SU823590A1 - Method of apparatus for erecting the lining of underground structure - Google Patents
Method of apparatus for erecting the lining of underground structure Download PDFInfo
- Publication number
- SU823590A1 SU823590A1 SU772526376A SU2526376A SU823590A1 SU 823590 A1 SU823590 A1 SU 823590A1 SU 772526376 A SU772526376 A SU 772526376A SU 2526376 A SU2526376 A SU 2526376A SU 823590 A1 SU823590 A1 SU 823590A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- lining
- rocks
- wells
- erecting
- drainage wells
- Prior art date
Links
Landscapes
- Processing Of Solid Wastes (AREA)
Description
(54)СПОСОБ ВОЗВЕДЕНИ СООРУЖЕНИЯ И УС I : . Изобретение ОТНОСИТСЯ к строительству подземных сооружений, а именно к способам возведени в них обделки. Известен способ возведени обделки подземного сооружени , включающий возведение посредством опалубки бетонной несущей оболочки, бурение скважин, установку инъекторов и тампонирование горных пород через них СЗ Однако при осуществлении такого способа не обеспечиваетс разгрузка обделки от давлени подземных вод при строительстве подземных сооружений : в водоносных породах. Известен также способ возведени обделки подземного сооружени ,включающий бетонирование несущего сло , замораживание пород разделительной зоны, тампонирование пород в пределах противофильтрационного экрана и бу-. рение дренажных скважин в разделительной зоне 2 . Однако при осуществлении такого способа быстрому и качественному выОСУЩЕС ОБДЕЖИ ПОДЗЕМНОГО ОЙСТВО ДЛЯ ЕГО ЛЕНИЯ полнению работ по возведению обделки в водоносных породах преп тствует движение подземных вод. Устройство дл осуществлени таких способов включает обсадные трубы дл установки в дренажные скважины Сз. Цель изобретени - повьппение эффективности работ и ускорение процесса возведени обделки в водоносных породах . Поставленна цель достигаетс тем, что до начала бетонировани несущего сло обделки бур т дополнительные дренажные скважины с заглублением за пределы йротиво4«льтрационного экрана на рассто ние равное двум его толщинам , и устанавливают в них обсадные трубы дл изол ции всех слоев обделки, а после окончани тампо.нировами пород скважины ликвидируют, причем в устройстве дл осуществлени предлагаемого способа обсадные трубы выполнены из термоизол ционного материала и(54) METHOD OF CONSTRUCTING A CONSTRUCTION AND CS I:. The invention relates to the construction of underground structures, and in particular to methods of erection in them of lining. There is a known method of erecting an underground structure, including erecting a concrete bearing shell, drilling wells, installing injectors and plugging rocks through them. NW. However, this method does not relieve the pressure of groundwater during the construction of underground structures in aquifers. There is also known a method of erecting a lining of an underground structure, which includes concreting the base layer, freezing the rocks of the separation zone, plugging the rocks within the impervious screen and bu-. Rhenium drainage wells in the separation zone 2. However, when such a method is implemented, the fast and high-quality EXTINCTIONS OF THE UNDERGROUND GROUND VESSELS FOR ITS TREATMENT The completion of the work on the construction of the lining in aquifers prevents the movement of groundwater. A device for carrying out such methods includes casing for installation in C3 drainage wells. The purpose of the invention is to increase the efficiency of work and accelerate the process of erection of lining in aquifers. The goal is achieved by the fact that, prior to the start of concreting the carrier lining layer, additional drainage wells are drilled with a depth beyond the frontal screen for a distance equal to two of its thicknesses, and casing is installed in them to isolate all layers of the lining, and The well rocks are eliminated, and in the device for carrying out the proposed method, the casing is made of a thermally insulating material and
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU772526376A SU823590A1 (en) | 1977-09-26 | 1977-09-26 | Method of apparatus for erecting the lining of underground structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU772526376A SU823590A1 (en) | 1977-09-26 | 1977-09-26 | Method of apparatus for erecting the lining of underground structure |
Publications (1)
Publication Number | Publication Date |
---|---|
SU823590A1 true SU823590A1 (en) | 1981-04-23 |
Family
ID=20725694
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU772526376A SU823590A1 (en) | 1977-09-26 | 1977-09-26 | Method of apparatus for erecting the lining of underground structure |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU823590A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1697616A2 (en) * | 2003-10-28 | 2006-09-06 | Daniel Warren | Method for preparing in-ground tunnel structures |
CN103388489A (en) * | 2013-08-05 | 2013-11-13 | 中国水电顾问集团贵阳勘测设计研究院 | Strong karst tunnel permanent draining structure and construction method thereof |
-
1977
- 1977-09-26 SU SU772526376A patent/SU823590A1/en active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1697616A2 (en) * | 2003-10-28 | 2006-09-06 | Daniel Warren | Method for preparing in-ground tunnel structures |
EP1697616A4 (en) * | 2003-10-28 | 2007-08-01 | Daniel Warren | Method for preparing in-ground tunnel structures |
CN103388489A (en) * | 2013-08-05 | 2013-11-13 | 中国水电顾问集团贵阳勘测设计研究院 | Strong karst tunnel permanent draining structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4463988A (en) | Horizontal heated plane process | |
US3688507A (en) | Grouting | |
CN105240024B (en) | A kind of method of parallel shield method enlarging construction subway station | |
JP4132442B2 (en) | Tunnel construction method | |
SU823590A1 (en) | Method of apparatus for erecting the lining of underground structure | |
SU1135851A1 (en) | Method of constructing drainage system | |
SU629347A1 (en) | Mine working roof support | |
RU2095574C1 (en) | Method for construction of mine shafts in watered unstable rocks | |
SU1469136A1 (en) | Method of isolating the mounting platform in coal seam mining from the surface | |
RU2122634C1 (en) | Method of mining thick steeply dipping coal seam by horizontal layers | |
SU1070312A1 (en) | Method of constructing a plugging pad | |
SU969900A1 (en) | Method of erecting prestressed tunnel lining | |
SU1739008A1 (en) | Method for construction of rising water-drainage well | |
SU1184943A1 (en) | Method of mining ore deposits | |
SU985304A1 (en) | Method of erecting a roof support in mine working | |
SU417570A1 (en) | ||
RU2684629C1 (en) | Method of grouting rocks during the construction of vertical shafts | |
SU1308763A1 (en) | Method of constructing solid concrete lining in drilled shafts and wells | |
SU1751334A1 (en) | Method of isolating assembly site in mining coal seam from day surface | |
RU2059817C1 (en) | Method for mining thick steeply dipping coal seams with filling of worked-out space | |
SU715798A1 (en) | Method of mining gently sloping ore bodies | |
IE57077B1 (en) | A method of and apparatus for grouting | |
SU589399A1 (en) | Method of working thick steep coal-bearing seams | |
RU2055209C1 (en) | Method for creating underground drifts such as tunnels | |
SU1406388A1 (en) | Method of constructing a mine working |