2055209C1 (en) Method for creating underground drifts such as tunnels
SU742589A1 (en) Method of mining super-thin sharply assending seams
SU1122826A1 (en) Method of hydraulic mining of seam deposits
SU1151673A1 (en) Method of mining adjoining coal seams
SU1439240A1 (en) Method of combined exploitation of mineral deposits
SU636394A1 (en) Method of mining mineral deposits
SU771347A1 (en) Method of filling-up excavated area at shield system of mining
RU2038476C1 (en) Coal deposit exploitation method
SU773273A1 (en) Method of working the erection layer