CN103388489A - Strong karst tunnel permanent draining structure and construction method thereof - Google Patents

Strong karst tunnel permanent draining structure and construction method thereof Download PDF

Info

Publication number
CN103388489A
CN103388489A CN2013103371085A CN201310337108A CN103388489A CN 103388489 A CN103388489 A CN 103388489A CN 2013103371085 A CN2013103371085 A CN 2013103371085A CN 201310337108 A CN201310337108 A CN 201310337108A CN 103388489 A CN103388489 A CN 103388489A
Authority
CN
China
Prior art keywords
pvc pipe
tunnel
vault
flap valve
drain hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103371085A
Other languages
Chinese (zh)
Inventor
葛小博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Guiyang Engineering Corp
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN2013103371085A priority Critical patent/CN103388489A/en
Publication of CN103388489A publication Critical patent/CN103388489A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a strong karst tunnel permanent draining structure and a construction method thereof. The structure comprises a draining hole, a PVC (polyvinyl chloride) pipe and a check valve; the draining hole is positioned in the bedrock concentrated effluent position of an arc top poured at the periphery of the tunnel; the PVC pipe is mounted at the tail end of the draining hole and is communicated with the tunnel; the check valve is mounted on the PVC pipe and is fixed at the structure reinforcing steel ribs of the arc top; and the PVC pipe and the check valve are poured in the concrete of the arc top. The strong karst tunnel permanent draining structure and the construction method thereof have the beneficial effects of meeting the pouring quality demands of the concrete, solving the problem that the surrounding rock stability is endangered by external permeation of internal water in the tunnel in the later-period operation stage, preventing crack water from influencing the strength of the common concrete, and avoiding the damage to the whole stability of the rock body as during water passing in the later period, the internal water in the tunnel possibly enters into to the bedrock by the draining hole, thus increasing the technology reliability and safety of engineering and achieving the aims of saving work period and safe construction.

Description

The permanent discharge structure of a kind of strong karst tunnel and job practices thereof
Technical field
The present invention relates to the permanent discharge structure of a kind of strong karst tunnel and job practices thereof, belong to tunnel diversion technical field.
Background technology
At present, the method of concentrating the place of water outlet generally to adopt at strong karst area tunnel is that crag is beaten drain hole, draw and connect with the normal discharge pipe during concreting, percolating water destroys the former water/binder ratio of concrete, intensity to lining concrete exerts an influence, when the later stage, tunnel was crossed water, in tunnel, water may enter basement rock inside by drain hole, destroyed the resistance to overturning of rock mass.If drain hole is carried out shutoff, just can cause rock mass internal water pressure to increase because discharging, unfavorable to the country rock monolithic stability.
Flap valve is applied very extensive aspect plumbing, be to prevent that the medium in pipeline from flowing backwards, but at strong karst area tunnel, concentrate the water outlet position without utilization.
Summary of the invention
The object of the present invention is to provide the permanent discharge structure of a kind of strong karst tunnel and job practices thereof, can overcome the deficiencies in the prior art, can meet simultaneously the concrete pouring quality requirement, in also can solving in operation phase in later stage hole, water exosmoses and endangers the adjoining rock stability problem, reaches the purpose of saving duration, safe construction.
The objective of the invention is to be achieved through the following technical solutions: the permanent discharge structure of a kind of strong karst tunnel and job practices thereof, it comprises drain hole, pvc pipe and flap valve, wherein, drain hole is positioned at the basement rock of vault and concentrates the water outlet position, vault is cast in the periphery in tunnel, pvc pipe is arranged on the end of drain hole and with tunnel, is communicated with, and flap valve is arranged on pvc pipe and is fixed on the structure reinforcing bars of vault, and pvc pipe and flap valve are cast in the concrete of vault.
The inboard of described vault is provided with abutment wall in lining cutting, and arranged outside has the outer abutment wall of lining cutting, and the outer abutment wall of lining cutting is outside equipped with country rock.
The described drain hole 5-15 ° that tilts earthward.
Described flap valve is positioned at the scope that is exported to lining cutting abutment wall sideline of pvc pipe.
The job practices of the permanent discharge structure of a kind of strong karst tunnel and job practices thereof, it comprises following steps:
(1), at the basement rock of vault, concentrate the water outlet position to bore drain hole, the drain hole 5-15 ° that tilts earthward;
(2), pvc pipe is installed in the aperture of drain hole, and the scope that is exported to lining cutting abutment wall sideline that is positioned at pvc pipe on pvc pipe is installed flap valve;
(3), the structure reinforcing bars of flap valve and vault is fixed;
(4), pvc pipe and flap valve are cast in the concrete of vault;
(5), opening flap valve carries out the draining debugging of the concentrated water outlet position of basement rock, the normal draining at the concentrated water outlet position of assurance runtime basement rock.
Beneficial effect of the present invention is: both met the concrete pouring quality requirement, in having solved again in operation phase in later stage hole, water exosmoses and endangers the adjoining rock stability problem, avoided ordinary concrete because crevice water affects concrete strength, when tunnel is crossed water to the later stage, and avoided water in tunnel may enter by drain hole the problem of the resistance to overturning of basement rock internal sabotage rock mass, increased simultaneously engineering reliability and the safety of engineering, reached save the duration, the purpose of safe construction.
Description of drawings
Fig. 1 is structural representation of the present invention.
Wherein, the 1-vault, the 2-drain hole, the 3-PVC pipe, the 4-flap valve, the 5-structure reinforcing bars, the 6-tunnel, abutment wall in the 7-lining cutting, the outer abutment wall of 8-lining cutting, the 9-country rock, the 10-basement rock is concentrated the water outlet position.
The specific embodiment
Further describe technical scheme of the present invention below in conjunction with accompanying drawing, but that claimed scope is not limited to is described.
As Fig. 1, the permanent discharge structure of a kind of strong karst tunnel and job practices thereof, it comprises drain hole 2, pvc pipe 3 and flap valve 4, wherein, drain hole 2 is positioned at the basement rock of vault 1 and concentrates water outlet position 10, and vault 1 is cast in the periphery in tunnel 6, and pvc pipe 3 is arranged on the end of drain hole 2 and with tunnel 6, is communicated with, flap valve 4 is arranged on pvc pipe 2 and is fixed on the structure reinforcing bars 5 of vault 1, and pvc pipe 3 and flap valve 4 are cast in the concrete of vault 1.
The inboard of described vault 1 is provided with abutment wall 7 in lining cutting, and arranged outside has the outer abutment wall 8 of lining cutting, and the outer abutment wall 8 of lining cutting is outside equipped with country rock 9.
Described drain hole 2 5-15 ° that tilts earthward.
Described flap valve 4 is positioned at the scope that is exported to lining cutting abutment wall 7 sidelines of pvc pipe 2.
The job practices of the permanent discharge structure of a kind of strong karst tunnel and job practices thereof, it comprises following steps:
(1), at the basement rock of vault 1, concentrate water outlet position 10 to bore drain holes 2, drain hole 2 5-15 ° that tilts earthward;
(2), pvc pipe 2 is installed in the aperture of drain hole 2, and the scope that is exported to lining cutting abutment wall 7 sidelines that is positioned at pvc pipe 2 on pvc pipe 2 is installed flap valve 4;
(3), flap valve 4 is fixing with the structure reinforcing bars 5 of vault 1;
(4), pvc pipe 2 and flap valve 4 are cast in the concrete of vault 1;
(5), open flap valve 4 and carry out basement rock concentrated water outlet position 10 drainings debugging, the normal draining at the concentrated water outlet position 10 of assurance runtime basement rock.
Prior art adopts carries out shutoff to drain hole, can cause like this rock mass internal water pressure to increase because discharging, unfavorable to the country rock monolithic stability.Can eliminate by the flap valve draining the disadvantageous aspect of adjoining rock stability that the normal discharge pore area comes, avoided ordinary concrete because crevice water affects concrete strength, when tunnel is crossed water to the later stage simultaneously, avoided water in tunnel may enter by drain hole the problem of the resistance to overturning of basement rock internal sabotage rock mass, replace prior art drain hole has been carried out shutoff, increased engineering reliability and the safety of engineering.

Claims (5)

1. one kind strong permanent discharge structure of karst tunnel, it is characterized in that: it comprises drain hole (2), pvc pipe (3) and flap valve (4), wherein, drain hole (2) is positioned at the basement rock of vault (1) and concentrates water outlet position (10), vault (1) is cast in the periphery of tunnel (6), pvc pipe (3) is arranged on the end of drain hole (2) and with tunnel (6), is communicated with, flap valve (4) is arranged on pvc pipe (2) and goes up and be fixed on the structure reinforcing bars (5) of vault (1), and pvc pipe (3) and flap valve (4) are cast in the concrete of vault (1).
2. the permanent discharge structure of strong karst tunnel according to claim 1 is characterized in that: the inboard of described vault (1) is provided with abutment wall (7) in lining cutting, and arranged outside has the outer abutment wall (8) of lining cutting, and the outer abutment wall (8) of lining cutting is outside equipped with country rock (9).
3. the permanent discharge structure of strong karst tunnel according to claim 1 is characterized in that: described drain hole (2) 5-15 ° that tilts earthward.
4. the permanent discharge structure of strong karst tunnel according to claim 1, it is characterized in that: described flap valve (4) is positioned at the scope that is exported to lining cutting abutment wall (7) sideline of pvc pipe (2).
5. the job practices of the permanent discharge structure of strong karst tunnel, it is characterized in that: it comprises following steps:
(1), at the basement rock of vault (1), concentrate water outlet position (10) to bore drain hole (2), drain hole (2) 5-15 ° that tilts earthward;
(2), pvc pipe (2) is installed in the aperture of drain hole (2), and be positioned at the scope installation flap valve (4) that is exported to lining cutting abutment wall (7) sideline of pvc pipe (2) on pvc pipe (2);
(3), flap valve (4) is fixing with the structure reinforcing bars (5) of vault (1);
(4), pvc pipe (2) and flap valve (4) are cast in the concrete of vault (1);
(5), opening flap valve (4) carries out the draining debugging of the concentrated water outlet position (10) of basement rock, the normal draining at the concentrated water outlet position (10) of assurance runtime basement rock.
CN2013103371085A 2013-08-05 2013-08-05 Strong karst tunnel permanent draining structure and construction method thereof Pending CN103388489A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103371085A CN103388489A (en) 2013-08-05 2013-08-05 Strong karst tunnel permanent draining structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103371085A CN103388489A (en) 2013-08-05 2013-08-05 Strong karst tunnel permanent draining structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN103388489A true CN103388489A (en) 2013-11-13

Family

ID=49532898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103371085A Pending CN103388489A (en) 2013-08-05 2013-08-05 Strong karst tunnel permanent draining structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN103388489A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372736A (en) * 2014-10-30 2015-02-25 成都聚智工业设计有限公司 Drainage structure
CN104912574A (en) * 2015-06-29 2015-09-16 中南大学 A tunnel lining leakage water treatment method
CN107218057A (en) * 2017-06-15 2017-09-29 中铁二院工程集团有限责任公司 A kind of draining portal structure suitable for water rich strata

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU823590A1 (en) * 1977-09-26 1981-04-23 Среднеазиатское Отделение Всесоюз-Ного Ордена Ленина Проектно-Изыска-Тельского И Научно-Исследовательскогоинститута "Гидропроект" Method of apparatus for erecting the lining of underground structure
SU1090893A1 (en) * 1981-12-18 1984-05-07 Новосибирский филиал Всесоюзного научно-исследовательского института транспортного строительства Drainage arrangement
CN2076993U (en) * 1990-11-01 1991-05-15 长沙中南水利水电技术开发部 Hydraulic structure one-way draw off valve
US20050095066A1 (en) * 2003-10-28 2005-05-05 Daniel Warren Method for repairing in-ground tunnel structures
JP2005155169A (en) * 2003-11-26 2005-06-16 Nishimatsu Constr Co Ltd Pipe material for secondary lining of shield tunnel and secondary lining method of shield tunnel using the pipe material
CN202544925U (en) * 2012-04-13 2012-11-21 中国水电顾问集团华东勘测设计研究院 One-hole dual-purpose tunnel drain hole structure
CN202559321U (en) * 2012-05-16 2012-11-28 中国葛洲坝集团股份有限公司 Diversion tunnel plug concrete drainage pipe device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU823590A1 (en) * 1977-09-26 1981-04-23 Среднеазиатское Отделение Всесоюз-Ного Ордена Ленина Проектно-Изыска-Тельского И Научно-Исследовательскогоинститута "Гидропроект" Method of apparatus for erecting the lining of underground structure
SU1090893A1 (en) * 1981-12-18 1984-05-07 Новосибирский филиал Всесоюзного научно-исследовательского института транспортного строительства Drainage arrangement
CN2076993U (en) * 1990-11-01 1991-05-15 长沙中南水利水电技术开发部 Hydraulic structure one-way draw off valve
US20050095066A1 (en) * 2003-10-28 2005-05-05 Daniel Warren Method for repairing in-ground tunnel structures
JP2005155169A (en) * 2003-11-26 2005-06-16 Nishimatsu Constr Co Ltd Pipe material for secondary lining of shield tunnel and secondary lining method of shield tunnel using the pipe material
CN202544925U (en) * 2012-04-13 2012-11-21 中国水电顾问集团华东勘测设计研究院 One-hole dual-purpose tunnel drain hole structure
CN202559321U (en) * 2012-05-16 2012-11-28 中国葛洲坝集团股份有限公司 Diversion tunnel plug concrete drainage pipe device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372736A (en) * 2014-10-30 2015-02-25 成都聚智工业设计有限公司 Drainage structure
CN104912574A (en) * 2015-06-29 2015-09-16 中南大学 A tunnel lining leakage water treatment method
CN104912574B (en) * 2015-06-29 2017-12-05 中南大学 A kind of tunnel-liner percolating water Treatment Methods
CN107218057A (en) * 2017-06-15 2017-09-29 中铁二院工程集团有限责任公司 A kind of draining portal structure suitable for water rich strata
CN107218057B (en) * 2017-06-15 2024-01-05 中铁二院工程集团有限责任公司 Drainage portal structure suitable for water-rich stratum

Similar Documents

Publication Publication Date Title
CN202970602U (en) Plugging structure of high-rise building deep foundation pit large water volume tube well
CN207727600U (en) Plugging dewatering well device
CN202560319U (en) Tunnel drainage and pressure reduction structure
CN204662431U (en) A kind of filling pile ' s after grouting control valve with backstop structure
CN103388489A (en) Strong karst tunnel permanent draining structure and construction method thereof
CN203701436U (en) Lap joint structure of vertical reinforcements and steel sleeve of assembled wall
CN104613238A (en) Method for preventing water leakage after hole is formed in basement exterior wall process pipe
CN207469277U (en) The quick slip casting plugging device of diaphram wall leakage point in a kind of foundation pit
CN205259201U (en) Device is arranged in accuse of tunnel groundwater
CN204491645U (en) A kind of deep foundation pit precipitation well-sealing device
CN203440820U (en) Improved pouring pile end post-grouting device
CN110374680B (en) Construction process of retaining wall of surrounding rock crushing water burst roadway
CN104964121B (en) A kind of sleeve water leakage plugging method
CN109183851B (en) Underwater installation method of shell type immersed tube
CN103590430B (en) The in line device that oozes of a kind of Tailings Dam high-efficient vertical
CN106320687A (en) Detachable wall connecting component for scaffold
CN103774619A (en) Quick processing device for large-flow water leakage hole in concrete body
CN205152918U (en) Structure that diversion tunnel and flood discharge hole combine
CN204941579U (en) The pre-buried orifice tube of a kind of pit shaft borehole wall grouting
CN205089333U (en) Pressure tunnel atress structure
CN204356915U (en) The self waterproof structure that steel pipe column is crossing with concrete of basement exterior wall
CN204475319U (en) There is pressure underground water bored pile in a kind of hole wall crack
CN203716477U (en) Connecting tube for building exterior wall scaffold
CN202545384U (en) Siphon outlet device
CN206721845U (en) A kind of diversion tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131113