CN104613238A - Method for preventing water leakage after hole is formed in basement exterior wall process pipe - Google Patents

Method for preventing water leakage after hole is formed in basement exterior wall process pipe Download PDF

Info

Publication number
CN104613238A
CN104613238A CN201410719681.7A CN201410719681A CN104613238A CN 104613238 A CN104613238 A CN 104613238A CN 201410719681 A CN201410719681 A CN 201410719681A CN 104613238 A CN104613238 A CN 104613238A
Authority
CN
China
Prior art keywords
process pipe
basement
hole
perforate
flange plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410719681.7A
Other languages
Chinese (zh)
Inventor
张嘉乐
张艳生
赵烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN PORT INTERNATIONAL LOGISTICS DEVELOPMENT Co Ltd
Original Assignee
TIANJIN PORT INTERNATIONAL LOGISTICS DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN PORT INTERNATIONAL LOGISTICS DEVELOPMENT Co Ltd filed Critical TIANJIN PORT INTERNATIONAL LOGISTICS DEVELOPMENT Co Ltd
Priority to CN201410719681.7A priority Critical patent/CN104613238A/en
Publication of CN104613238A publication Critical patent/CN104613238A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions
    • F16L5/02Sealing
    • F16L5/022Sealing by welding

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention provides a method for preventing water leakage after a hole is formed in a basement exterior wall process pipe. The method comprises the steps that the process pipe preformed hole is formed in a basement reinforced concrete wall, and the position of the process pipe preformed hole must be higher than the basement ground and lower than the basement top surface by 15-20 cm; the opening diameter of the process pipe preformed hole is lower than or equal to 50 cm; when the diameter of the process pipe is larger than 50 cm, a rib plate used for strengthening the stiffness is additionally arranged in the position where the process pipe builds up welding with a flange plate; waterproof plugging after the hole is formed is achieved due to the fact that waterproofing work is conducted on a water attaining surface of the basement reinforced concrete wall. By means of the method, the waterproof performance is high, and it is guaranteed that no water leakage in 20 years or a longer time is achieved only through one-time construction. The method for preventing water leakage after the hole is formed in the basement exterior wall process pipe has the advantages that through the waterproof solution, the construction is simple and convenient, the construction period is short, the manufacturing cost is low, and meanwhile the basement hole water leakage problem which always troubles the building field during the construction period and after the project closeout is solved.

Description

The method of leaking after preventing the perforate of outer wall of basement process pipe
Technical field
The present invention relates to a kind of prevent the perforate of outer wall of basement process pipe after the method for leaking.
Background technique
In newly-built or transformation project, a lot of construction project can relate to process pipe will pass external wall, enters construction wall inside, prevents underground water from being infiltrated in building basement by pipeline like this, is the emphasis that this intermediate item needs to consider.Traditional anti-leaking method is substantially; between process pipe and construction wall, adopt various stabilizer and anti-strike-through to carry out practical operation; after implementing according to traditional anti-leaking method; due to the mechanical periodicity of underground water; the material water loggings such as antiseepage stabilizer and anti-strike-through and the reason such as aging; usual meeting was in 1 year or will again leak in two years, used to the building later stage and brought very large economic waste and immeasurable loss.
Summary of the invention
For deficiency structural in prior art, the object of this invention is to provide a kind of prevent the perforate of outer wall of basement process pipe after the method for leaking, to change method comparatively traditional at present, the expenditure of lower cost, the use of longer time.
For achieving the above object, the technical solution used in the present invention be to provide a kind of prevent the perforate of outer wall of basement process pipe after the method for leaking, the method comprises the following steps:
1) on basement reinforced concrete wall, offer process pipe preformed hole, the position of process pipe preformed hole must be descended room floor above Ground, lower than basement end face 15-20 centimetre, be beneficial to the construction of perforate and waterproof shutoff and the laying of process pipe;
2) described process pipe preformed hole is circular port, Kai Kong Zhi Jing≤50 centimetre;
3) when the diameter of process pipe is greater than 50 centimetres, need to set up in the position of process pipe and flange plate built-up welding the floor strengthening rigidity;
4) the waterproof shutoff after perforate, do water-proofing treating at basement reinforced concrete wall upstream face:
1. in step 1) exterior wall concrete metope after perforate beats multiple pre-embedded bolt hole;
2. the flange plate of rigidity material and heap postwelding is selected, flange plate and process pipe are piled postwelding to be buckled on process pipe preformed hole, waterproof apron to be padded between basement reinforced concrete wall upstream face after flange plate and perforate, and it is fastening that pre-embedded bolt is screwed into pre-embedded bolt hole through flange plate, to guarantee seal, keep away water experiment without the need to carrying out.
Effect of the present invention adopts the method water-proof performance high, and only once construction just can ensure 20 years or water-tight in the longer time.The construction of this waterproof solution is simple and convenient, and the construction time is short.The most important thing is that this waterproof solution cost is cheaper, can economize on the use of funds for user.Common process pipe is passing through basement wall construction, a fixing requirement is not also had at present to be with rigidity waterproof or flexible water, all design according to local level of ground water and extreme weather conditions, also various method of construction is there is in construction, the waterproof construction of a general process pipe repeatedly will be filled water-proofing material and just can be ensured no longer to leak, for the pipeline waterproof of 300 mm dias, the construction of its routine needs the filling water-proofing material of at least three times, and the engineering time will at about 1 month, total cost is not less than 10,000 yuan, but adopt the present invention relates to a kind of prevent the perforate of outer wall of basement process pipe after the method for leaking and construction process, only need once construct, construction period is the longest is one week, guarantee 20 years water-tight, construction cost is general not higher than 0.2 ten thousand yuan.The disposable pipeline done is more, and overall cost of constructing can have superiority more.Hole, the hole of this basement perforate waterproof and original process pipe are controlled Lou, the solution optimum scheme of leak stopping, be through experimental summary for many years, solve simultaneously basement perforate leak also be perplex always building field construction period and project be completed after more scabrous engineering roadblock.
Accompanying drawing explanation
Fig. 1 is the structural representation of outer wall of basement process pipe perforate rear defence leak-stopping water of the present invention;
Fig. 2 is the flange plate schematic diagram in the present invention's structure of preventing from leaking.
In figure:
1, flange plate 2, process pipe preformed hole 3, flange plate bolt hole 4, process pipe and flange plate full weld 5, pre-embedded bolt 6, basement reinforced concrete wall 7, waterproof apron 8, process pipe
Embodiment
By reference to the accompanying drawings to of the present invention prevent the perforate of outer wall of basement process pipe after the method for leaking be illustrated.
As shown in Figure 1, 2, according to the needs of process pipe transformation, in original outer wall of basement perforate, there is provided the path of turnover basement to newly-increased process pipe, the thing followed is the waterproof problem of basement, for solving waterproof problem after this type of basement perforate, of the present invention prevent the perforate of outer wall of basement process pipe after the method for leaking, the method comprises the following steps:
1) go into operation skill pipeline preformed hole 2 on basement reinforced concrete wall, must descend room floor above Ground, be advisable lower than basement end face 15-20 centimetre in its position, to facilitate perforate and waterproof plugging construction, considers the laying of process pipe 8 simultaneously.
2) selection of outer wall of basement hole shape, according to process pipe 8 require perforate, be generally circle, perforate size do not affect outer wall of basement structure use be advisable, be advisable in Zhi Jing≤50 centimetre of process pipe preformed hole 2.
3) when the diameter of process pipe 8 is greater than 50 centimetres, need to increase in the position of process pipe and flange plate 1 built-up welding floor and strengthen the process that rigidity makes.
4) the waterproof shutoff after perforate, do water-proofing treating at basement reinforced concrete wall upstream face:
1. in step 1) exterior wall concrete metope after perforate beats multiple pre-embedded bolt hole;
2. the flange plate 1 of rigidity material is selected, flange plate 1 and process pipe 8 heap postwelding are buckled on process pipe preformed hole 2, waterproof apron 7 to be padded between basement reinforced concrete wall upstream face after flange plate 1 and perforate, and it is fastening that pre-embedded bolt 5 is screwed into pre-embedded bolt hole through flange plate preformed hole 3, to guarantee seal, keep away water experiment without the need to carrying out.
Of the present invention prevent the perforate of outer wall of basement process pipe after the method for leaking is disposable solve perforate after leak water problem.

Claims (1)

1. a method of leaking after preventing the perforate of outer wall of basement process pipe, the method comprises the following steps:
1) on basement reinforced concrete wall, process pipe preformed hole (2) is offered, the position of process pipe preformed hole (2) must be descended room floor above Ground, lower than basement end face 15-20 centimetre, be beneficial to the construction of perforate and waterproof shutoff and the laying of process pipe (8);
2) described process pipe preformed hole (2) is circular port, Kai Kong Zhi Jing≤50 centimetre;
3) when the diameter of process pipe (8) is greater than 50 centimetres, need to set up in the position of process pipe and flange plate (1) built-up welding the floor strengthening rigidity;
4) the waterproof shutoff after perforate, do water-proofing treating at basement reinforced concrete wall upstream face:
1. in step 1) exterior wall concrete metope after perforate beats multiple pre-embedded bolt hole;
2. the flange plate (1) of rigidity material is selected, flange plate (1) and process pipe (8) are piled postwelding to be buckled on process pipe preformed hole (2), upper waterproof apron (7) to be padded between basement reinforced concrete wall upstream face after flange plate (1) and perforate, and it is fastening to guarantee seal that pre-embedded bolt (5) is screwed into pre-embedded bolt hole through flange plate (1), keep away water experiment without the need to carrying out.
CN201410719681.7A 2014-12-02 2014-12-02 Method for preventing water leakage after hole is formed in basement exterior wall process pipe Pending CN104613238A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410719681.7A CN104613238A (en) 2014-12-02 2014-12-02 Method for preventing water leakage after hole is formed in basement exterior wall process pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410719681.7A CN104613238A (en) 2014-12-02 2014-12-02 Method for preventing water leakage after hole is formed in basement exterior wall process pipe

Publications (1)

Publication Number Publication Date
CN104613238A true CN104613238A (en) 2015-05-13

Family

ID=53147824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410719681.7A Pending CN104613238A (en) 2014-12-02 2014-12-02 Method for preventing water leakage after hole is formed in basement exterior wall process pipe

Country Status (1)

Country Link
CN (1) CN104613238A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812324A (en) * 2015-11-30 2017-06-09 中国冶集团有限公司 A kind of method that outer wall of basement increases wall bushing
CN106931240A (en) * 2015-12-29 2017-07-07 中国二十冶集团有限公司 Perforate method for waterproofing after waterproof construction
CN109680897A (en) * 2018-12-28 2019-04-26 广东景龙装配科技有限公司 Environmentally friendly composite brick and preparation method thereof, construction method
CN109853904A (en) * 2018-12-28 2019-06-07 广东景龙装配科技有限公司 A kind of construction method of aerial platform
CN109853903A (en) * 2018-12-28 2019-06-07 广东景龙装配科技有限公司 Aerial platform and its building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA959882A (en) * 1971-05-24 1974-12-24 Interpace Corporation Pipe to manhole seal
DE2909125A1 (en) * 1979-03-08 1980-09-18 Cillichemie Watertight connection for pipeline through bathing pool wall - has stuffing of polyurethane gel clamped between foam rings
EP0259765B1 (en) * 1986-09-11 1990-11-22 Dyckerhoff & Widmann Aktiengesellschaft Prefabricated part made of concrete or concrete steel
JP2008248601A (en) * 2007-03-30 2008-10-16 Kubota Ci Kk Sewer conduit
CN201599493U (en) * 2010-03-03 2010-10-06 浙江海洋学院 Underground wall bushing
CN202360906U (en) * 2011-11-26 2012-08-01 青岛四方庞巴迪铁路运输设备有限公司 Pipe sealing device of railway vehicle

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA959882A (en) * 1971-05-24 1974-12-24 Interpace Corporation Pipe to manhole seal
DE2909125A1 (en) * 1979-03-08 1980-09-18 Cillichemie Watertight connection for pipeline through bathing pool wall - has stuffing of polyurethane gel clamped between foam rings
EP0259765B1 (en) * 1986-09-11 1990-11-22 Dyckerhoff & Widmann Aktiengesellschaft Prefabricated part made of concrete or concrete steel
JP2008248601A (en) * 2007-03-30 2008-10-16 Kubota Ci Kk Sewer conduit
CN201599493U (en) * 2010-03-03 2010-10-06 浙江海洋学院 Underground wall bushing
CN202360906U (en) * 2011-11-26 2012-08-01 青岛四方庞巴迪铁路运输设备有限公司 Pipe sealing device of railway vehicle

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812324A (en) * 2015-11-30 2017-06-09 中国冶集团有限公司 A kind of method that outer wall of basement increases wall bushing
CN106931240A (en) * 2015-12-29 2017-07-07 中国二十冶集团有限公司 Perforate method for waterproofing after waterproof construction
CN109680897A (en) * 2018-12-28 2019-04-26 广东景龙装配科技有限公司 Environmentally friendly composite brick and preparation method thereof, construction method
CN109853904A (en) * 2018-12-28 2019-06-07 广东景龙装配科技有限公司 A kind of construction method of aerial platform
CN109853903A (en) * 2018-12-28 2019-06-07 广东景龙装配科技有限公司 Aerial platform and its building

Similar Documents

Publication Publication Date Title
CN104613238A (en) Method for preventing water leakage after hole is formed in basement exterior wall process pipe
CN105697034A (en) Grouting system and grouting method used for composite lining structure backfill and grouting
CN205314107U (en) Sectional type slip casting pipe device that foundation stabilization used
CN207553275U (en) A kind of siphon drainage device
CN104404960B (en) A kind of underground diaphragm wall seam grouting device and constructional method
CN106988296A (en) A kind of method of vacuum drainage bracing means and application device progress reinforced soft soil ground
CN205477669U (en) A slip casting system that is used for combined type lining cutting structure to backfill slip casting behind one's back
CN204212180U (en) A kind of reinforcing cage for basement plugging dewatering well
CN103806412A (en) Water leakage repair structure for water pool expansion joint
CN206769023U (en) A kind of outer wall of basement waterproof construction
CN202000365U (en) Seepage-proof structure for underground continuous wall
CN205895309U (en) Prevention of seepage water system for pitshaft driving
CN204510223U (en) The two-way Grouting Pipe of vacuum-pumping
CN203603159U (en) Underground water recyclable comprehensive utilization system
CN207376843U (en) Expansion joint leakage-proof structure
CN203130097U (en) Small guide pipe for grouting
CN207176766U (en) Plane grout cover water burst mouth flow control device
CN205688547U (en) Inspection shaft
CN206338181U (en) A kind of water pump priming device
CN206570827U (en) A kind of uninterrupted diversion cofferdam system
CN105133621A (en) Construction method of foundation pit bracing system and foundation pit bracing system
CN204418598U (en) A kind of closed toilet warterproof structure
CN205350575U (en) Wall coil is crossed to floor
CN206052693U (en) Slurry casting machine
CN205999884U (en) A kind of gas-liquid two-phase ascending pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150513

WD01 Invention patent application deemed withdrawn after publication