SU52035A1 - Metal shield - Google Patents

Metal shield

Info

Publication number
SU52035A1
SU52035A1 SU189705A SU189705A SU52035A1 SU 52035 A1 SU52035 A1 SU 52035A1 SU 189705 A SU189705 A SU 189705A SU 189705 A SU189705 A SU 189705A SU 52035 A1 SU52035 A1 SU 52035A1
Authority
SU
USSR - Soviet Union
Prior art keywords
shield
metal shield
metal
sections
cutting mechanisms
Prior art date
Application number
SU189705A
Other languages
Russian (ru)
Inventor
И.А. Журавлев
Original Assignee
И.А. Журавлев
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by И.А. Журавлев filed Critical И.А. Журавлев
Priority to SU189705A priority Critical patent/SU52035A1/en
Application granted granted Critical
Publication of SU52035A1 publication Critical patent/SU52035A1/en

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

При разработке мощных пластов с целью уменьшени  расходов по креплению очистного пространства, а также дл  обеспечени  безопасности работ стали примен ть в полого падающих пластах передвижные металлические щиты.When developing powerful seams in order to reduce the costs of fixing the cleaning space, as well as to ensure safety of work, mobile metal shields were used in hollow falling seams.

Предлагаема  конструкци  металлического щита отличаетс  тем, что, с целью приспособлени  щита дл  разработки круто падающих пластов, обе опоры щита снабжены режущими механизмами.The proposed design of a metal shield is characterized in that, in order to adapt the shield for the development of steeply falling layers, both supports of the shield are provided with cutting mechanisms.

На чертеже изображен разрез пласта по падению и вид металлического щита сбоку.The drawing shows a section of the reservoir in the fall and the type of metal shield on the side.

Цифрой / обозначена верхн   часть угл , после выемки которого обрушенна  кровл  2 располагаетс  над щитом, сползающим по лежачему боку 5 пласта . Фермы щита соединены шарнирами 4 и упираютс  со стороны лежачего бока на полозь  5, а со стороны кровли-на режущие механизмы 6; с другой стороны полозь  5 также снабжены режущими механизмами 6; фермы щита закрепл ютс  распорной трубой // с механизмом, служащим дл  увеличени  и уменьшени  ширины металлического щита или отдельных его секций при изменени х мощности пласта.The number / denotes the upper part of the coal, after the excavation of which the collapsed roof 2 is located above the shield, which crawls along the recumbent side 5 of the seam. Shield trusses are connected by hinges 4 and abutting from the side of the recumbent side to the skid 5, and from the side of the roof to the cutting mechanisms 6; on the other hand, the skid 5 is also provided with cutting mechanisms 6; shield trusses are fixed by an expansion pipe // with a mechanism serving to increase and decrease the width of the metal shield or its individual sections with variations in the thickness of the formation.

Дл  транспортировки добытого угл  должны быть проведены по падению пласта скаты-гезенки до подэтажного штрека или до нижней границы рабочего пол .In order to transport the mined coal, the gezenka slopes should be carried along the dip of the formation to the sublevel drift or to the lower boundary of the working floor.

Вс  работа этого самодвижущегос  металлического щита получаетс  в результате давлени  обрушенной горной массы, причем подвигание идет сверху вниз.All the work of this self-propelled metal shield is obtained as a result of the pressure of the collapsed rock mass, with the advance going from the top down.

Таким металлическим щитом можно перекрыть длинный забой по линии простирани  пласта на всю его мощность , а сверхмощные пласты можно будет вырабатывать пачками, забира  первую пачку от вис чего бока. Внутри этого щита можно будет примен ть все виды отбойки и транспортировки .This metal shield can block a long bottom along the strike line of the reservoir to its full capacity, and super-power layers can be produced in batches, picking up the first pack from the side of the wall. Inside this shield it will be possible to apply all types of blasting and transportation.

Работа при этом щите заключаетс  в производстве вертикального вруба 8, отбойки или фрезеровани  под опорными концами 6, причем полозь опоры 5 всегда должны служить ведущими и направл ющими все секции по лежачему боку, тогда как противоположна  опора б может и должна работать как ведома .The operation in this shield is in the manufacture of a vertical cutting 8, blasting or milling under the supporting ends 6, and the runner of the support 5 must always serve as leading and guiding all sections on the recumbent side, while the opposite support b can and should work as a knowledge.

Дл  монтажа металлического щита необходимо сделать сборную камеру с предварительным креплением; после окончани  сборки всех секций этогоTo assemble a metal shield, it is necessary to make an assembly chamber with preliminary fastening; after completing the assembly of all sections of this

щита крепление удал етс  и производитс  первое обрушивание по всей линии простирани . Дл  заполнени  просветов между фермами секций можно примен ть дерев нные расколоты, вставл   их между полками швеллерных и двутавровых балок секцирТ.the shield fastening is removed and the first collapse along the strike line is performed. Wood cracks can be used to fill the gaps between the section trusses, and insert them between the flanges of the channel and I-beam sections.

Предмет изобретени .The subject matter of the invention.

Металлический щит, отличающийс Metal shield, different

тем, что, с целью приспособлени  его дл  разработки круто падающих пластов , обе опоры щита снабжены режущими механизмами 6.by the fact that, in order to adapt it to develop steeply falling layers, both shield supports are equipped with cutting mechanisms 6.

SU189705A 1936-03-20 1936-03-20 Metal shield SU52035A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU189705A SU52035A1 (en) 1936-03-20 1936-03-20 Metal shield

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU189705A SU52035A1 (en) 1936-03-20 1936-03-20 Metal shield

Publications (1)

Publication Number Publication Date
SU52035A1 true SU52035A1 (en) 1936-11-30

Family

ID=48364342

Family Applications (1)

Application Number Title Priority Date Filing Date
SU189705A SU52035A1 (en) 1936-03-20 1936-03-20 Metal shield

Country Status (1)

Country Link
SU (1) SU52035A1 (en)

Similar Documents

Publication Publication Date Title
SU52035A1 (en) Metal shield
CN114320417A (en) Anchoring forward-moving type rapid tunneling and supporting device and working method thereof
SU141125A1 (en) The method of excavation of coal under flexible overlap
SU796425A1 (en) Method of excavating gently sloping coal beds
US2272013A (en) Method of mining
SU71696A1 (en) The way to develop cleansing faces
SU514101A1 (en) The way to maintain the development workings
RU2168629C1 (en) Method of mining of thick flat coal bed
SU907252A1 (en) Method of working coal beds
SU97031A1 (en) The method of construction of the overlap of wire mesh in the development of powerful, oblique coal seams
SU887809A1 (en) Method of mining sloping and gently sloping coal beds
SU1671871A1 (en) A method of protecting preliminary drift in working thick beds
SU898075A2 (en) Method of working ore deposits
SU985292A1 (en) Method of mining thick sloping coal beds
SU1714131A1 (en) Method of mining flat stratified mineral deposits
SU877054A1 (en) Excavating machinery set
SU662715A1 (en) Method of excavating thick slightly inclined seams of minerals with hard rock
SU97852A1 (en) The method of increasing the strength of dyes with oxyazo dyes obtained on the fiber to friction
SU631657A1 (en) Method of excavating thick orebodies
SU115838A1 (en) Tunneling board for installing tubing in vertical trunks
RU2013547C1 (en) Method for steep coal seams mining
SU899955A1 (en) Method of mining thin and medium-thick coal beds
SU110613A1 (en) The method of redeeming the cross-hole pillars coal and device for implementing the method
SU1293364A1 (en) Method of mining shock-hazardous coal seams
SU685826A1 (en) Method of mining gently sloping and sloping ore bodies