SU89894A1 - The method of operation of the individual dust preparation system for furnaces of steam boilers and industrial furnaces - Google Patents

The method of operation of the individual dust preparation system for furnaces of steam boilers and industrial furnaces

Info

Publication number
SU89894A1
SU89894A1 SU414669A SU414669A SU89894A1 SU 89894 A1 SU89894 A1 SU 89894A1 SU 414669 A SU414669 A SU 414669A SU 414669 A SU414669 A SU 414669A SU 89894 A1 SU89894 A1 SU 89894A1
Authority
SU
USSR - Soviet Union
Prior art keywords
furnaces
dust
preparation system
fuel
steam boilers
Prior art date
Application number
SU414669A
Other languages
Russian (ru)
Inventor
В.Л. Пошехонов
Original Assignee
В.Л. Пошехонов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by В.Л. Пошехонов filed Critical В.Л. Пошехонов
Priority to SU414669A priority Critical patent/SU89894A1/en
Application granted granted Critical
Publication of SU89894A1 publication Critical patent/SU89894A1/en

Links

Landscapes

  • Combustion Of Fluid Fuel (AREA)

Description

npeflMeioN изобретени   вл етс  способ работы системы индивидуального пылеприготовленн  дл  топок паровых котлов и промышленных печей.The inventive MeioN of the invention is a method for operating an individual dust-prepared system for boilers and industrial furnaces.

Описываемый способ отличаетс  от существующих тем, .что он позвол ет создать запас сухого топлива в промежуточном бункере и тем ускорить растопку котла без .генени  мазута, а также дает возможность производить подсыпку сухого топлива по тракту топливоподачи , с целью придани  сыпучести сырому топливу. Дл  придапи  сыпучести сырому топливу поток аэропыли после мельничной установки раздел етс  на два потока, из которых один, основной, направл етс  непосредственно в основные топливные горелки, а другой, меньший, через циклон в нылевой бункер, с последуюп1,им иснользованием этой пыли по указаппому назначению.The described method differs from the existing topics in that it allows to create a supply of dry fuel in the intermediate bunker and in that way accelerates the kindling of the boiler without fuel oil generation, and also makes it possible to add dry fuel along the fuel supply path in order to give flowability to the raw fuel. To adapt the flowability of the raw fuel, the air flow after the mill installation is divided into two streams, one of which, the main one, is sent directly to the main fuel burners, and the other, smaller, through a cyclone into a hole hopper, followed by this dust purpose.

На чертеже изображена схема системы пылеприготовлени .The drawing shows a diagram of the dust preparation system.

Система индивидуального пылеприготовлени  состоит из мельничной устаповки /, основных топливных горелок 2 топки 3, дополнительных горелок 4, циклопа 5, промежуточного бункера 6, пылепитателе 1 7, шнека 8 и вентил тора 9 с соединительными пылепроводами и воздухопроводами.The individual dust preparation system consists of mill installation /, main fuel burners 2 firebox 3, additional burners 4, cyclops 5, intermediate hopper 6, dust picker 1 7, screw 8 and fan 9 with connecting dust pipes and air ducts.

В мельничную установку / входит бункер сырого топлива с питателем, собственно мельница (сепаратор и мельничный вентил тор на чертеже не показаны).The mill installation / includes a raw fuel bunker with a feeder, the mill itself (the separator and the mill fan are not shown in the drawing).

Часть аэросмеси от мельпичной установки / поступает непосредственно в основные горелки 2 топки X а друга  часть отсасываетс  в циклоп 5 вентил тором 9.Part of the mixture from the mill installation / enters directly into the main burner 2 of the furnace X and the other part is sucked into the cyclop 5 by the fan 9.

Пыль, уловленна  циклонолт 5, накапливаетс  в промежуточном бункере 6, под которым расположены пыленитатели 7 по числу дополнительных горелок 4. Последние служат дл  ускорени  растонки котла без применени  мазута, дл  «подсвеч1нзани ; топки при малых пагрузках.The dust trapped by cyclonets 5 accumulates in the intermediate bunker 6, under which the dust collectors 7 are located according to the number of additional burners 4. The latter serve to accelerate the boiler spout without the use of fuel oil, for backlighting; firebox at small load.

Кроме того, подготовленное топливо в промежуточном бункере 6 служит дл  подсыпки сухого тонлива по тракту топливоподачи дл  гфедотврап;епн  слппанн  влажного топлива.In addition, the prepared fuel in the intermediate bunker 6 serves to add dry toning along the fuel supply line for the hydrofluoroprop;

Рециркул ци  в пылепроводе 10 осуществл етс  в тех случа х, когда количество агента, необходимого дл  минимальной вентил ции мельницы , оказываетс  больше пропускной способности циклона 5.The recirculation in the dust duct 10 is carried out in cases where the amount of agent required for minimum ventilation of the mill is greater than the throughput of the cyclone 5.

При нормальном эксплуатационном режиме в работе находитс  мельнична  установка / только с основными горелками 2. . По мере надобности включаютс  дополнительные горе.пки 4, питаемые пылЬю из бункера 6 включением в работу питателен 7 и вентил тора 9.Under normal operating conditions, there is a mill installation in operation / only with main burners 2.. As needed, additional mounts 4, powered by dust from the bunker 6, are switched on by switching on the power supply 7 and the fan 9.

При ма,1ых или колеблющихс  нагрузках топки, а также при форсировке ее, донолпительные горелки 4 работают непре|)ывно, параллельь о с основными горелками 2.When ma, 1st or oscillating loads of the firebox, as well as when forcing it, donal-burners 4 work continuously, parallel to the main burners 2.

Предмет изобретени Subject invention

Способ работы системы индивидуального пылеприготовлени  дл  топок паровых котлов и промышленных печей, о т л и ч а ю щ и и с   тем, что, с целью обеспечени  установки сухим топливом, необходимым при растопке и подсвечивании котла , а также подсыпки его по тракту топливоподачи, дл  предотвращени  слипани  там топлива.The method of operation of the individual dust preparation system for the furnaces of steam boilers and industrial furnaces is necessary in order to provide the plant with dry fuel necessary for heating and lighting the boiler, as well as adding it along the fuel feed path, to prevent fuel sticking there.

Циклон 5, пылепитатели 7 и вентил тор 9 работают непрерывно.Cyclone 5, dust suppressors 7 and fan 9 operate continuously.

При растапливании топки и при 1{аличии соседнего агрегата, паход п 1 ,егос  в работе, готова  пы.чь от последнего подаетс  шнеком 8 в бункер 6 и далее транспортируетс  гор чим воздухом в дополнительнь е горелки 4 включением в работу вентил тора 9.When the furnace is melted and at 1 {the presence of a neighboring unit, the pass n. 1, which is in operation, is ready from the latter, is fed by the screw 8 to the bunker 6 and further transported by hot air to the additional burner 4 by switching on the fan 9.

Гор чий воздух в этом режиме также подаетс  от соседнего агрегата по коллектору 11.Hot air in this mode is also supplied from a neighboring unit through the manifold 11.

При использовании пыли дл  увеличени  сыпучести сырого топлива вк.чючаетс  в работу циклоп 5, пыль из которого выдаетс  на шнек 8 и далее поступает в бункер сырого угл  данной установки или соседних с ней.When using dust to increase the flowability of raw fuel, it is poured into the work of the Cyclops 5, the dust from which is delivered to the screw 8 and then enters the raw coal bunker of this installation or its neighbors.

поток аэропыли после мельничной установки раздел етс  на два потока , из которых первый, основной, направл етс  непосредственно в основные горелки топки, а второй, меньший, через циклон в пылевой бункер, с последующим использованием этой пыли дл  растопки, подсвечивани  котла, а также подсыпки по тракту топливоподачи.the air stream after the mill installation is divided into two streams, of which the first main stream is directed directly to the main burners of the furnace, and the second, smaller one, through a cyclone into the dust bunker, followed by using this dust for kindling, lighting the boiler, and bedding on the path of the fuel supply.

SU414669A 1950-03-23 1950-03-23 The method of operation of the individual dust preparation system for furnaces of steam boilers and industrial furnaces SU89894A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU414669A SU89894A1 (en) 1950-03-23 1950-03-23 The method of operation of the individual dust preparation system for furnaces of steam boilers and industrial furnaces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU414669A SU89894A1 (en) 1950-03-23 1950-03-23 The method of operation of the individual dust preparation system for furnaces of steam boilers and industrial furnaces

Related Child Applications (1)

Application Number Title Priority Date Filing Date
SU762423857A Addition SU650143A2 (en) 1976-11-23 1976-11-23 Unized distributing device cabinet

Publications (1)

Publication Number Publication Date
SU89894A1 true SU89894A1 (en) 1950-11-30

Family

ID=48261041

Family Applications (1)

Application Number Title Priority Date Filing Date
SU414669A SU89894A1 (en) 1950-03-23 1950-03-23 The method of operation of the individual dust preparation system for furnaces of steam boilers and industrial furnaces

Country Status (1)

Country Link
SU (1) SU89894A1 (en)

Similar Documents

Publication Publication Date Title
CN104344398B (en) Middle warehouse formula pulverized coal carried by hot air pulverized coal preparation system
CN105864748A (en) Combined combustion system of chain boiler
CN105240841A (en) Multi-coal adaptive low-NOx-emission chain grate furnace capable of adjusting flue gas recirculation
CN201582846U (en) Combustion control system of lignite unit
CN106940026A (en) Boiler milling system
GB384877A (en) Method of and apparatus for disposing of fly ash of furnaces
CN102418920B (en) Circulating fluidized bed power generating boiler capable of blended combustion of industrial waste residues
SU89894A1 (en) The method of operation of the individual dust preparation system for furnaces of steam boilers and industrial furnaces
CN210638067U (en) Stable combustion energy-saving efficiency-improving system for boiler of thermal power plant
US2343895A (en) Vapor generator
CN203586193U (en) Middle storing bin type hot wind powder feeding and manufacturing system
SU1755005A1 (en) Method of crushed-coal grate firing
CN212869743U (en) Double-fuel boiler capable of burning pure gas
US2856872A (en) Pulverized coal firing system
JP2017058077A (en) Boiler plant
CN204943457U (en) Bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus
SU86806A2 (en) Drying and mill system with the discharge of the drying agent into the furnace
CN208349287U (en) A kind of coal chemical industry solid waste utilization of resources system
CN105091012B (en) A kind of vent pulverized coal handling system for lignite germanium-extracting technology
CN210772191U (en) Chicken manure boiler capable of fully combusting
US2029296A (en) Multiple underfeed stoker
CN205137466U (en) Rubbish and coal mixing burning boiler
US2090328A (en) Furnace
GB1094441A (en) Apparatus for the combustion of solid fuel
GB479962A (en) Method and means for the combustion of waste furnace gases