CN204943457U - Bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus - Google Patents

Bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus Download PDF

Info

Publication number
CN204943457U
CN204943457U CN201520626160.7U CN201520626160U CN204943457U CN 204943457 U CN204943457 U CN 204943457U CN 201520626160 U CN201520626160 U CN 201520626160U CN 204943457 U CN204943457 U CN 204943457U
Authority
CN
China
Prior art keywords
flue gas
dust removal
removal apparatus
bagasse
dry dust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520626160.7U
Other languages
Chinese (zh)
Inventor
杨生超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520626160.7U priority Critical patent/CN204943457U/en
Application granted granted Critical
Publication of CN204943457U publication Critical patent/CN204943457U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of with living beings bagasse the bagasse boiler circulating combustion being fuel and dry dust removal apparatus of discharging fume.It is characterized in that: bagasse boiler combustible soot separator, cigarette ash Flue Gas Forced Draft Fan and corresponding pipeline valve composition circulating combustion device, coarse grain combustible soot in high-temperature flue gas is provided after making bagasse boiler superheater to separate, and be transmitted back to the device of lower furnace circulating combustion, have the effect of the flue gas reuse high temperature secondary wind apparatus reducing heat loss due to exhaust gas concurrently; Discharge flue gas had smoke evacuation dry dust removal apparatus before water film dedusting.The utility model combustible soot and appropriate high-temperature flue gas reuse, make the rapid ignition of bagasse fuel entering lower furnace portion, improves efficiency of combustion, and contained by discharge flue gas, cigarette ash greatly reduces, and reduces air pollution, and the safe and efficient environment-protecting clean of bagasse boiler is run.

Description

Bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus
Technical field
It is boiler dedicated that the utility model relates to a kind of cane sugar factory, especially a kind of with living beings bagasse the bagasse boiler circulating combustion being fuel and dry dust removal apparatus of discharging fume.
Background technology
The steam boiler that bagasse boiler is is fuel with living beings bagasse, bagasse is lightweight height moisture content fuel, and bagasse moisture content is about 50%.After bagasse fuel enters burner hearth, baking caloric receptivity is large, bagasse ignition postpones, a large amount of Zhe Zha No has the burner hearth that just flies out that burns completely, the cigarette ash phosphorus content that flue gas carries is very high, about 2% low ash content bagasse fuel, but huge soot amount is discharged, increase the weight of environmental pollution, simultaneously because a large amount of smoke deposition is on back-end surfaces, heat transfer efficiency is low, a large amount of cigarette ashes that the air preheater of some sugar refinery bagasse boilers deposits burn suddenly, raging flames burns out air preheater, cause serious boiler breakdowns, blowing out is rushed to repair, even be forced to cut off that air preheater poor efficiency is super raftings row, heavy loss is brought to environmental protection and production.
Utility model content
Technical problem to be solved in the utility model, to be to provide after making bagasse boiler superheater coarse grain combustible soot in high-temperature flue gas to separate, and be transmitted back to the device of lower furnace portion circulating combustion, have the effect of the flue gas reuse high temperature secondary wind apparatus reducing heat loss due to exhaust gas concurrently; Discharge flue gas had dry dust removal apparatus before water film dedusting.Through the repacking to traditional bagasse boiler, the safe and efficient environment-protecting clean of bagasse boiler is run.
The utility model invents at bagasse boiler first generation circulating combustion device, second generation high temperature secondary wind Strongization burner, energy-saving and emission-reduction Fa Ming, after being successfully applied to production run, on the basis be familiar with further by production practices inspection, the mat woven of fine bamboo strips three generations circulating combustion sent out in conjunction with environmental emission reduction Subcommittee-to and smoke and dust eliminating technology.
The utility model solves the problems of the technologies described above with following technical scheme:
A kind of bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus, comprise secondary air channel, spout and corresponding pipeline valve, it is characterized in that: bagasse boiler combustible soot separator, cigarette ash Flue Gas Forced Draft Fan and corresponding pipeline valve composition circulating combustion device, the air intake feed pipe of cigarette ash Flue Gas Forced Draft Fan is connected with combustible soot separator bottom delivery pipe, the efferent duct UNICOM of secondary air channel and cigarette ash Flue Gas Forced Draft Fan, the air intake feed pipe of cigarette ash Flue Gas Forced Draft Fan there are flue gas arm and air arm, smoke evacuation dry dust removal apparatus was housed before water dust scrubber, air-introduced machine motor is equipped with speed regulator.
Described circulating combustion device and smoke evacuation dry dust removal apparatus are at least respectively installed a set of.
Coke button scavenge unit is arranged at described combustible soot separator bottom delivery pipe bottom.
Described air arm communicates with boiler primary air piping or the outer air of stove.
Described 1 bar flue gas arm and boiler air preheater top or other position exhaust gases passes UNICOM at the most.
Described flue gas arm and air arm are provided with adjustable gate.
The motor of described cigarette ash Flue Gas Forced Draft Fan, is equipped with speed regulator or adjustable varying-speed motor.
After the utility model bagasse boiler superheater in high-temperature flue gas coarse grain combustible soot through combustible soot separator separated and collected, coke button scavenge unit is arranged at combustible soot separator bottom delivery pipe bottom, combustible soot and appropriate high-temperature flue gas, conveying is aspirated by cigarette ash Flue Gas Forced Draft Fan, lower furnace is sprayed into through boiler secondary airduct and spout, the combustible soot parched ignition immediately, simultaneously with the high-temperature flue gas acting in conjunction of reuse, makes the rapid ignition of bagasse fuel entering lower furnace portion.
Described cigarette ash Flue Gas Forced Draft Fan air intake feed pipe there is flue gas arm,-ribbon valve flue gas arm and boiler air preheater top or other position exhaust gases passes UNICOM at the most, air arm communicates with primary air piping or the outer air of stove, control valve on arm, regulate the exhaust gas volumn of reuse and air capacity, secondary air channel UNICOM before and after air-out discharge nozzle and burner hearth.
Described bagasse boiler combustible soot separator, the circulating combustion device of cigarette ash Flue Gas Forced Draft Fan and corresponding pipeline valve composition has at least a set of.
Discharge flue gas is before entering original water dust scrubber, and install smoke evacuation dry dust removal apparatus, described smoke evacuation dry dust removal apparatus has at least a set of.The dry cigarette ash that smoke evacuation dry dust removal apparatus is collected is rich potassium Plant ash fertilizer, turns waste into wealth, mixes and stirs fermenting and producing fertilizer Ge composite fertilizer, simplify fertilizer Ge compound fertilizer production technology with filter mud of sugar refinery, significantly reduces fertilizer Ge composite heat transfer cost.Discharge flue gas after dry dust removal apparatus removes most cigarette ash, then enters water dust scrubber smoke abatement and dust control, makes the flue gas entering sky adapt to stricter environmental protection smoke evacuation new standard.
Through the repacking to traditional bagasse boiler, combustible soot and appropriate high-temperature flue gas reuse, make the rapid ignition of bagasse fuel entering lower furnace portion, improve efficiency of combustion, contained by discharge flue gas, cigarette ash greatly reduces, and reduces air pollution, and the safe and efficient environment-protecting clean of bagasse boiler is run.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the example structure schematic diagram of single drum-type boiler.
In figure: 1. burner hearth, 2. superheater, 3. drum, 4. convection bank, 5. economizer, 6. air preheater, 7. smoke evacuation dry dust removal apparatus, 8. water dust scrubber, 9. chimney, 10. speed regulator, 11. air-introduced machines, 12. flue gas arms, 13. air arms, 14. cigarette ash Flue Gas Forced Draft Fans, 15. combustible soot separators, 16. secondary air channels, 17. fire grates, 18. fuel bagasses enter boiler tube.
Detailed description of the invention
As shown in Figure 1, the utility model changes Installed to traditional bagasse boiler, is to reequip on the basis of the original configuration of boiler, add follow ring combustion burn Installed put and dry dust removal apparatus of discharging fume at least each a set of, overheavy firing and smoke abatement and dust control, accomplish safety, efficient, environment-protecting clean operation.
The utility model by burner hearth 1, superheater 2, drum 3, convection bank 4, economizer 5, air preheater 6, water dust scrubber 8, the compositions such as chimney 9 and bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus.
Bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus, comprise combustible soot separator, cigarette ash Flue Gas Forced Draft Fan and corresponding pipeline valve, the circulating combustion device of secondary air channel and spout composition, the air intake feed pipe of cigarette ash Flue Gas Forced Draft Fan 14 is connected with combustible soot separator 15 bottom drain, the efferent duct UNICOM of secondary air channel 16 and cigarette ash Flue Gas Forced Draft Fan 14, the air intake feed pipe of cigarette ash Flue Gas Forced Draft Fan 14 there are flue gas arm 12 and air arm 13, discharge flue gas was equipped with smoke evacuation dry dust removal apparatus 7 before water dust scrubber 8, the motor of air-introduced machine 11 is equipped with speed regulator 10.
The motor of cigarette ash Flue Gas Forced Draft Fan 14, is equipped with speed regulator or adjustable varying-speed motor.
Coke button scavenge unit is arranged at combustible soot separator 15 bottom drain bottom.
Flue gas arm 12 and air arm 13 are provided with adjustable gate.
Air arm 13 communicates with boiler primary air piping or the outer air of stove.
1 bar flue gas arm 12 and boiler air preheater 6 top or other position exhaust gases passes UNICOM at the most.
Bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus are at least respectively installed a set of.
When bagasse boiler runs, the bagasse that boiler tube 18 enters burner hearth 1 bottom is entered from fuel bagasse, under the high temperature secondary wind and combustible soot injection immixture of its lower secondary air channel 16 spout ejection, send forth at the rapid ignition of burner hearth 1 lower space, the fuel bagasse be scattered on a small quantity on fire grate 17 burns away under the effect of furnace bottom First air.The flue gas after the cigarette ash of burner hearth 1, superheater 2 that flies out isolates combustible soot through combustible soot separator 15, delivery pipe bottom combustible soot separator 15, cigarette ash Flue Gas Forced Draft Fan 14 is together entered with appropriate high-temperature flue gas, by regulating the rotating speed of cigarette ash Flue Gas Forced Draft Fan 14, the valve opening of flue gas arm 12 and air arm 13 is regulated to reach optimum cycle combustion conditions.Isolate the high-temperature flue gas after combustible soot and wash away convection bank 4, economizer 5 and air preheater 6, owing to not having smoke deposition Re Jiao Change efficiency to improve, and stopped on air preheater because of deposition a large amount of cigarette ashes burn suddenly, burn out the generation of the serious boiler breakdowns of air preheater.Thus make boiler safety, Effec-tive Function.
From air preheater 6 flue gas out and the trickle cigarette ash carried with flue gas, through smoke evacuation dry dust removal apparatus 7, most cigarette ash separated and collected is discharged, flue gas after dry dust removal enters water dust scrubber 8, flue gas up to standard again after udst separation, is transported to chimney 9 by air-introduced machine 11 suction and enters sky.Air-introduced machine 11, under speed regulator 10 regulable control, makes boiler operatiopn operating mode remain on optimal operational condition.
The utility model also has a kind of embodiment of single drum-type boiler, as shown in Figure 2, its structure is substantially identical with the structure of Fig. 1 embodiment, by the exhaust gases passes of combustible soot separator 15 and the rear corresponding exhaust gases passes UNICOM of boiler superheater 2 when being the different , An Installed of layout of superheater 2.

Claims (6)

1. a bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus, comprise secondary air channel, spout and corresponding pipeline valve, it is characterized in that: bagasse boiler combustible soot separator (15), cigarette ash Flue Gas Forced Draft Fan (14) and corresponding pipeline valve composition circulating combustion device, the air intake feed pipe of cigarette ash Flue Gas Forced Draft Fan (14) is connected with combustible soot separator (15) bottom drain, the efferent duct UNICOM of secondary air channel (16) and cigarette ash Flue Gas Forced Draft Fan (14), the air intake feed pipe of cigarette ash Flue Gas Forced Draft Fan (14) there are flue gas arm (12) and air arm (13), before water dust scrubber (8), smoke evacuation dry dust removal apparatus (7) is housed, air-introduced machine (11) motor is equipped with speed regulator (10).
2. bagasse boiler circulating combustion according to claim 1 and smoke evacuation dry dust removal apparatus, is characterized in that: described circulating combustion device and smoke evacuation dry dust removal apparatus (7) are at least respectively installed a set of.
3. bagasse boiler circulating combustion according to claim 1 and smoke evacuation dry dust removal apparatus, is characterized in that: coke button scavenge unit is arranged at described combustible soot separator (15) bottom drain bottom.
4. bagasse boiler circulating combustion according to claim 1 and smoke evacuation dry dust removal apparatus, is characterized in that: described air arm (13) communicates with boiler primary air piping or the outer air of stove.
5. bagasse boiler circulating combustion according to claim 1 and smoke evacuation dry dust removal apparatus, is characterized in that: described 1 bar flue gas arm (12) and boiler air preheater (6) top or other position exhaust gases passes UNICOM at the most.
6. bagasse boiler circulating combustion according to claim 1 and smoke evacuation dry dust removal apparatus, is characterized in that: described flue gas arm (12) and air arm (13) are provided with adjustable gate.
CN201520626160.7U 2015-08-19 2015-08-19 Bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus Expired - Fee Related CN204943457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520626160.7U CN204943457U (en) 2015-08-19 2015-08-19 Bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520626160.7U CN204943457U (en) 2015-08-19 2015-08-19 Bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus

Publications (1)

Publication Number Publication Date
CN204943457U true CN204943457U (en) 2016-01-06

Family

ID=55010882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520626160.7U Expired - Fee Related CN204943457U (en) 2015-08-19 2015-08-19 Bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus

Country Status (1)

Country Link
CN (1) CN204943457U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114593407A (en) * 2022-03-07 2022-06-07 中工国际工程股份有限公司 Bagasse boiler and bagasse boiler system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114593407A (en) * 2022-03-07 2022-06-07 中工国际工程股份有限公司 Bagasse boiler and bagasse boiler system

Similar Documents

Publication Publication Date Title
CN102537975B (en) Circulating fluidized bed garbage incineration boiler and pollution control system with same
CN201885203U (en) Horizontal type internal combustion three-return shell boiler capable of burning biomass, fuel oil or gas
CN104930537B (en) A kind of flue gas recirculation burner
CN201688552U (en) Assembled water tube boiler by burning biomass
CN102192590A (en) Biomass whirlwind hot blast stove
CN106224981A (en) A kind of to relate to the cigarette garbage boiler thermodynamic system as fuel and method thereof
CN104633666B (en) Smoke recycling rubbish incineration boiler
CN102242935A (en) Novel garbage and biomass fuel combustion furnace and combustion method
CN102345862A (en) Biomass particle combustion apparatus and combustion method for the same
CN101818891B (en) Industrial boiler for burning bio-briquettes
CN101354129A (en) Biomass and fire coal composite fuel boiler
CN202973142U (en) Intermediate silo-type hot-air powder feeding burning tertiary-air-free system
CN203718787U (en) Fume recycling waste incineration boiler
CN203757694U (en) Energy reservation, emission reduction and efficient combustion biomass boiler
CN102927582A (en) Bin storage type hot air powder-feeding tertiary-air-free combustion system
CN204943457U (en) Bagasse boiler circulating combustion and smoke evacuation dry dust removal apparatus
CN103206703B (en) Biomass smoke boiler
CN202074686U (en) Biomass cyclone hot air furnace
CN105698182A (en) Combustion system for treating garbage
CN206073089U (en) It is a kind of to relate to boiler thermodynamic system of the cigarette garbage as fuel
CN105698184A (en) Combustion system capable of inhibiting generation of unburned objects during garbage combustion process
CN105698183A (en) Combustion furnace for treating garbage
CN102818247B (en) Efficient steam boiler for gasification and combined combustion of pulverized coal
CN107664301A (en) A kind of preparation method of efficient biomass boiler
CN204534544U (en) Biomass boiler denitration burner and double burner biomass boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106

Termination date: 20190819

CF01 Termination of patent right due to non-payment of annual fee