SU943402A1 - Method of protecting preparatory mine workings - Google Patents
Method of protecting preparatory mine workings Download PDFInfo
- Publication number
- SU943402A1 SU943402A1 SU772513473A SU2513473A SU943402A1 SU 943402 A1 SU943402 A1 SU 943402A1 SU 772513473 A SU772513473 A SU 772513473A SU 2513473 A SU2513473 A SU 2513473A SU 943402 A1 SU943402 A1 SU 943402A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- wells
- coal
- reservoir
- forest
- workings
- Prior art date
Links
Description
(54) СПОСОБ ОХРАНЫ ПОДГОТОВИТЕЛЬНЫХ ГОРНЫХ ВЫРАБОТОК(54) METHOD FOR PROTECTING PREPARATORY MINING WORKS
1one
Изобретение относитс к горному делу, а именно к охране подготовительных выработок угольных шахт и может быть использовано при поддержании пластовых выработок в услови х высокого горного давлени .The invention relates to mining, in particular to the protection of preparatory workings of coal mines and can be used to maintain reservoir workings under conditions of high mining pressure.
Известен способ охраны пластовых подготовительных выработок, основанный на повышении несуш,ей способности краевой части массива угл , прилегаюшей к выработке , сушность которого заключаетс в том, что упрочнение пласта производ т цементными растворами или синтетическими смолами 1.The known method of protecting reservoir preparatory workings, based on increasing the hedges, is the ability of the marginal part of the coal mass adjacent to the mine, the drying of which lies in the fact that the formation is hardened with cement mortars or synthetic resins 1.
Недостаток его заключаетс в том, что в услови х большого опорного давлени на больших глубинах разработки угольных пластов вл ютс недостаточно надежными, так как несмотр на упрочнение краевой части массива угл , она не выдерживает горного давлени и, деформиру сь, создает крайне неблагопри тные услови дл поддержани выработки.Its disadvantage lies in the fact that under the conditions of a large bearing pressure at great depths, the coal seams are not reliable enough, because, despite the hardening of the edge part of the coal mass, it does not withstand rock pressure and, deformed, creates extremely unfavorable conditions maintain production.
Известен также способ охраны подготовительных горных выработок, включающий бурение по пласту разгрузочных скважин большого диаметра 2.There is also known a method for the protection of preparatory mine workings, which includes drilling a large-diameter discharge wells 2.
Недостатком данного способа вл етс его невысока надежность в устойчивости краевой части массива, поскольку после использовани резерва податливости пласта, т. е. после того как пустоты, образованные скважинами, будут ликвидированы, происходит усиленна деформаци пласта в сторону выработки, и как следствие, разрушение ее крепи.The disadvantage of this method is its low reliability in the stability of the edge part of the array, because after using the reservoir compliance reserve, i.e., after the voids formed by the wells are eliminated, the formation is deformed in the direction of production, and as a result, its destruction lining.
1Дель изобретени - повышение устойчивости подготовительных горных выработок1 of the invention - improving the sustainability of preparatory mine workings
Поставленна цель достигаетс тем, что в скважинах размещают отрезки леса, которые соедин ют между собой металлическими скобами.This goal is achieved by placing wood sections in the wells, which are interconnected with metal clips.
На чертеже изображена горна выработка и прилегающий массив, поперечный разрез.The drawing shows the hearth production and adjacent array, cross-section.
Способ осуществл етс следующим образом .The method is carried out as follows.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU772513473A SU943402A1 (en) | 1977-07-21 | 1977-07-21 | Method of protecting preparatory mine workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU772513473A SU943402A1 (en) | 1977-07-21 | 1977-07-21 | Method of protecting preparatory mine workings |
Publications (1)
Publication Number | Publication Date |
---|---|
SU943402A1 true SU943402A1 (en) | 1982-07-15 |
Family
ID=20720436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU772513473A SU943402A1 (en) | 1977-07-21 | 1977-07-21 | Method of protecting preparatory mine workings |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU943402A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060836A (en) * | 2017-06-08 | 2017-08-18 | 刘冲 | Coal column below the intersection of goaf with cutting ramus ophthalmicus maintaining method |
-
1977
- 1977-07-21 SU SU772513473A patent/SU943402A1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060836A (en) * | 2017-06-08 | 2017-08-18 | 刘冲 | Coal column below the intersection of goaf with cutting ramus ophthalmicus maintaining method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU943402A1 (en) | Method of protecting preparatory mine workings | |
RU2128773C1 (en) | Method for supporting mining workings with loose roof rock by anchor support | |
SU1710746A1 (en) | Method of working protection | |
RU2762170C1 (en) | Method for developing thin and low-powered steel-falling ore bodies | |
RU2304219C1 (en) | Method for development entry protection | |
RU2012804C1 (en) | Method for protection of workings from rock pressure | |
SU1763654A1 (en) | Method of controlling worked space roof | |
RU1828921C (en) | Method for working pillars in room-and-pillar mining system | |
SU887809A1 (en) | Method of mining sloping and gently sloping coal beds | |
RU2013546C1 (en) | Method for protection of reused workings | |
RU1775001C (en) | Method of reducing shock hazard in sinking | |
RU2046948C1 (en) | Stratum main drifts protection method | |
SU1643726A1 (en) | Method for tunneling mine workings under high rock pressure | |
SU898080A1 (en) | Mine shaft sinking method | |
SU1550157A1 (en) | Tunnel construction method | |
SU625044A1 (en) | Method of supporting mine workings | |
SU791975A1 (en) | Method of driving preparatory working in beds prezenting coal and gas outburst hazard | |
SU1553706A1 (en) | Method of constructing a mine working | |
SU1751349A1 (en) | Method of controlling floor heaving in mine workings | |
SU1023099A1 (en) | Method of enhancing mine working stability | |
SU817253A1 (en) | Method of driving a mine working | |
SU1390372A1 (en) | Method of driving mine working near outburst-hazardous body | |
SU729360A1 (en) | Method of relieving strain of mine working contour | |
SU1735583A1 (en) | Method for protection of development workings used repeatedly in coal mining | |
SU1168723A1 (en) | Mine working supporting method |