SU825982A1 - Method of increasing stability of permanent mine working - Google Patents

Method of increasing stability of permanent mine working Download PDF

Info

Publication number
SU825982A1
SU825982A1 SU792816441A SU2816441A SU825982A1 SU 825982 A1 SU825982 A1 SU 825982A1 SU 792816441 A SU792816441 A SU 792816441A SU 2816441 A SU2816441 A SU 2816441A SU 825982 A1 SU825982 A1 SU 825982A1
Authority
SU
USSR - Soviet Union
Prior art keywords
wells
increasing stability
mine working
workings
chambers
Prior art date
Application number
SU792816441A
Other languages
Russian (ru)
Inventor
Юрий Михайлович Басинский
Михаил Павлович Морозов
Виктор Михайлович Кулешов
Виктор Станиславович Пиховкин
Original Assignee
Vnii Gornoj Geomekhaniki Marks
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vnii Gornoj Geomekhaniki Marks filed Critical Vnii Gornoj Geomekhaniki Marks
Priority to SU792816441A priority Critical patent/SU825982A1/en
Application granted granted Critical
Publication of SU825982A1 publication Critical patent/SU825982A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Description

(54) СПОСОБ ПОВЫШЕНИЯ УСТОЙЧИВОСТИ.КАПИТАЛЬНЫХ ГОРНЫХ ВЫРАБОТОК(54) METHOD FOR INCREASING STABILITY. CAPITAL MINING PROCESSES

Изобретение относитс  к горной промышленности и может быть использовано при сооружении камер дл  ле- . бедок верхних приемных площадок уклонов , сопр жений горных выработок различного назначени  и горных выработок больших диаметров, сооружаемых в услови х больших глубин с длительным сроком эксплуатации. Известен способ повышени  устойчивости горных выработок путем их предварительной надоаботки 1. Однако указанный способ во многих случа х не может быть использован на стадии строительства горных предпри  Известен также способ повышени  устойчивости капитальных горных выработок , включающий проведение по пласту угл  вспомогательных выработок и бурение из вспомогательных выработок в плоскости пласта параллельных между собой разгрузочных скважин в границах планируемой площади разгрузки 2. Однако при данном способе разгрузочные скважины бур т одинакового диа метра, что приводит к сравнительно быстрому восстановлению естественного напр жени  состо ни  массива пород, расположенных над выработкой и поэтому ее срок безремонтной эксплуатации недостаточно велик. Цель изобретени  - увеличение срока безремэнтной эксплуатации капитальной горной выработки. Поставленна  цель достигаетс  тем, что разгрузочные скважины бур т до границ планируемой площади разгрузки из двух взаимно перпендикул рных вспомогательных выработок, пройденных по линии границы планируемой площади разгрузки, при этом вначале бур т скважины малого диаметра, а затем их разбуривают через одну скважинами большого диаметра. На фиг. 1 показана схема расположени  проводимой горной выработки, дополнительных горных выработок и сеть разгруженных скважин разного диаметра; на фиг. 2 - схема расположени  разгрузочных скважин, образующих разгру-зочную щель до начала Опускани  массива; на фиг. 3 - то же, после полного закрыти  скважин малого диаметра. Способ осуществл етс  следующим образом (например, дл  камер лебедок верхних приемных площадок) , . Поспе проведени  уклонов 1 по пласту угл  проходку останавливают и деЛлют разгрузку массива пород вмещающих камеры верхних.приемных площадок. Перпендикул рно уклонам провод т по простиранию пласта дополнительную выработку 2 на длину, обеспечивающую необходилие размеры зоны разгрузки камер. Затем от одного из концов выработки провод т вторунз дополнительную выработку3 на длину, обеспечивающую нeoбxoди ый размер зоны разгрузки Яо. падению. После этого из дополнительной выработки 2 бур т скважины 4 малого диаметра, которые впоследствии через одну разбуривают с сважинами В большого диаметра. Затем из дополнительной выработки 3 бур т скважины 6 малого диаметра, которые впоследствии также через одну разбуривают скважинами 7 большего диаметра . Образовавша с  сеть скважин различного диаметра составл ет разгрузочную зону над камерами лебедок приемных площадок В, котора  определ етс  в каждом конкретном случае в соответствии с горногеологической и горнотехнической обстановкой. После этого продолжают проведение камер лебедо. верхних приемных площадо в разгруженной зоне.The invention relates to the mining industry and can be used in the construction of chambers for le. the lows of the upper receiving sites of slopes, the interfaces of mine workings for various purposes and mine workings of large diameters, constructed under conditions of great depths with a long service life. There is a method of increasing the stability of mine workings through their preliminary work 1. However, this method in many cases cannot be used at the construction stage of a mining enterprise. A method of increasing the stability of capital mine workings is also known, including conducting auxiliary workings along the seam and drilling from auxiliary workings in the plane of the reservoir parallel to each other relief wells within the planned area of discharge 2. However, with this method, discharge wells The wells are of the same diameter, which leads to a relatively quick recovery of the natural stress of the state of the rock mass located above the mine and therefore its maintenance-free operation is not long enough. The purpose of the invention is to increase the life of the non-maintenance operation of the capital mine workings. This goal is achieved by unloading wells that drill to the boundaries of the planned discharge area from two mutually perpendicular auxiliary workings, passed along the boundary of the planned discharge area, while first drilling the small diameter wells, and then drilling them through one large diameter wells. FIG. Figure 1 shows the layout of the ongoing mine work, additional mine workings and a network of unloaded wells of different diameters; in fig. 2 shows the layout of the discharge wells forming a discharge gap prior to the commencement of array descent; in fig. 3 - the same, after the complete closure of small-diameter wells. The method is carried out as follows (for example, for winches chambers of the upper receiving platforms),. After carrying out the slopes 1 along the coal seam, the penetration is stopped and the unloading of the rock mass enclosing the upper receiving areas chambers is stopped. Perpendicular to the slopes, additional generation 2 is made along the strike of the formation for a length of 2, ensuring the necessary dimensions of the unloading zone of the chambers. Then, from one of the ends of the excavation, additional portions 3 of the length are made for a length, which ensures the unused size of the Yao discharge zone. fall. After this, from an additional production, 2 boreholes of 4 small diameters, which are subsequently drilled through with one of the large diameters of B into one. Then, from the additional production of 3 drilled wells 6 of small diameter, which are subsequently also drilled through wells of 7 larger diameter through one. The resulting network of wells of different diameters constitutes the discharge zone above the winches chambers of the receiving areas B, which is determined in each particular case in accordance with the geological and mining engineering conditions. After this, the chambers are continued to be held. upper receiving areas in the unloaded zone.

Поочередное бурение скважин малого диаметра и последующее их разбуривание через одну скважинами боль luoro диаметра позвол ет создать над Alternate drilling of small diameter wells and their subsequent drilling through one well, the pain of diameter luoro allows you to create

камерами разгрузочную щель сложной конфигурации (фиг. 2), котора  позвол ет в процессе эксплуатации выработок выделить, два характерных пери-ода разгрузки.the chambers have an unloading slit of complex configuration (Fig. 2), which allows to distinguish two characteristic periods of unloading during the operation of the workings.

В первый период над выработкой образуетс  сплошна  разгрузочна  щель, соответствующа  по габаритам размеру малого диаметра скважин. Под действием горного давлени  эта щелЬ постепенно закрываетс  на участках малого диаметра скважин и остаетс  открытой на участках большого диаметра (фиг.З после чего наступает второй периодIn the first period, a continuous discharge gap is formed above the production, corresponding in size to the size of a small diameter well. Under the action of rock pressure, this gap gradually closes in areas of small diameter wells and remains open in areas of large diameter (Fig. 3, after which a second period begins

разгрузки, котда под действием горного давлени  уголь на участках малого диаметра скважин постепенно раздавливаетс  и перемещаетс  в сторону полостей, оставшихс  от скважин большого диаметра.unloading, under the influence of rock pressure, coal in areas of small diameter wells is gradually crushed and moves towards the cavities left by the large diameter wells.

При такой форме щели, период разгрузки существенно увеличиваетс  во времени, что позвол ет эксплуатировать камеры в разгруженной зоне на прот жении более длительного срока. Таким образом, увеличиваетс  период безремонтной эксплуатации капитальных горных выработок.With this slot shape, the unloading period increases significantly over time, which allows cameras to operate in the unloaded zone for a longer period. Thus, the period of maintenance-free operation of capital mines is prolonged.

Claims (2)

1.Указани  по рациональному расположению , охране и поддержанию горных выработок на угольных шахтгис СССР. BHHIW, 1977, с. 74.1.Posits on rational location, protection and maintenance of mine workings at the coal mines of the USSR. BHHIW, 1977, p. 74. 2.Авторское свидетельство СССР 386141, кл. Е 21 D 9/00, 1970.2. Authors certificate of the USSR 386141, cl. E 21 D 9/00, 1970. JIf SBJIf SB
SU792816441A 1979-08-17 1979-08-17 Method of increasing stability of permanent mine working SU825982A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792816441A SU825982A1 (en) 1979-08-17 1979-08-17 Method of increasing stability of permanent mine working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792816441A SU825982A1 (en) 1979-08-17 1979-08-17 Method of increasing stability of permanent mine working

Publications (1)

Publication Number Publication Date
SU825982A1 true SU825982A1 (en) 1981-04-30

Family

ID=20849256

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792816441A SU825982A1 (en) 1979-08-17 1979-08-17 Method of increasing stability of permanent mine working

Country Status (1)

Country Link
SU (1) SU825982A1 (en)

Similar Documents

Publication Publication Date Title
CN111058847B (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
US4458947A (en) Mining method
SU825982A1 (en) Method of increasing stability of permanent mine working
SU1263868A1 (en) Method of controlling the strained state of rock about mine working
SU1645553A1 (en) Method of mining outburst-prone coal seams
RU2179243C1 (en) Method of driving of mine workings in mining of thin deposits of hard ores by shearer under conditions of high rock pressure
CN109630118A (en) Mining method for steeply inclined unstable thin ore body
SU1643726A1 (en) Method for tunneling mine workings under high rock pressure
SU1116177A1 (en) Method of driving a mine working in rock body with gas-dynamic hazard
RU2058484C1 (en) Process of performance of preparatory headings over shock-and outburst- risky seams
SU581282A1 (en) Method of mining thick ore bodies
SU989073A1 (en) Method of driving ascending workings
SU825962A1 (en) Method of controlling hard-to-cave roofs
SU1395833A1 (en) Method of preventing the building of mine working soil
RU2379623C1 (en) Method for production of cutting cavity
SU987111A1 (en) Method of driving mine working along outburst-hazardous bed
SU960450A1 (en) Method of preventing sudden outbursts of coal, rock or gas in preparotary workings
RU2068958C1 (en) Method of formation of cutting hollow at sinking of mining workings
SU1599542A1 (en) Method of working blocks
RU1770571C (en) Method for making raise mine working
RU2029083C1 (en) Method for rock mass breaking
SU829929A1 (en) Method of breaking-off a rock block
SU998760A1 (en) Method of working mineral deposits
RU1809111C (en) Method for making mining workings rock burst non-hazardous
SU754067A1 (en) Method of mining thick ore bodies