SU1023099A1 - Method of enhancing mine working stability - Google Patents

Method of enhancing mine working stability Download PDF

Info

Publication number
SU1023099A1
SU1023099A1 SU813284977A SU3284977A SU1023099A1 SU 1023099 A1 SU1023099 A1 SU 1023099A1 SU 813284977 A SU813284977 A SU 813284977A SU 3284977 A SU3284977 A SU 3284977A SU 1023099 A1 SU1023099 A1 SU 1023099A1
Authority
SU
USSR - Soviet Union
Prior art keywords
destruction
rocks
drilling
depth
zone
Prior art date
Application number
SU813284977A
Other languages
Russian (ru)
Inventor
Валерий Михайлович Пичковский
Гарри Григорьевич Литвинский
Геннадий Васильевич Бабиюк
Петр Павлович Луцик
Аркадий Семенович Эпштейн
Владимир Николаевич Мусиенко
Original Assignee
Коммунарский горно-металлургический институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Коммунарский горно-металлургический институт filed Critical Коммунарский горно-металлургический институт
Priority to SU813284977A priority Critical patent/SU1023099A1/en
Application granted granted Critical
Publication of SU1023099A1 publication Critical patent/SU1023099A1/en

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

СПОСОБ ПОВЫШНИЯ УСТОЙЧИВОСТИ ГОРНЫХ ВЫРАБОТОК , ВКЛЮЧа щий создание вон разрушени  бмтаюцнх пород по контуру вш абЬтки путем бурени  шпуров, зар жени  их какуфлет1Шм  зар дами и взрывани  с поспе уюеаш бурением тампонажных скважин   нагнетанием в разрушенные порода скреил ошего , о тл и ч а ю щ и и с   тем, что, с цепью снйжежс  з.атрат на KpejnneHHe и ремонт attpaeoTox, разрушениевмета ших пород производ т в два этапа , при этом вначале создают глубин, ную зону разрушени  по на1фавлению действи  максимального глеш ого напр жени  породном массиве, а поспеду шее разрушение пород по хонту- Q ру шработк  {фойзвод т на меньшей 9 глубине. - tefA METHOD FOR INCREASING STABILITY OF MINING PROCESSES, INCLUDING CREATION OF APPLICATION OF APRILS OF BTHTAYOUS ROCKS ON THE CIRCUITS OF THE STANDARDS BY DRILLING BLOCKHOLDS, BURNING THESE CASAUTLETS WITH CHARGES AND EXPLOSIVES WITH THE BELIEF BASED WELL BELOWING CURAGRAM, I used the materials. and with the fact that, with a chain of lowering the costs of KpejnneHHe and repairing the attpaeoTox, the destruction of the outlying rocks is carried out in two stages, while at the same time creating the depths, the zone of destruction by the maximum ground pressure of the rock mass willow, and in the future, the destruction of rocks by honto-Q ru shrabotk {fozvod t less 9 depth. - tef

Description

Изобретение относитс  к способа ; повьЕиени  устойчивости горных виработок . Известен способ борьбы с пучением почвы в горных выработках , включающий создание с помощью камуфлетного .взрыва в почве пласта вблизи контура выработки зоны разрушенной породы 1. Недостатком такого способа  вл етс  ограниченна  область применени  и незначительное врем  воздей стви  на породный массив, Наиболее близким к изобретению по технической сущности и достигаемому результату  вл етс  способ повышени  устойчивости горных выработок , включающий создание зон разрушени  вмещающих пород по контуру выработки путем бурени  шпуров, зар жани  их камуфлетными зар дами и взрывани  с последующим бурением тампонажных скважин и нагнетанием в разрушенные породы скрепл ющего раствора 2j . Однако в данном способе, вследствие нерационашьного перераспределени  напр жений во вмещающих пород не всегда обеспечиваетс  необходима УСТОЙЧИВОСТЬ обработки и снижение затрат на ее крепление и ремонт. Цель изобретени  - снижение затрат на крепление и ремонт выработок Цель достигаетс  тем, что соглас но способу повышени  устойчивости горных выработок, включаижьему созда ние зон разрушени  вмещающих пород по контуру выработки путем бурени  шпуров, зар жани  их камуфлетными зар дами и взривани  с последующим бурением тампонажных скважин и нагнетанием э ра зрушенные породы скреп л ющего раствора,разрушение вмещающ пород проиввод т в два этапа, при этом вначале создают глубинную зону разрушени  по направлению действи  максимального главного напр жени  в породном массиве, а послвдУю{1 е разрушение пород по контуру выработ ки производ т на меньшей глубиие. На фиг,1-4 изображены этапы осуществлени  способа пов1Л11ени  устойчивости горных выработок при горизо тальном залегании пород; на фиг. 5 зоны разрушени  и упрочнени  пород при крутс залегании, Технологи  способа повышени  ус тойчивостИ горных выработок заключаетс  в следующем. При проведевии выработки 1 до на чала самопроизвольного разрушени  пород производ т определение величины и направлени  главных напр жений в массиве, например следующие способом, В центре забо  вЕфаботки при проходке бур т опережающие скважины на глубину, равную двум заходкам , В каждую скважину вставл ют фотоупругий датчик из оптически активного материала. После подвигани  , забо  отработки на величину заходки снимают пол рископе показани  датчика , по интерференционной картине которого определ ют-ориентировочно величину и направление главных напр жений в массиве 2 и 3, Затем по направлению действи  максимального главного напр жени  2 в породном массиве в одной плоскости бур т скважины 4, глубину которых определ ют по величине козффициента бокового распора, исход  из услови , чтобы сжимс1ющие напр жени  на контуре выработки были примерно одинаковыми. Скважины 4 зар жают взрывчатым вещест-, вом и производ т камуфлетные взрывы,: В результате взрывов в горне массиве образуетс  искусственна  зона разрушени  пород 5, После этого бур т б, зар жают их взрывчатым ;веществом и производ т дополнительные камуфлетные взрывы, Параме-гры БЗР (глубина и схема расположени  шпуров, величина и конструкци  зар доа ) определ ют из услови  обеспечени  интенсивного и равномерного треадинообразовани  в зоне разрушени  7 и соблюдени  камуфлетности: взрыва. После создани  зон разрушени  7 бур т тампонажнью скважины 8, вставл ют в них кондукторы и посатвдова1тельно нагветгиот в приконТ5ФНУЮ часть разр;т1енных пород скрепл ющий раствор по данной схеме, При нагнетании скрепл ющего раствора рекомендуетс  использовать принцип восход щего потока, при котором отсутствует опасность расслоени  смеси, а длину тампонажных скваикин 8 принимают приблизительно равной глубине зоны упрочнени  9, Скважины 8 размещают равномерно, чтобы исключалась вомложность получени  незатампонированных участков. Количество р дов скваикин 8 в поперечном сечении назначают в зависимости ох отношени  глубины зоны упрочнени  9 к размерам вьфаботки 1, При значении отношени  более 0,75 дл  упрочнени  разрушенных пород рекомендуетс  устраивать один р д сквг1жин 8 по оси выработки 1, а менее 0,25 - три р да скважин 8, Расход раствора принимают равньш объему пустот в зоне упрочнени  9, Несущук способность уг рочненной зоны 9 рассчитывсцот в згшисимости от ожидаемого горного дашленк , П р и м е р. Новый способ испытан в шахте в откаточном штреке, проводимом на глубине 750 м и в але вролитах с прочностью на Одноосное сжатие 32 МПа и углом падени  60,This invention relates to a method; PoVaIeni sustainability mountain workings. There is a method of combating soil heaving in mines, including the creation of a camouflet blast in the soil of the reservoir near the contour of the zone of the destroyed rock 1. The disadvantage of this method is the limited scope and time of impact on the rock mass. the technical essence and the achieved result is a method of increasing the stability of mine workings, including the creation of zones of destruction of the host rocks along the contour of the mine by drilling holes, charging them with camouflage charges and blasting followed by drilling of cement wells and injecting the 2j cementing solution into the destroyed rocks. However, in this method, due to the inefficient redistribution of stresses in the host rocks, it is not always ensured that the STABILITY of processing and the reduction of the costs of its mounting and repair are necessary. The purpose of the invention is to reduce the cost of fixing and repairing workings. The goal is achieved by agreeing on a method for increasing the stability of mine workings, including creating zones of host rock destruction along the production contour by drilling holes, charging them with camouflage charges and boiling down the wells. and the injection of broken rocks of the binding solution, the destruction of the containing rocks is carried out in two stages, while first creating a deep zone of destruction in the direction of the maximum avnogo stress in the rock mass, and f {1 poslvdUyu destruction sawmills contour vyrabot ki produced on a lesser depth. Figures 1-4 show the steps of the method for increasing the stability of mine workings during horizontal occurrence of rocks; in fig. 5 of the zone of destruction and hardening of the rocks during the occurrence of torsions, the technologist of the method for increasing the stability of mine workings is as follows. When the generation 1 is performed before the start of spontaneous rock destruction, the magnitude and direction of the main stresses in the massif are determined, for example, by the following method. In the center of the bottom of the workplace, when drilling the drill leading wells to a depth equal to two bores, a photoelastic sensor is inserted from optically active material. After the advancement, testing for the magnitude of the inlet removes the risk of the sensor reading the floor, the interference pattern of which determines the approximate magnitude and direction of the main stresses in array 2 and 3, then in the direction of the maximum main stress 2 in the rock mass in one plane tons of wells 4, the depth of which is determined by the lateral thrust coefficient, based on the condition that the compressive stresses on the production contour are approximately the same. Wells 4 are charged with explosives and they produce camouflage explosions: As a result of the explosions in the mountain range, an artificial rock destruction zone 5 is formed, then the drill is b, charged with explosives, and additional camouflet explosions are produced by the substance, Parame RRBs (depth and hole pattern, magnitude and design of charge) are determined from the condition of providing intensive and uniform treadin formation in the zone of destruction 7 and observance of camouflage: explosion. After the creation of zones of destruction 7, the wells of the well 8 are drilled, the conductors are inserted into them and, finally, the elevators are placed into the near-T5FNU part of the discharge; the bonding rock according to this scheme. the mixture, and the length of the cementing squaikin 8 is approximately equal to the depth of the hardening zone 9, the wells of the 8 are evenly spaced to prevent the formation of uncompiled sections. The number of rows of squaikin 8 in cross section is prescribed depending on the ratio of the depth of the hardening zone 9 to the dimensions of the fabric 1, If the ratio is more than 0.75, it is recommended to arrange one row of squares of 8 for the hardening of the destroyed rocks, and less than 0.25 - three rows of wells 8, the flow rate of the solution is equal to the volume of voids in the reinforcement zone 9, the bearing capacity of the hazardous zone 9 is calculated depending on the expected mountain range, PRI me R. The new method has been tested in a mine in a haulage drift conducted at a depth of 750 m and in a la vrolite with a uniaxial compression strength of 32 MPa and a dip angle of 60,

Работы выполн ли по следующей схеме . Ввачале в лежачем боку выработки через 2 м друг от друга бур т скважины длиной 6,5 м. Сквгиккны зар жали аммонитсш7-19 по 0/9 кг в каждую и производили каму4лет1ный взрыв. Затем в почве выработки на глубину 1,5 м бурили шпуры, которые зар жали зар дами Т- 19 весом 0,2 кг и производили также камуфпетные взрывы . По разрушенным породам на глубину 1,5 м бурили скважины-и черезни1 ; нагнетали цементно-песочный раствор, расход которогф на 1 п.м вцра ботки в среднем составл л 1,2 ,5 м .The work was performed as follows. At a length of 2 m apart from each other, a borehole with a length of 6.5 m was inserted in the grab in the recumbent side. Squigms charged ammonites 7–19 of 0/9 kg each and produced a camouflage explosion. Then, holes were drilled in the soil at a depth of 1.5 m, which charged T-19 with a weight of 0.2 kg and also produced camouflage explosions. Over the destroyed rocks to a depth of 1.5 m, wells were drilled — and through 1; A cement-sand mortar was injected, the flow rate of which per meter was 1 .5 meters in average was 1.2, 5 m.

После приАюнени  способа в выработке конвергенци  почвы и кровли не превышала 165 мм, а крепь сохран ла свою работоспособность. Ваковтр ,ольных участках крепь полностью радрушена , а величина полу ени  пород составила 850 i«4.After the arrival of the method in developing the convergence of the soil and the roof, it did not exceed 165 mm, and the lining preserved its working capacity. Vaktr, the left parts of the lining are completely destroyed, and the size of the formation of rocks was 850 i 4 4.

Claims (1)

СПОСОБ ПОВЫШЕНИЯ УСТОЙЧИВОСТИ ГОРНЫХ ВЫРАБОТОК , включающий создание вон разрушения вминающих пород по контуру выработки путем бурения шпуров, заряжения их ка- : муфлетными зарядами и взрывания с последующим бурением тампонажных скважин и нагнетанием в разрушенные порода скрепляющего раствора, о τη и ч а ю щ и й с я тем, что, с целью снижения затрат на крепление и ремонт выработок, разрушение вмещающих пород производят в два этапа , при этом вначале создают глубинную зону разрушения по направлению действия максимального главного напряжения в породном массиве, а последующее разрушение пород по конту- β ру выработки производят на меньшей S глубине.METHOD FOR INCREASING STABILITY OF MINING WORKS, including creation of destruction of crushing rocks along the production contour by drilling holes, charging them with camouflage charges and blasting, followed by drilling of cement wells and injecting a bonding solution into the rock, about τη and with the fact that, in order to reduce the cost of fixing and repairing the workings, the destruction of the enclosing rocks is carried out in two stages, while at first they create a deep zone of destruction in the direction of the maximum principal stress a rock mass, and subsequent destruction of rocks by the contour generation β py produce at a lesser depth S. а ©a ©
SU813284977A 1981-05-04 1981-05-04 Method of enhancing mine working stability SU1023099A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813284977A SU1023099A1 (en) 1981-05-04 1981-05-04 Method of enhancing mine working stability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813284977A SU1023099A1 (en) 1981-05-04 1981-05-04 Method of enhancing mine working stability

Publications (1)

Publication Number Publication Date
SU1023099A1 true SU1023099A1 (en) 1983-06-15

Family

ID=20956797

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813284977A SU1023099A1 (en) 1981-05-04 1981-05-04 Method of enhancing mine working stability

Country Status (1)

Country Link
SU (1) SU1023099A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2468207C1 (en) * 2011-04-05 2012-11-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method for reinforcement of mines soil

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР 16.0139, кл, Е 21 D 11/00, 1962. 2. Литвинсх й Г.Г. н др. Обратный свод крепи из разгруженных от напр жений и упрочненных пород почвы «Уголь Украины, ISffO, 9 2, с.14-15 .(нроготип). 54) *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2468207C1 (en) * 2011-04-05 2012-11-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method for reinforcement of mines soil

Similar Documents

Publication Publication Date Title
CN101806066B (en) Method for molding vertical wall of deep foundation pit
CN104596375A (en) Fully mechanized excavation construction method for rock roadway
SU1023099A1 (en) Method of enhancing mine working stability
RU2083831C1 (en) Method for treatment of impact-risky seams in difficult mining and geological conditions
RU2172837C2 (en) Method of protection of in-bed mine workings
RU2132950C1 (en) Method for combination development of deposits
RU2010953C1 (en) Method of determination of cracks spreading height in basic zone of working
SU1263868A1 (en) Method of controlling the strained state of rock about mine working
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
RU2304219C1 (en) Method for development entry protection
SU1305365A1 (en) Method of preventing bulging of soil
SU1608345A1 (en) Method of mining mineral deposits
SU1390372A1 (en) Method of driving mine working near outburst-hazardous body
RU2030508C1 (en) Method for prevention of open pit landslides
SU1652614A1 (en) Method for fighting gas-dynamic phenomena in mining coal seams
SU1328549A1 (en) Method of driving workings close to outburst-hazardous rock
RU2047769C1 (en) Method for working steeply dipping ore bodies
RU1775001C (en) Method of reducing shock hazard in sinking
SU1666710A1 (en) Method for development of mineral deposits
Roy et al. Presplit blasting for stabilization of highwall slopes and productivity enhancement in a trench-mining project
SU1028847A1 (en) Method of mining thick ore deposits
SU791975A1 (en) Method of driving preparatory working in beds prezenting coal and gas outburst hazard
RU2046942C1 (en) Mountain rocks cutting method
SU827791A1 (en) Method of working thick mineral deposits
SU1580014A1 (en) Method of guarding mine working