SU1283396A1 - Method of constructing sinkable well - Google Patents

Method of constructing sinkable well Download PDF

Info

Publication number
SU1283396A1
SU1283396A1 SU853958319A SU3958319A SU1283396A1 SU 1283396 A1 SU1283396 A1 SU 1283396A1 SU 853958319 A SU853958319 A SU 853958319A SU 3958319 A SU3958319 A SU 3958319A SU 1283396 A1 SU1283396 A1 SU 1283396A1
Authority
SU
USSR - Soviet Union
Prior art keywords
trench
well
water
depth
anchor rods
Prior art date
Application number
SU853958319A
Other languages
Russian (ru)
Inventor
Кубади Николаевич Басиев
Ахсар Николаевич Басиев
Элеонора Васильевна Мальцева
Сергей Сергеевич Коровченко
Юрий Элизарович Бронштейн
Original Assignee
Московское Специализированное Управление Треста "Гидроспецфундаментстрой"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Московское Специализированное Управление Треста "Гидроспецфундаментстрой" filed Critical Московское Специализированное Управление Треста "Гидроспецфундаментстрой"
Priority to SU853958319A priority Critical patent/SU1283396A1/en
Application granted granted Critical
Publication of SU1283396A1 publication Critical patent/SU1283396A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Изобретение относитс  к области подземного строительства. Цель - снижение затрат на строительство за счет совмещени  меропри тий по зааи- кериванию днища и водопонижеиию, Дл  этого перед погружением опускного колодца (ОК) I в его центральной плоскости образуют выход щую за его пределы траншею (т) 2 с вертикальными стенками. Глубина Т 2 превьшает глубину погружени  ОК 1. Образование Т 2 ведут под защитой воды с помощью создани  ее избыточного давлени  в ,Т 2 посредством посто нного долива. Затем на дно Т 2 укладывают перфорированную трубу 3 с предварительно присоединенными вертикальными анкерными стержн ми А-А (ЛThis invention relates to the field of underground construction. The goal is to reduce construction costs by combining bottom-bottoming and water downfall. To do this, before diving the lowering well (OK) I in its central plane, form a trench (t) 2 out of its limits with vertical walls. The depth T 2 exceeds the depth of submersion OK 1. The formation of T 2 is carried out under the protection of water by creating its excessive pressure in T 2 by means of constant topping-up. Then a perforated pipe 3 with previously attached vertical anchor rods A-A (L

Description

От6о8 Воды 6From 6-8 Water 6

:i: i

INDIND

0000

со со оwith so about

Фиг. 2FIG. 2

(AC) 4. Дну придают уйлон и в нижнюю точку Т 2 опускают вертикальную трубу 5 с размещенным в ней погружным насосом 7 с трубопроводом 8, Т 2 заполн ют дренирующим материалом. После этого производ т заанкеривание днища 10 путем св зи его с АС 4, В случае необхо;ц мости (в зависимости от параметров ОК 1 и гидрогеологических условий) в перфорированную трубу нагне тают тампонажный раствор . 3 в .п , ф-лы, 4 ил.(AC) 4. Utilon is attached to the bottom and a vertical pipe 5 with a submersible pump 7 with a pipeline 8, T 2 is placed in the lower point T 2 and filled with drainage material. After that, anchoring of the bottom 10 is effected by contacting it with AC 4. If necessary (depending on the parameters of OK 1 and hydrogeological conditions), the cement slurry is injected into the perforated pipe. 3 v. P, f-ly, 4 ill.

1one

Изобретение относитс  к подземному строительству и касаетс  сооружени  опускных колодцев различногЪ назначени .The invention relates to underground construction and relates to the construction of subsidence wells for various purposes.

Целью изобретени   вл етс  снижение затрат на строительство за счет совмещени  меропри тий по заанкери- ванию днища и водопонижению.The aim of the invention is to reduce construction costs by combining measures for anchoring the bottom and water lowering.

На фиг.1 изображен опускной колодец в момент погружени , вид в плане; на фиг.2 - разрез А-А на фиг.1; на фиг .3 - узел I на фиг. 2; на фиг. 4 разрез Б-Б на фиг.З.Fig. 1 shows a drainage well at the time of immersion, a plan view; figure 2 - section aa in figure 1; FIG. 3 shows the node I in FIG. 2; in fig. 4 section bb in fig.Z.

Сооружение опускного колодца осуществл ют следующим образом.The construction of the bottom well is carried out as follows.

Перед монтажом колодца 1 в его центральной плоскости отрывают вертикальную траншею 2 с уклоном в одну сторону. Образование траншеи 2 производ т под защитой воды с помощью создани  избыточного давлени  путем посто нного долива воды при понижении ее уровн . В траншее 2 размещают перфорированную трубу 3, к которой перед укладкой в траншею 2 присоедин ют анкерные стержни 4 путем огибани  ими нижней половины перфорированной трубы 3 и последующей приварки. После укладки в тран- щею 2 перфорированной трубы 3 с анкерными стержн ми 4 в нижнюю точку траншей 2 опускают вертикальную трубу 5, после чего траншею 2 заполн ют дренирующим материалом 6. После монтажа опускного колодца 1 перед его погружением в вертикальную трубу 5 опускают погружной насос 7 с трубопроводом 8. Погружение колодца 1 производитс  под защитой системы водопонижени , обеспечиваемой .погружным насосом 7. Когда кq loдeц 1 займет положение 9, приступают к сооружению днища 10. При этом арматурный каркас последнего (не показан ) соедин ют с анкерными стержн ми 4, освобожденными от грунта при его выемке из котлована, после чего приступают к бетонированию днища 10. После окончани  водопонижени  при необходимости (в зависимости от параметров опускного колодца и гидрогеологических условий местности) в перфорированную трубу 3 нагнетают тампонажный раствор с целью омонапи- чивани  дренирующего материала: 6, заполн ющего траншею 2.Before installing the well 1 in its central plane, a vertical trench 2 is torn off with a bias to one side. The formation of trench 2 is carried out under the protection of water by creating an overpressure by continuously topping up the water while lowering its level. In the trench 2 a perforated pipe 3 is placed, to which, prior to laying in the trench 2, anchor rods 4 are attached by bending around the lower half of the perforated pipe 3 and subsequent welding. After laying the perforated pipe 3 with anchor rods 4 in the trench 2, the vertical pipe 5 is lowered into the lower point of the trenches 2, then the trench 2 is filled with drainage material 6. After the installation of the subsurface well 1, the submersible pump is lowered into the vertical pipe 5 7 with piping 8. The immersion of the well 1 is performed under the protection of the water lowering system provided by the submersible pump 7. When the kq of deck 1 is in position 9, the construction of the bottom is started 10. At the same time, the reinforcement cage of the latter (not shown) is connected with the anchor rods 4 released from the soil when it is excavated from the excavation, and then proceed to concreting the bottom 10. After the end of the dewatering, if necessary (depending on the parameters of the subsurface well and hydrogeological conditions of the area), the cement slurry is injected into the perforated pipe 3 to homogenize - cleaning drainage material: 6, filling trench 2.

Claims (1)

1. Способ сооружени  опускного колодца, включающий монтаж оболочки , водопонижение с помощью погружных насосов, погружение оболочки в грунт, устройство днища с заанкери- .ванием последнего, отличаю- .щ и и с   тем, что, с целью снижени  затрат на строительство за счет совмещени  меропри тий по за- анкериванию днища и водопонижению, водопонижение осуществл ют путем образовани  в центральной плоскости колодца, выход щей за его пределы, траншеи с вертикальными стенками глубиной, превьшающей глубину погружени  колодца, последующей укладки на дно траншеи перфорированной трубы с вертикальными анкерными стержн ми , установки погружных насосов в одном из углов траншеи и заполнени  ее дренирующим материалом, а за- анкеривание днища производ т путем св зи его с вертикальными анкерными стержн ми, огол емыми при погружении оболочки в грунт, при этом образование траншеи ведут под защитой воды с помощью создани  ее избыточного давлени  в траншее посредством посто нного долива. 1. A method of constructing a drainage well, including mounting the casing, water lowering with the help of submersible pumps, immersing the casing in the ground, arranging the bottom with anchoring the latter, is characterized by the fact that, in order to reduce construction costs by combining the bottom anchoring and dewatering, the dewatering is carried out by forming in the central plane of the well beyond its limits trenches with vertical walls with a depth that exceeds the depth of the well and then laying it on but the trenches of a perforated pipe with vertical anchor rods, installing submersible pumps in one of the corners of the trench and filling it with drainage material, and the bottom is capped by connecting it with vertical anchor rods that are bare when the shell is immersed in the ground. In this way, the formation of a trench is carried out under the protection of water by creating its overpressure in the trench by means of constant topping-up. ГR No в хб о 000 in hb about 000 ТT
SU853958319A 1985-08-26 1985-08-26 Method of constructing sinkable well SU1283396A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853958319A SU1283396A1 (en) 1985-08-26 1985-08-26 Method of constructing sinkable well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853958319A SU1283396A1 (en) 1985-08-26 1985-08-26 Method of constructing sinkable well

Publications (1)

Publication Number Publication Date
SU1283396A1 true SU1283396A1 (en) 1987-01-15

Family

ID=21199064

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853958319A SU1283396A1 (en) 1985-08-26 1985-08-26 Method of constructing sinkable well

Country Status (1)

Country Link
SU (1) SU1283396A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252743A (en) * 2020-09-30 2021-01-22 中国化学工程第六建设有限公司 Installation method of foundation bolt of large-scale equipment foundation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Склин К.С., Глотов Н.М. Опускные колодцы. М.: Транспорт, 1971, с. 91. Байцур А.И. Опускные колодцы, Киев.: Будивельник, 1972, с. 56 и -178. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252743A (en) * 2020-09-30 2021-01-22 中国化学工程第六建设有限公司 Installation method of foundation bolt of large-scale equipment foundation

Similar Documents

Publication Publication Date Title
US3247672A (en) Underwater well head encasement structure
CN102888847B (en) Construction method free from lowering water level for local deep foundation pit of elevator shaft
JPS6149029A (en) Underwater foundation fixer
KR100383409B1 (en) Construction Method of Direct Foundation for using Caisson
CA1243494A (en) Gravity type oceanic structure and its stable installation
US4081970A (en) Underwater structure
SU1283396A1 (en) Method of constructing sinkable well
US4112690A (en) Method and construction of underground tank well
JPS6143493B2 (en)
JP2809105B2 (en) How to build an underground tank
RU2063497C1 (en) Method for erecting foundation
CN214170540U (en) Suspension sinking shaft structure
SU1534142A1 (en) Method of constructing an underground structure
JPH05125741A (en) Drainage structure of basement
RU1825843C (en) Method for erection of a pile foundation on sagging grounds
SU1004537A1 (en) Method of constructing a structure in soil
SU1099086A1 (en) Method of sinking mine shaft through floating earth
JPS5820870A (en) Method of constructing underground storage tank
SU1027317A1 (en) Breakwater erecting method
SU1399394A1 (en) Method of constructing a sinkable well
SU1188247A1 (en) Method of constructing a sinking well
SU1117406A1 (en) Method of securing vertical mine workings
SU414371A1 (en)
SU1133345A1 (en) Method of constructing the underwater part of structure in water-saturated soils
JPS60175611A (en) Reclaiming method