SU421735A1 - METHOD OF DIPPING THE SUPPORT WELL IN GROUND - Google Patents

METHOD OF DIPPING THE SUPPORT WELL IN GROUND

Info

Publication number
SU421735A1
SU421735A1 SU1748837A SU1748837A SU421735A1 SU 421735 A1 SU421735 A1 SU 421735A1 SU 1748837 A SU1748837 A SU 1748837A SU 1748837 A SU1748837 A SU 1748837A SU 421735 A1 SU421735 A1 SU 421735A1
Authority
SU
USSR - Soviet Union
Prior art keywords
well
ground
lowering
walls
dipping
Prior art date
Application number
SU1748837A
Other languages
Russian (ru)
Inventor
И. Бол чевский Б.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1748837A priority Critical patent/SU421735A1/en
Application granted granted Critical
Publication of SU421735A1 publication Critical patent/SU421735A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

Изобретение относитс  к области производства специальных строительных работ и может быть использовано при возведении подземных сооружений различного назначени  методом опускного колодца. Известны способы погружени  опускного колодца в грунт путем разработки грунта в полости колодца с оставлением опорных зон у ножевой части. При очередной посадке опускного колодца опорные зоны должны разрабатыватьс  равномерно. Однако из-за различных природных и производственных условий , как правило, не удаетс  известными методами обеспечить равномерное и пр молинейное опускание колодца. Это приводит к перекосам колодца, утечке тиксотронного раствора , а иногда и к деформаци м оболочки колодца. Цель изобретени  - обеспечение возможности регулировани  процесса погружени  дл  достижени  равномерного опускани  колодца . Достигаетс  это тем, что перед погружением колодца но его периметру устраивают грунтовые анкеры с анкерными т гами, пропускают анкерные т ги в стенах колодца, соедин ют их с домкратами, установленными на стенах колодца, после чего производ т по руспое задавливание колодца с одновременным извлечением грунта из полости и регулированием нат жени  анкерных т г. При этом нож колодца всегда оказываетс  заглубленным в грунт, а величина заглублени  регулируетс  не подработкой грунта нод ножом колодца, а нат жением анкерных т г. Сущность изобретени  по сн етс  чертежом , где изображен погружаемый колодец в разрезе. Перед началом работ по возведению колодца с цоверхности земли по контуру стен опускного колодца пробуривают скважины У, причем в нижней их части может быть устроено уширение 2. В скважину оиускают канат 3 с анкерным устройством 4 на конце, после че- . го бетонируют анкерное устройство. Па новерхности грунта возвод т стены 5 опускного колодца, канаты 3 пропускают в каналах 6, устраиваемых в стенах опускного колодца. Па стенах опускного колодца устанавливают домкраты 7, к котсфым присоедин ют анкерные т ги. Процесс опускани  колодца осуществл ют следующим образом. Опускание колодца начинают путем выемки грунта из полости 8 колодца, причем грунт из-под ножа не извлекают. После раз1работки рунта па глубину одного  руса, включают омкраты и колодец задав дива ют на опредеенную глубину в грунт, после чего извлека )т часть грунта 9, выдавленную ножом ко .одца, и цикл повтор ют.The invention relates to the field of special construction work and can be used in the construction of underground structures for various purposes using the drop well method. Methods are known for immersing a bottomhole in the ground by excavating the soil in the well cavity, leaving the bearing zones at the knife portion. When the well is sown again, the support zones should be developed evenly. However, due to the different natural and production conditions, it is usually not possible to ensure uniform and straight lowering of the well by known methods. This leads to distortions of the well, leakage of the thixotronic solution, and sometimes even deformations of the shell of the well. The purpose of the invention is to provide the ability to control the immersion process to achieve uniform lowering of the well. This is achieved by the fact that before diving the well, but its perimeter is arranged with ground anchors with anchor rods, the anchors are let through the walls of the well, connected to jacks mounted on the walls of the well, and then crushed the well along with the extraction of soil. of the cavity and the regulation of the tension of the anchor tons. At the same time, the knife of the well always remains buried in the ground, and the magnitude of the deepening is not regulated by working the soil with the node knife of the well but by tensioning the anchor tons. the acquisition is illustrated in the drawing, which shows a submersible well in a section. Before starting work on the construction of a well, well wells U are drilled along the contour of the walls of the subsurface well along the contour of the lowering well, and widening 2 can be arranged in the lower part of them. Rope 3 with an anchor device 4 is installed at the end, after what. go to concrete anchor device. The soil surfaces erected walls 5 of the lowering well, the ropes 3 are passed in channels 6, arranged in the walls of the lowering well. Jacks 7 are placed on the walls of the well, and anchor rods are attached to the coils. The process of lowering the well is carried out as follows. Lowering the well begin by excavation from the cavity 8 of the well, and the soil from under the knife is not removed. After the root has been developed in one single depth, turn on the omcrats and the well, setting the depth to a certain depth in the ground, after which a part of the ground 9 is extruded by the knife of the coke, and the cycle is repeated.

Попеременное задавливание и извлечение рунта осуществл ют до тех пор, пока колодец е опуститс  в проектное положение. Измен   силие различных домкратов, регулируют лубину задавливани  по контуру колодца, . е. управл ют процессом опускани .Alternating crushing and extraction of the root is carried out until the well e is lowered into the design position. Changing the force of various jacks, adjust the crush lip along the contour of the well,. E. Control the lowering process.

После завершени  процесса опускани  коодца анкерные т ги могут быть заделаны в аналах стен колодца. В этом случае они служат  кор ми против всплыти  при устройстве одземного сооружени  в водонасыщенных рунтах.After completing the process of lowering the code, the anchor rods can be embedded in the anal walls of the well. In this case, they serve as anti-ascents when setting up an overhead structure in water-saturated runes.

Предмет изобретени  Способ погружени  опускного колодца в грунт путем разработки грунта в полости колодца с оставлением опорных зон у ножевой части, отличающийс  тем, что, с целью обеспечени  возможности регулировани  процесса погружени , паред погружением колодца по его периметру устраивают грунтовые анкеры с анкерными т гами, пропускают анкерные т ги в стенах колодца, соедин ют их с домкратами , установленными на стенах колодца, после чего производ т по русное задавливание колодца с одновременным извлечением грунта из полости и регулированием нат жени  анкерных т г.The subject of the invention. A method of immersing a manhole in the ground by excavating the soil in the well cavity, leaving the bearing zones at the blade part, characterized in that, in order to make it possible to control the immersion process, soil anchors with anchor rods are arranged by immersing the well along its perimeter. anchor rods in the walls of the well, connect them with jacks mounted on the walls of the well, after which they crush the well while simultaneously removing the soil from the cavity and ulirovaniem tension anchor, the t

SU1748837A 1972-02-15 1972-02-15 METHOD OF DIPPING THE SUPPORT WELL IN GROUND SU421735A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1748837A SU421735A1 (en) 1972-02-15 1972-02-15 METHOD OF DIPPING THE SUPPORT WELL IN GROUND

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1748837A SU421735A1 (en) 1972-02-15 1972-02-15 METHOD OF DIPPING THE SUPPORT WELL IN GROUND

Publications (1)

Publication Number Publication Date
SU421735A1 true SU421735A1 (en) 1974-03-30

Family

ID=20503459

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1748837A SU421735A1 (en) 1972-02-15 1972-02-15 METHOD OF DIPPING THE SUPPORT WELL IN GROUND

Country Status (1)

Country Link
SU (1) SU421735A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2491387C1 (en) * 2012-02-29 2013-08-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный архитектурно-строительный университет" Method to erect recessed structures and underground structures of buildings

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2491387C1 (en) * 2012-02-29 2013-08-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный архитектурно-строительный университет" Method to erect recessed structures and underground structures of buildings

Similar Documents

Publication Publication Date Title
US3453832A (en) Cast-in-place casings for concrete piles
GB1377839A (en) Method for in situ anchoring piling
CN115045688A (en) Method for treating gushing water of high-buried-depth tunnel by adopting blocking-before-draining method
SU421735A1 (en) METHOD OF DIPPING THE SUPPORT WELL IN GROUND
CN109322315A (en) A kind of retaining structure and its construction method for high Steep Slope Embankment location
CN105239575B (en) One kind drilling base expanding and base expanding grouting Static Pipe Pile Construction device and construction method
RU2491387C1 (en) Method to erect recessed structures and underground structures of buildings
US2468265A (en) Foundation
US3423944A (en) Method for forming end bearing concrete piles
ATE16296T1 (en) PILES.
GB1391109A (en) Method for producing pile or like structural columns in situ
SU773199A1 (en) Method of lowering a cased well into ground
SU1281635A1 (en) Drill and cast-in-place anchor and method of injecting same
SU1064689A1 (en) Method of shaft sinking by means of sinkable structure
RU2063497C1 (en) Method for erecting foundation
SU386066A1 (en) METHOD OF CONDUCTING THE FOUNDATION UNDER EXISTING BUILDINGS AND FACILITIES
SU1636525A1 (en) Method for sinking caisson
SU1423672A1 (en) Method of sinking casing well into soil of foundation of hydraulic structure
SU815123A1 (en) Method of driving a vertical working
SU1742485A1 (en) Shaft sinking method
US1593445A (en) Method of installing mushroom piling
RU2634759C1 (en) Method of auger pile construction
SU1283396A1 (en) Method of constructing sinkable well
SU1668557A1 (en) Method for erecting "wall in ground"
SU394498A1 (en) Footwell