SU787598A1 - Modular form - Google Patents
Modular form Download PDFInfo
- Publication number
- SU787598A1 SU787598A1 SU792725944A SU2725944A SU787598A1 SU 787598 A1 SU787598 A1 SU 787598A1 SU 792725944 A SU792725944 A SU 792725944A SU 2725944 A SU2725944 A SU 2725944A SU 787598 A1 SU787598 A1 SU 787598A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- shields
- formwork
- shaped
- face
- jacks
- Prior art date
Links
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Description
(54) БЛОЧНАЯ ОПАЛУБКА(54) BLOCK FORMWORK
1one
Изобретение относитс к строительству и предназначено дл возведени монолитных железобетонных стен жилых, гражданских и промышленных сборно-монолитных многоэтажных зданий с наружными стенами из навесных изделий или кирпича с перекрыти ми из сборных железобетонных плит.The invention relates to the construction and is intended for the construction of monolithic reinforced concrete walls of residential, civil and industrial precast-monolithic multi-storey buildings with external walls made of hanging products or bricks with prefabricated reinforced concrete slabs.
Известна блочна опалубка, состо ща из Г-образных опалубочных щитов, шарнирной вставки и распалубочного механизма дл одновременной распалубки всех элементов относительно плиты перекрыти посредством соединени коротких сторон опалубочных щитов с щарнирной вставкой, а длинных их сторон с приспособлением в виде талрепа I.Known block formwork consisting of L-shaped formwork panels, a hinged insert and a stripping mechanism for simultaneous stripping of all elements relative to the slab by connecting the short sides of the formwork panels to the hinge insert, and their long sides with lanyard I.
Недостатком опалубки вл етс то, что горизонт уровн верхних торцов щитов зависит от точности установки перекрытий и качества поверхности панелей перекрыти , по которым перемещаютс опорные ролики щитов; их перемещение на перекрытии, выполненном набором пустотных плит, невозможно . Дл отведени углов Г-образных щитов от стены на необходимое рассто ние, обеспечивающее съем опалубки, требуетс The disadvantage of the formwork is that the level horizon of the upper ends of the boards depends on the accuracy of the installation of the floors and the quality of the surface of the floor panels along which the support rollers of the boards move; their movement on the floor, made a set of hollow slabs, is impossible. To move the corners of the L-shaped boards from the wall to the required distance to remove the formwork,
больщой длины рабочий ход толрепа, открывающего длинные стороны Г-образных щитов .large length working stroke tolrepa, opening the long side of the L-shaped shields.
При установке специальной траверсой опалубки на пост очистки требуютс специально подготовленные площадки с поверхностью заданной точности во избежание повреждени (перекоса, деформации) щарнирных соединений опалубки, что также усложн ет ее эксплуатацию.When installing a special cross-beam formwork for a cleaning post, specially prepared platforms with a surface of a given accuracy are required in order to avoid damage (misalignment, deformation) of the hinged joints of the formwork, which also complicates its operation.
Цель изобретени - уменьщение эксплу10 атационных трудозатрат.The purpose of the invention is to reduce the operational effort.
Поставленна цель Достигаетс тем, что блочна опалубка, включающа Г-образные опалубочные щиты, шарнирную вставку и распалубочный механизм, снабжена рамой с телескопическими упорами, винтовыми домкратами , щарнирно-винтовым механизмом и торцовыми щитами, причем регулировочные устройства контактируют с Г-образными щитами, которые установлены на раме и щарнирно св заны с торцовыми щитами.Goal Achieved Achieved by the fact that block formwork, including L-shaped formwork shields, a hinged insert and a stripping mechanism, is equipped with a frame with telescopic stops, screw jacks, a hinged-screw mechanism and end shields, and the adjusting devices are in contact with the L-shaped shields and screw mechanism and end shields, and the adjusting devices are in contact with the L-shaped shields and screw mechanism and end shields, and the adjusting devices are in contact with the L-shaped shields and screw mechanism and end shields, and the adjusting devices are in contact with the L-shaped shields and screw mechanism and end shields, and the adjusting devices are in contact with the L-shaped shields and screw mechanism and end shields, the adjusting devices are in contact with the L-shaped shields and screw mechanism and end shields, and the adjusting devices are in contact with the L-shaped shields and the screw mechanism and end shields, and the adjusting devices are in contact with the L-shaped shields and screw mechanism and end shields, the adjusting devices are in contact with the L-shaped shields and the screw mechanism and end shields, and the adjusting devices are in contact with the L-shaped shields and screw mechanism and end shields; mounted on a frame and hingedly connected to face shields.
2020
На фиг. I представлена опалубка в рабочем положении; на фиг. 2 - то же, во врем распалубки; на фиг. 3 - опалубка в оксонометрии.FIG. I shows the formwork in working position; in fig. 2 - the same, during stripping; in fig. 3 - formwork in oxonometry.
Опалубка включает два пространственных щита 1 Г-образной формы с плоскост ми из листовой стали, усиленными гнутыми профил ми по вертикали и несущими балками по горизонтали, короткие стороны щитов соединены щарнирной вставкой 2, длинные стороны щитов снабжены торцовыми щитами 3, на которых щарнирно закреплена составна щтанга 4 с блокируемым шарниром 5 в центре. Формующие щиты 1 с помощью кронщтейнов 6 установлены на раме 7, выполненной из несущих балок 8, соединенных между собой трубчатыми элементами 9 измен емой длины, рассчитанными дл переналадки опалубки на заданный шаг. Рама 7 оборудована телескопическими упорами 10 и винтовыми домкратами П. Дл перемещени щарнирной вставки 2 предусмотрен шарнирно-винтовой механизм 12. Работа с опалубкой осуществл етс с площадкой обслуживани 13. Перемещение опалубки выполн етс специальной траверсой 14.The formwork includes two spatial panels of 1 L-shaped form with planes of sheet steel, reinforced vertical profiles and supporting beams horizontally, the short sides of the shields are connected by a hinged insert 2, the long sides of the shields are provided with end shields 3 on which the hinged part is attached pole 4 with a lockable hinge 5 in the center. Forming shields 1 with brackets 6 are mounted on a frame 7 made of supporting beams 8 interconnected by variable-length tubular elements 9, designed to readjust the formwork to a predetermined pitch. The frame 7 is equipped with telescopic stops 10 and screw jacks P. To move the hinged insert 2, a pivot-screw mechanism 12 is provided. Work with the formwork is carried out with the service platform 13. The formwork is moved by a special crosspiece 14.
Подготовка опалубки к работе производитс в следующей последовательности.Preparation of the formwork for work is performed in the following sequence.
Опалубку посредством изменени длиHt i трубчатых элементов 9 рамы 7 и щарнирной вставки 2 составной щтанги 4 собирают в соответствии с заданными габаритами формуемой чейки 15, при этом Г-образные щиты 1 устанавливают с помощью телескопических упоров 10 в рабочее положение и блокируют относительно рамы 7 кронщтейнами 6, а торцовые щиты 3 блокируют составной щтангой 4 и щарниром 5.The formwork by changing the length Ht i of the tubular elements 9 of the frame 7 and the hinged insert 2 of the composite bar 4 is assembled in accordance with the predetermined dimensions of the moldable cell 15, while the L-shaped shields 1 are installed with the help of telescopic lugs 10 into the working position and are blocked relative to the frame 7 by means of 6 brackets 6 , and end shields 3 are blocked by composite shtanga 4 and joint 5.
Далее опалубку устанавливают на перекрытии , выравнивают ее в вертикальной плоскости с помощью винтовых домкратов 11, установленных на раме 7. Затем произ / ///Next, the formwork set on the floor, align it in a vertical plane with screw jacks 11 mounted on the frame 7. Then proiz / ///
LL
лл ll
водитс бетонирование. После достижени бетоном заданной прочности производ т распалубку , дл чего разблокируют кронщтейны 6 и щарнир 5 составной штанги, при этом торцовые щиты 3 поворачивают внутрь опалубки. Затем телескопическими упорами 10 производ т отрыв щитов, а щарнирновинтовым механизмом 12 увеличивают зазор между щитами 1 и чейкой 15 дл облегчени съема опалубки. Съем опалубки выполн ют с помощью специальной траверсы 14.concreting. After the concrete reaches the specified strength, demolding is performed, for which the brackets 6 and the hinge 5 of the composite rod are unlocked, while the end shields 3 are turned into the formwork. Then the telescopic lugs 10 make the shields detachable, and the sharnirnovy screw mechanism 12 increases the gap between the shields 1 and the cell 15 to facilitate the removal of the formwork. Removal of the formwork is carried out using a special traverse 14.
Опалубка краном переноситс на следующее рабочее место. При распалубке и установке опалубки площадки обслуживани 13 могут не сниматьс .The formwork is transferred by crane to the next job. When dismantling and installing the formwork, the service platform 13 may not be removed.
Дл изменени длины формуемой чейки по длинным сторонам Г-образных щитов предусматриваетс введение дополнительных вставок 16.To change the length of the molded cell along the long sides of the L-shaped shields, it is provided to introduce additional inserts 16.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792725944A SU787598A1 (en) | 1979-02-16 | 1979-02-16 | Modular form |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792725944A SU787598A1 (en) | 1979-02-16 | 1979-02-16 | Modular form |
Publications (1)
Publication Number | Publication Date |
---|---|
SU787598A1 true SU787598A1 (en) | 1980-12-15 |
Family
ID=20810737
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU792725944A SU787598A1 (en) | 1979-02-16 | 1979-02-16 | Modular form |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU787598A1 (en) |
-
1979
- 1979-02-16 SU SU792725944A patent/SU787598A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20180169897A1 (en) | Upright concrete wall panel form apparatus and associated methods | |
US4342440A (en) | Concrete deck forming apparatus | |
JP2000087316A (en) | Method and device for construction of floor slab | |
SU787598A1 (en) | Modular form | |
CN112223496A (en) | Simple mould for assembling building unit | |
US4348004A (en) | Ledger for concrete deck forming apparatus | |
RU177134U1 (en) | FORMWORK FOR MONOLITHIC CONCRETE OF CONSTRUCTION STRUCTURES | |
CN213797166U (en) | Simple mould for assembling building unit | |
JP2000087315A (en) | Method and device for construction of floor slab | |
KR102636240B1 (en) | Tableform system and method of disassembling by the same | |
KR102620613B1 (en) | Method for constructing prefabricated deck unit for elevator core construction | |
SU938750A3 (en) | Form for making ribbed cast-in-place reinforced concrete floor | |
SU1726699A1 (en) | Movable formwork | |
SU863810A1 (en) | Three-dimensional shiftable form | |
SU1411414A1 (en) | Forms for concreting a solid ceiling | |
SU613059A1 (en) | Block movable form | |
SU1099033A1 (en) | Forms for concreting monolithic floor | |
JP2000087314A (en) | Method and device for construction of floor slab | |
GB631100A (en) | Improvements in and connected with the construction of concrete buildings and like structures | |
SU737600A1 (en) | Method of making a floor in sliding form | |
SU1011836A1 (en) | Forms for concrete walls | |
KR102121363B1 (en) | Functional supporter and constructing method for a protrusion of construction structure using the same, and the construction structure constructed by the method | |
SU1722843A1 (en) | Device for manufacturing volumetric ferroconcrete blocks | |
SU958632A1 (en) | Jig for positioning a structure | |
SU487217A1 (en) | Block mold for concreting building structures |