SU574535A1 - Method of developing thick unstable ore body - Google Patents
Method of developing thick unstable ore bodyInfo
- Publication number
- SU574535A1 SU574535A1 SU7402039034A SU2039034A SU574535A1 SU 574535 A1 SU574535 A1 SU 574535A1 SU 7402039034 A SU7402039034 A SU 7402039034A SU 2039034 A SU2039034 A SU 2039034A SU 574535 A1 SU574535 A1 SU 574535A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- ore body
- unstable
- developing
- ore
- developing thick
- Prior art date
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
Изобретение относитс к области черной промышленности и может быть использовано при подземной разработке рудных месторождений с закладкой выработанного пространства .The invention relates to the field of black industry and can be used in the underground mining of ore deposits with the laying of the goaf.
Известен способ разработки мощной неустойчивой рудной залежи, заключающийс в разделении выемочного участка на несколько горизонтальных слоев, отработке каждого сло поперечными заходками с последующей закладкой их бетоном на заранее уложенную на почве выработки металлическую арматуру дл отработки последующего сло под искусственной кровлей 1.There is a method of developing a powerful unstable ore deposit, which consists in dividing the excavation site into several horizontal layers, working each layer with transverse windings followed by laying them with concrete on the metal reinforcement laid beforehand on the soil for mining the subsequent layer under the roofing 1.
Недостатком такого способа вл етс высока трудоел кость закладочных работ.The disadvantage of this method is the high laboriousness of backfilling.
Кроме того, известен способ разработки мощной неустойчивой рудной залежи горизонтальными сло ми с закладкой, при котором очистные работы ведутс под защитой закладочного массива со стороны кровли и опережающей крепи (искусственных целиков) с боков 2.In addition, there is a known method of developing powerful unstable ore deposits with horizontal layers with a bookmark, in which the cleaning works are carried out under the protection of the backfill array from the roof side and the advancing support (artificial pillars) from the sides 2.
Недостатком такого способа разработки вл етс больща трудоемкость закладочных работ и высока себестоимость добычи полезного ископаемого.The disadvantage of this method of development is the greater laboriousness of the backfilling and the high cost of mining.
Цель изобретени - снижение трудоемкости и себестоимости добычи полезного ископаемого .The purpose of the invention is to reduce the complexity and cost of mining.
Это достигаетс тем, что предварительно поThis is achieved by preliminarily
всему выемочному участку создают опережающую бетонную крепь в виде объемиой рещетки путем последовательного проведени одна над другой сети выработок по простиранию и вкрест простпрани залежи с последующей их закладкой твердеющей смесью и созданием в верхнем слое сплощного перекрыти из твердеющей закладки, под защитой которых отрабатывают весь выемочный участок.throughout the excavation area, an advance concrete lining in the form of a grating is created by successively conducting one above the other network of workings along the strike and cross of the reservoir with subsequent laying them with a hardening mixture and creating a solid slab in the upper layer, under the protection of which they work out the entire excavation section.
На фиг. 1 представлен разрез рудного телаFIG. 1 shows an ore body incision.
вкрест простирани ; на фиг. 2 - разрез поacross the strike; in fig. 2 - section along
А-А на фиг. 1; на фиг. 3 - разрез по Б-БA-A in FIG. one; in fig. 3 - section along BB
на фиг. 2.in fig. 2
Подготовительные работы заключаютс вThe preparatory work is
проходке полевого 1 и рудного 2 восстаюи их, из которых соответственно нарезают слоевые штреки 3 и орты 4.penetrating field 1 and ore 2 revolts them, of which lay drifts 3 and orta 4 respectively.
Добычные работы начинают с сооружени по всему выемочному участку опережающейMining operations begin with construction throughout the excavation site
бетонг ой крепи в виде объемной рещетки путем последовательного проведенп закладочных штреков 5 и под ними закладочных ортов 6, в которых устанавливают изол ционные перемычки 7 и затем закладывают твердеющей смесью. Верхний слой отрабатываетс полностью и заполн етс твердеюпим материалом . Таким образом сооружают сплощиое бетонное перекрытие 8. Количество щтреков 5 ИЛ;: onTo:i 6 i:a cnoi ;;:Kiiciif oi прочиостных характеристик рудной залежи, но пролет между ними должен быть кратным их щирине . Так слой за слоем на всю высоту выемочного участка проход т штреки 5 и орты 6 друг над другом по простиранию и вкрест простирани рудной залежи соответственно. Каждый штрек и орт по мере проходки заполн етс твердеющей закладкой.Concrete bracing in the form of a volumetric lattice was carried out by successively laying backfills 5 and under them backfilling holes 6, in which insulating bridges 7 were installed and then laid with a hardening mixture. The upper layer is worked out completely and is filled with a hardenable material. Thus, a solid concrete overlap is constructed 8. The number of shchtrek 5 IL ;: onTo: i 6 i: a cnoi ;;: Kiiciif oi prochiostnyh characteristics of the ore deposit, but the span between them must be a multiple of their width. So, layer by layer, the drifts 5 and orths 6 pass one another along the strike and across the strike of the ore deposit, respectively, over the entire height of the excavation section. Each drift and ort as it goes is filled with a hardening bookmark.
Укрепив таким образом рудную зону, под заш,итой объемной решетки ведут очистные работы по добыче оставшейс руды на выемочном участке системой разработки горизонтальными сло ми сверху вниз без дополнительного креплени .Having thus strengthened the ore zone, under the zone, with the volume grate, refining works are carried out to extract the remaining ore in the excavation area with the development system in horizontal layers from top to bottom without additional attachment.
Изобретение позвол ет снизить себестоимость конечного продукта за счет сокраш ени на 50% расхода закладочного материала и уменьшени объемов трудоемких работ по закладке выработанного пространства.The invention allows to reduce the cost of the final product due to a 50% reduction in the consumption of backfill material and a decrease in the volume of labor-intensive work on laying the worked-out space.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU7402039034A SU574535A1 (en) | 1974-07-01 | 1974-07-01 | Method of developing thick unstable ore body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU7402039034A SU574535A1 (en) | 1974-07-01 | 1974-07-01 | Method of developing thick unstable ore body |
Publications (1)
Publication Number | Publication Date |
---|---|
SU574535A1 true SU574535A1 (en) | 1977-09-30 |
Family
ID=20589374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU7402039034A SU574535A1 (en) | 1974-07-01 | 1974-07-01 | Method of developing thick unstable ore body |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU574535A1 (en) |
-
1974
- 1974-07-01 SU SU7402039034A patent/SU574535A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2632087C2 (en) | Method for developing coal with benching and backfilling in adjacent stope drifts of wangeviry type | |
SU574535A1 (en) | Method of developing thick unstable ore body | |
SU1668667A1 (en) | Method for combination mining of gently sloping seams | |
RU2114307C1 (en) | Method for opencast mining of flooded mineral deposits | |
SU1203241A1 (en) | Method of mining mineral deposits with filling-up of excavated space | |
SU1266988A1 (en) | Method of working pillars | |
SU732532A1 (en) | Method for mining gently sloping mineral seams | |
RU2107818C1 (en) | Method for development of flat and inclined seams of minerals | |
SU998759A1 (en) | Method of controlling rock pressure | |
SU1795100A1 (en) | Method for mining thick steeply dipping coal seams | |
SU546715A1 (en) | The way to develop weak unstable ores | |
RU2444624C1 (en) | Method of full development of gently sloping coal beds with power-driven systems without any preparatory mine workings | |
SU1129354A1 (en) | Method of underground working of mineral deposits | |
SU949179A1 (en) | Method for underground working of seam deposits | |
SU1710750A1 (en) | Method of mining thick coal seams with filling | |
SU649845A1 (en) | Method of excavating slightly inclined seams of minerals | |
SU1067214A1 (en) | Method of working gently sloping deposits | |
SU1191590A1 (en) | Tunnel lining | |
SU1461942A1 (en) | Method of mining thick ore deposits | |
SU981609A1 (en) | Method of working near-shaft pillars in thick gently-sloping deposits | |
SU905465A1 (en) | Method of working gently sloping ore deposits | |
SU827790A1 (en) | Method of working thick gently sloping mineral deposits | |
SU920217A1 (en) | Method of working high-capacity deposits | |
SU715798A1 (en) | Method of mining gently sloping ore bodies | |
SU679729A1 (en) | Method of mining thick steep and gently sloping coal beds |