SU1135851A1 - Method of constructing drainage system - Google Patents
Method of constructing drainage system Download PDFInfo
- Publication number
- SU1135851A1 SU1135851A1 SU833613171A SU3613171A SU1135851A1 SU 1135851 A1 SU1135851 A1 SU 1135851A1 SU 833613171 A SU833613171 A SU 833613171A SU 3613171 A SU3613171 A SU 3613171A SU 1135851 A1 SU1135851 A1 SU 1135851A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- drainage
- lining
- drains
- substance
- rock
- Prior art date
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
1. СПОСОБ ДРЕНАЖА, включающий образование щелевых контактных дрен, бетонирование обделки и бурение шпуровых скважин, отличающийс тем, что, с целью улучшени качества дренажа, в местах кон- тактных дрен поверхность породы покрывают слоем удал емого вещества, которое извлекают после бетонировани обделки. 2. Способ по п. 1, отличающийс тем, что в качестве удал емого вещества используют размываемое водой вещество, например глину. (О1. A DRAINAGE METHOD, which includes the formation of slotted contact drains, concreting the lining and drilling blast holes, characterized in that, in order to improve the quality of drainage, in places of contact drains, the surface of the rock is covered with a layer of removed material that is removed after the concrete is lined. 2. A method according to claim 1, characterized in that a water eroded substance, such as clay, is used as the substance to be removed. (ABOUT
Description
у/ /// /// лл /// / /// /u / /// /// nl /// / /// /
Ф г F g
/ /
САЭSAE
Л / /7ГL / 7G
слcl
ооoo
0101
Фиг.) Изобретение относитс к строительству подземных сооружений любого назначени , расположенных в обводненных массивах скальных водостойких пород и преимущественно может быть использовано в безнапорных туннел х. Известно дренажное устройство обделки туннел , включающее щпуровые скважины , пробуренные через обделку в породе 1. Недостатком этого дренажа вл етс , то, что отдельные щпуровые дрены диаметром 40-50 мм могут не пересечь трещины в массиве породы и не будут дренировать, а следовательно снижать давление подземных вод. Наиболее близким по технической сущности и достигаемому результату к изобретению вл етс способ дренажа, включающий образование щелевых контактных дрен, бетонирование обделки и бурение щпуровых скважин 2. Недостатком известного способа вл етс недостаточное качество дренажа. Цель изобретени - улучщение качества дренажа. Указанна цель достигаетс тем, что согласно способу дренажа, включающему образование щелевых контактных дрен, бетонирование обделки и бурение шпуровых скважин , в местах контактных дрен поверхность породы покрывают слоем удал емого вещества , которое извлекают после бетонировани обделки. В качестве удал емого вещества используют размываемое водой вещество, например глину. На фиг. 1 показана обделка туннел с предлагаемым дренажом, поперечный разрез; на фиг. 2 - узел I на фиг. 1. Дренажное устройство дл осуществлени способа включает открытые щпуровые скважины 1 и щелевые контактные дрены 2, расположенные на участках трещиноватой породы 3 между породой и обделкой 4. Щелевые дрены соединены с одной или двум открытыми щпуровыми дренами 1. Размеры элементов дренажного устройства назначают в каждом конкретном случае на основании фильтрационных расчетов или модельных исследований. Способ осуществл етс следующим образом . Перед бетонированием обделки в местах контактных дрен поверхность породы покрывают слоем размываемого водой состава, например глины, тоЛщиной 5-10 мм. Затем бетонируют обделку 4 и после ее распалубливани бур т через обделку 4 шпуровые дрены 1, по две штуки на каждую щелевую дрену. Шпуры желательно располагать на максимальном удалении друг от друга. Затем через отверсти в обделке вымывают слой глины, образу щелевые дрены 2. При фильтрации подземной воды к туннелю вода по трещинам, пересеченным шпурами , поступает через последние в ту ннель. Друга часть воды, не перехваченна щпурами , поступает в щелевые дрены и также выводитс внутрь туннел , еще более снижа давление подземных вод на обделку. Таким образом, предлагаемый способ дренажа по сравнению с известным отличаетс простотой и высокой эксплуатационной наFig.) The invention relates to the construction of underground structures for any purpose, located in flooded rock masses of water-resistant rocks and can advantageously be used in free-flow tunnels. A tunnel drainage drainage device is known, which includes shchurovye wells drilled through the lining in rock 1. The disadvantage of this drainage is that individual shcherovny drains with a diameter of 40-50 mm may not cross the cracks in the rock mass and will not drain, and therefore reduce pressure groundwater. The closest in technical essence and the achieved result to the invention is a drainage method, which includes the formation of slotted contact drains, concreting of the lining and drilling of shtra-2 wells. The disadvantage of this method is the insufficient quality of drainage. The purpose of the invention is to improve the quality of drainage. This goal is achieved by the fact that according to the drainage method, which includes the formation of slotted contact drains, concreting of the lining and drilling of pre-bore holes, in the places of the contact drains the surface of the rock is covered with a layer of removed substance, which is removed after the concrete is lined. A water eroded substance, for example, clay, is used as the substance to be removed. FIG. 1 shows the lining of the tunnel with the proposed drainage, cross section; in fig. 2 — node I in FIG. 1. A drainage device for carrying out the method includes open shchurovye wells 1 and slotted contact drains 2 located in areas of fractured rock 3 between the rock and lining 4. The slotted drains are connected to one or two open drift drains 1. The dimensions of the drainage device elements are assigned in each specific case on the basis of filtration calculations or model studies. The method is carried out as follows. Before concreting the lining in the places of contact drains, the surface of the rock is covered with a layer of water eroded, for example, clay, with a thickness of 5-10 mm. Then the lining 4 is concreted, and after it is dismantled, 4 drilled holes 1 are drilled through the lining, two for each slit drain. Boreholes should preferably be located at a maximum distance from each other. Then, through a hole in the lining, a layer of clay is washed out, forming slotted drains 2. When the groundwater is filtered to the tunnel, water flows through cracks crossed by boreholes into the tunnel. Another part of the water that is not intercepted by the splines enters the slotted drains and is also withdrawn into the tunnel, further reducing the pressure of groundwater on the lining. Thus, the proposed method of drainage in comparison with the known is characterized by simplicity and high operational
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833613171A SU1135851A1 (en) | 1983-07-01 | 1983-07-01 | Method of constructing drainage system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833613171A SU1135851A1 (en) | 1983-07-01 | 1983-07-01 | Method of constructing drainage system |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1135851A1 true SU1135851A1 (en) | 1985-01-23 |
Family
ID=21071255
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833613171A SU1135851A1 (en) | 1983-07-01 | 1983-07-01 | Method of constructing drainage system |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1135851A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101922302A (en) * | 2010-08-30 | 2010-12-22 | 中铁第四勘察设计院集团有限公司 | Fault processing method of high pressure water enrichment area |
CN103526769A (en) * | 2013-10-24 | 2014-01-22 | 中国水电顾问集团成都勘测设计研究院有限公司 | Shoulder-accumulation-slope intelligent drainage system and drainage method |
CN109707443A (en) * | 2018-05-07 | 2019-05-03 | 范雲鹤 | A kind of renewable type tunnel drainage system and method |
-
1983
- 1983-07-01 SU SU833613171A patent/SU1135851A1/en active
Non-Patent Citations (1)
Title |
---|
1. Указани по проектированию дренажа подземных гидротехнических сооружений. вен 045-72. Минэнерго СССР. М., 1973, с. 23, рис. 2, верхн часть. 2. Там же, нижн часть (прототип). * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101922302A (en) * | 2010-08-30 | 2010-12-22 | 中铁第四勘察设计院集团有限公司 | Fault processing method of high pressure water enrichment area |
CN103526769A (en) * | 2013-10-24 | 2014-01-22 | 中国水电顾问集团成都勘测设计研究院有限公司 | Shoulder-accumulation-slope intelligent drainage system and drainage method |
CN103526769B (en) * | 2013-10-24 | 2015-11-04 | 中国电建集团成都勘测设计研究院有限公司 | Replat accumulation body slope intelligent drainage system and water discharge method |
CN109707443A (en) * | 2018-05-07 | 2019-05-03 | 范雲鹤 | A kind of renewable type tunnel drainage system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1135851A1 (en) | Method of constructing drainage system | |
RU2249699C2 (en) | Method for driving draining mines in broken and watered massif | |
SU1507962A1 (en) | Method of hydraulic fracturing of formation | |
SU1726766A1 (en) | Method of erecting waterproofing dike in mine drifts | |
RU2095574C1 (en) | Method for construction of mine shafts in watered unstable rocks | |
Tan et al. | Foundation problems in limestone areas A case study in Kuala Lumpur, Malaysia | |
SU629347A1 (en) | Mine working roof support | |
SU1021703A1 (en) | Method of producing underground structure lining | |
SU1710699A1 (en) | Drill hole plugging-back method | |
SU1684418A1 (en) | Method for spanning hydraulic tunnel | |
SU1078108A1 (en) | Method of constructing hydro-insulating partition in salt rock | |
RU2011830C1 (en) | Method for shaft sinking | |
SU985304A1 (en) | Method of erecting a roof support in mine working | |
SU1133345A1 (en) | Method of constructing the underwater part of structure in water-saturated soils | |
SU1567761A1 (en) | Method of terminating borehole exposing unsteady productive strata | |
SU1043294A1 (en) | Method of constructing filter-less wells | |
SU1035231A1 (en) | Method of constructing an underground structure | |
SU979576A1 (en) | Drain work for underground structure | |
SU1444469A1 (en) | Method of driving portal-adjoining tunnel portion | |
SU1758232A1 (en) | Method of consolidating rocks in vertical shaft sinking | |
SU1081354A1 (en) | Method of constructing flexible roof support | |
SU1652440A1 (en) | Method for protection of buildings and structures from shear deformation of ground | |
SU1197535A1 (en) | Method of erecting antiseepage screen | |
SU1289962A1 (en) | Method of producing drainage system | |
RU1802135C (en) | Method for erection of antifiltering curtain behind contour of mine shaft in porous rocks |