SU1117406A1 - Method of securing vertical mine workings - Google Patents

Method of securing vertical mine workings Download PDF

Info

Publication number
SU1117406A1
SU1117406A1 SU833605389A SU3605389A SU1117406A1 SU 1117406 A1 SU1117406 A1 SU 1117406A1 SU 833605389 A SU833605389 A SU 833605389A SU 3605389 A SU3605389 A SU 3605389A SU 1117406 A1 SU1117406 A1 SU 1117406A1
Authority
SU
USSR - Soviet Union
Prior art keywords
wells
elements
trough
mating
layer
Prior art date
Application number
SU833605389A
Other languages
Russian (ru)
Inventor
Николай Константинович Коньков
Лев Александрович Банин
Галина Борисовна Егорова
Original Assignee
Государственный институт по проектированию оснований и фундаментов "Фундаментпроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственный институт по проектированию оснований и фундаментов "Фундаментпроект" filed Critical Государственный институт по проектированию оснований и фундаментов "Фундаментпроект"
Priority to SU833605389A priority Critical patent/SU1117406A1/en
Application granted granted Critical
Publication of SU1117406A1 publication Critical patent/SU1117406A1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

СПОСОБ КРЕПЛЕНИЯ ВЕРТИКАЛЬНОЙ ГОРНОЙ ВБ1РАБОТКИ, включаюш .ий бурение лидерных и сопр гающих скважин с заглублением их ниже днища выработки , установку в лидерных скважинах вертикальных элементов дво ковогнутого поперечного сечени , введение в сопр гающие скважины элементов с дво ковыпуклой сопр гаемой боковой поверхностью, выемку внутреннего грунтового целика и изготовление днища, отличающийс  тем, что. с целью повыщени  надежности креплени  за счет снижени  бокового гидростатического давлени , в сопр гающие скважины ввод т корытообразные в поперечном сечении элементы с дво ковыпуклой сопр гаемой боковой поверхностью с перфорированными участками в нижних их част х, а затем производ т бетонирование сопр гающих скважин до нижней отметки дна выработки, заполнение пустот за дво ковогнутыми элементами и полостей корытообразных элементов дренирующим материалом, при это.м после выемI ки внутреннего грунтового целика на дно выработки укладывают слой дренирующего (Л материала, а перфорированные участки корытообразных элементов располагают в пределах этого сло . 4 О 05THE METHOD OF FIXING A VERTICAL MINING VB1 WORK, including drilling of leader and connecting wells with their deepening below the production bottom, installing in the leading wells vertical elements of a double-bent cross-section, introducing elements with a double layer with a matching side surface in the leading wells of the secondary surface of the upper surface of the upper surface of the upper section of the upper section. pillar and bottom making, characterized in that. in order to increase the reliability of fastening due to a decrease in lateral hydrostatic pressure, trough-shaped elements with a two-convex mating lateral surface with perforated sections in their lower parts are introduced into cross-sectional wells, and then concreting of the coupling wells is made to the lower mark the bottom of the excavation, filling the voids behind double-bent elements and cavities of the trough-shaped elements with drainage material, in this case, after extraction of the internal ground pillar to the bottom of the extraction heel placed draining layer (material A and the perforated sections have a trough-shaped elements within this layer. 4 About 05

Description

Изобретение относитс  к подземному строительству, касаетс  креплени  вертикальных выработок способом «стена в грунте и может быть нснользовано в горном деле , гражданском нромышленном, коммуналь ном и энергетическом строительстве. Известен способ установки крени вертикальной выработки, включающий бурение оТидерных скважин, разработку промежутков между ними грейфером, нанесение на наружную сторону элементов крепи сло  гидроизол ции (еле  торкрета, кремнийорганической гидроизол ции) и погружение в образуюн1уюс  щель элементов крени 1. Недостатком известного способа  вл етс  мала  эффективность защиты сооружени-  вынолненного снособо.м «стена в грунте от грунтовых вод. Наиболее близким но технической сущности и достигаемому результату к предлагаемому  вл етс  способ креплени  вер„о ,, тикальнои горной выработки, включающий бурение лидерных и сопр гающих скважин с заглублением их ниже днища выработки, установку в лидерных скважинах вертикальных элементов дво ковогнутого поперечного сечени , введение в сопр гающие скважины элементов с дво ковыпуклой сопр гаемой боковой поверхностью, выемку внутреннего грунтового целика и изготовление днища 2. Недостатком известного способа  вл етс  отсутствие защиты сооружени  от грунтовых вод, проникающих через стыки свай и значительное гидростатическое давление на сваи, С |особствую1цее увеличению их сечени . Целью способа  вл етс  новыщение надежности креплени  за счет снижени  бокового гидростатического давлени . Указанна  цель достигаетс  тем, что согласно способу креплени  вертикальной горной выработки, включающему бурение лидерных и сопр гающих скважин с заглублением их ниже днища выработки, установку в лидерных скважинах вертикальных элементов дво ковогнутого поперечного сечени , введение в сонр гающие скважины элементов с дво ковыпуклой сопр гаемой боковой поверхностью, выемку внутреннего грунтового целика и изготовление днища, в сопр гающие скважины ввод т корытообразные в поперечном сечении элементы с дво ковыпуклой сопр гаемой боковой поверхностью с перфорированными участками в нижних их част х, а затем производ т бетонирование сопр гающих скважин до нижней отметки дна выработки, заполнение пустот за дво ковогнутыми элементами и полостей корытообразных элементов дренирующим материалом , при этом после выемки внутреннего грунтового целика на дно выработки укладывают слой дренирующего материала, а перфорированные участки корытообразных элементов располагают в пределах этого сло . На фиг. 1 изображено устройство, реализующее предлагаемый способ, поперечный разрез; на фиг. 2 - разрез А-А на фиг. 1; на фиг. 3 -- разрез Б-Б на фиг. 1. Крепление вертикальной выработки производ т следующим образом. Но контуру выработки бур т лидерные скважины 1 с рассто нием между ними в свету меньщим их диаметра. В скважины 1 ввод т сваи 2 на глубину, обеспечивающую заделку свай 2, имеющих дво ковогнутое поперечное сечение, в грунт. Нри этом образуют в лидерных скважинах 1 полости с поперечным сечением, равные части сечени  пересекаю1дей скважины 3, вход щие в лидерные скважины 1. Носле этого бур т нересекающие скважины 3 до дна будущего котлована, использу  сваи 2 как направл ющие. Бурение скважин 1 и 3 производ т в устойчивых грунтах без применени  глинистой суспензии. Бурение в неустойчивых грунтах с применением глинистой суспензии исключает возможность выполнени  дренажа в перфорированном корытообразном элементе 4. В пробуренные скважины 3 погружают перфорированные корытообразные элементы 4, причем перфораци  на них выполнена в нижней части на пр молинейной стороне, обращенной внутрь котлована на высоту, равную проектируемому дренирующему слою котлована. Далее дл  обеспечени  заделки свай в грунт нагнетают за крепь в лидерные скважины 1 в пространство между грунтовым массивом и дво ковогнутыми сва ми 2 твердеющие растворы 5 с забо  скважины 1 до отметки дна будущего котлована 6 заглубленного поме1цени . Носле застывани  твердеющего раствора 5 засыпают за крепь, образованную сва ми дво ковогнутого поперечного сечени  2 и корытообразными элементами 4, дренирующий материал 7 от от.метки дна будущего котлована 6 до верха корытообразных элементов 4. Далее отрывают котлован 6 под защитой крепи и засыпают слоем дренирующего материала 7, соедин   его в единую дренирующую систему с материалом внутри корытообразных элементов 4. После чего на него укладывают бетон, образу  днище сооружени . Предлагаемый способ позвол ет исклю-. чить необходимость применени  специальных видов гидроизол ции дл  обеспечени  сухости подземных помещений, например металлической, органической и т.д., а также снизить боковое гидростатическое давление на крепь.The invention relates to underground construction, the fastening of vertical workings using the "wall in the ground" method and can be used in mining, civil and industrial, municipal and energy construction. There is a method of installing vertical creep, which includes drilling oteride wells, developing spaces between them with a grab, applying a waterproofing layer (bare gunning, silicone waterproofing) on the outside of the lining and immersing the elements of roll 1 into the gap. A disadvantage of the known method is small the effectiveness of the protection of structures made by the detachment “the wall in the ground from groundwater. The closest to the technical essence and the achieved result to the proposed method is the method of fixing the vertical mining, including drilling the leader and adjoining wells with their deepening below the excavation bottom, installing in the leader wells vertical elements of a double-bent cross-section, introducing mating wells of the elements with a two-convex mating side surface, excavation of the inner ground pillar and fabrication of the bottom 2. The disadvantage of this method is the absence Protection of plants from groundwater penetrating through joints piles and significant hydrostatic pressure on the pile C | osobstvuyu1tsee increase their section. The aim of the method is to increase the reliability of fastening by reducing the lateral hydrostatic pressure. This goal is achieved by the fact that, according to the method of fastening vertical mine workings, including drilling leader and connecting wells with their depth below the bottom of the mine, installing vertical elements of a double-bent cross-section in the leading wells, inserts into the secondary wells of a two-convex matching lateral surface, excavation of the inner soil pillar and production of the bottom; trough-shaped cross-section elements with a two-convex matching are inserted into the junction wells The lateral surface with perforated areas in their lower parts, and then concreting the connecting wells to the lower level of the bottom of the excavation, the voids behind the double-bent elements and the cavities of the trough-shaped elements are drained with drainage material, and after excavation of the internal ground pillar to the bottom of the excavation they stack a layer of drainage material, and the perforated areas of the trough-shaped elements are located within this layer. FIG. 1 shows a device that implements the proposed method, a cross-section; in fig. 2 shows section A-A in FIG. one; in fig. 3 shows a section BB in FIG. 1. The fastening of the vertical excavation is as follows. But the contour of the development of drilling leader wells 1 with a distance between them in the light of smaller diameter. In the wells 1, the piles 2 are introduced to a depth to the ground, which ensure the incorporation of the piles 2 having a double-bent cross-section into the ground. In this way, in the leader wells 1 cavities with a cross section, equal parts of the cross sections of the boreholes 3 enter the leader boreholes 1. At the same time, drill non-intersecting wells 3 to the bottom of the future trench, using piles 2 as guides. Wells 1 and 3 were drilled in stable soils without the use of a clay slurry. Drilling in unstable soils with the use of a clay suspension eliminates the possibility of performing drainage in a perforated trough-shaped element 4. Perforated trough-shaped elements 4 are immersed in the drilled wells 3, and perforations on them are made in the lower part on the straight side facing the inside of the pit to a height equal to the designed draining part trench layer. Further, to ensure embedment of the piles into the ground, for hardening into the leader boreholes 1, hardening solutions 5 from the bottom of the borehole 1 to the bottom of the future excavation 6 of the indented ground are injected into the leader boreholes 1. After solidification of the hardening solution 5, they fall asleep for the lining formed by their double-bent cross-section 2 and trough-shaped elements 4, draining material 7 from the bottom of the future trench 6 to the top of the trough-shaped elements 4. Next, tear out the trench 6 under the protection of the lining and fill it with a layer of draining material 7, connect it to a single drainage system with the material inside the trough-shaped elements 4. After that, concrete is laid on it, forming the bottom of the structure. The proposed method allows for -. The need to use special types of waterproofing to ensure dryness of underground premises, such as metal, organic, etc., as well as to reduce the lateral hydrostatic pressure on the lining.

/1-/1/ 1- / 1

5-Б5 B

Фиг. 2FIG. 2

Фи2.3Fi2.3

Claims (1)

СПОСОБ КРЕПЛЕНИЯ ВЕРТИКАЛЬНОЙ ГОРНОЙ ВЫРАБОТКИ, включающий бурение лидерных и сопрягающих скважин с заглублением их ниже днища выработки, установку в лидерных скважинах вертикальных элементов двояковогнутого по- перечного сечения, введение в сопрягающие скважины элементов с двояковыпуклой сопрягаемой боковой поверхностью, выемку внутреннего грунтового целика и изготовление днища, отличающийся тем, что, с целью повышения надежности крепления за счет снижения бокового гидростатического давления, в сопрягающие скважины вводят корытообразные в поперечном сечении элементы с двояковыпуклой сопрягаемой боковой поверхностью с перфорированными участками в нижних их частях, а затем производят бетонирование сопрягающих скважин до нижней отметки дна выработки, заполнение пустот за двояковогнутыми элементами и полостей корытообразных элементов дренирующим материалом, при этом после выем- с ки внутреннего грунтового целика на дно $5 выработки укладывают слой дренирующего материала, а перфорированные участки корытообразных элементов располагают в пределах этого слоя.METHOD FOR FASTENING A VERTICAL MINING PRODUCTION, including drilling leader and mating wells with deepening them below the bottom of the mine, installing vertical biconcave cross-sectional elements in leader wells, introducing elements from the biconvex mating lateral surface into the mating wells, excavating and making an internal soil target characterized in that, in order to increase the reliability of fastening by reducing lateral hydrostatic pressure, a trough is introduced into the mating wells braznye cross-sectional elements with a side surface of the biconvex mating with perforated sections in their lower parts, and then produce concreting conjugating wells to lower the level of the bottom of the production, filling of voids and cavities biconcave elements trough elements draining material, wherein after the internal vyem- lis a soil pillar at the bottom of the $ 5 excavation lay a layer of drainage material, and the perforated sections of trough-like elements are placed within this layer. SU n„ 1117406 >SU n „1117406> I 117406I 117406
SU833605389A 1983-06-15 1983-06-15 Method of securing vertical mine workings SU1117406A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833605389A SU1117406A1 (en) 1983-06-15 1983-06-15 Method of securing vertical mine workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833605389A SU1117406A1 (en) 1983-06-15 1983-06-15 Method of securing vertical mine workings

Publications (1)

Publication Number Publication Date
SU1117406A1 true SU1117406A1 (en) 1984-10-07

Family

ID=21068467

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833605389A SU1117406A1 (en) 1983-06-15 1983-06-15 Method of securing vertical mine workings

Country Status (1)

Country Link
SU (1) SU1117406A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Руководство по проектированию стен сооружений и противофильтрационных завес, устраиваемых способом «стена в грунте. М., НИИОСП. 1977, с. 7. 2. Авторское свидетельство СССР № 1030555, кл. Е 21 D 1/00, 1982 (прототип) . *

Similar Documents

Publication Publication Date Title
CN102162253B (en) Precipitation construction method employing pipe embedded in deep foundation pits
CN110219359A (en) A kind of Submersed type inspection well and its construction method
US4496268A (en) Method and apparatus for constructing reinforced concrete walls in the earth
JP4132442B2 (en) Tunnel construction method
CN209066468U (en) A kind of base pit dewatering device
CN207211158U (en) Assembled pile board wall foundation pit supporting construction
CN107642101A (en) A kind of rocky bed steel cofferdam back cover leak stopping and guarded drainage construction method
CN106884438A (en) A kind of piping lane foundation trench compound support method of the following collapsible loess of groundwater level
CN110630273A (en) Construction method of totally weathered granite ground layer bias shallow tunnel
SU1117406A1 (en) Method of securing vertical mine workings
JPS6117696A (en) Construction of underground head
JPS5936058B2 (en) How to construct a structure using underground continuous walls
JP2809105B2 (en) How to build an underground tank
KR0179326B1 (en) Construction method of continuous continuous wall by steel support box
CN115262533B (en) Joint-free underground diaphragm wall and construction method thereof
CN115198778B (en) Newly-added underground continuous channel pipe curtain construction method for penetrating upper protection building
RU2686788C1 (en) Method of piled construction in transient soils under conditions of dense urban building
CN217642641U (en) Pipe-penetrating direct-buried cable trench
RU1818417C (en) Method for erection of underground structure
RU1794192C (en) Method for constructing pits
RU2058464C1 (en) Method for making foundation
RU2055209C1 (en) Method for creating underground drifts such as tunnels
CN106087995A (en) The method of stake is built in a kind of boring
RU2539447C2 (en) Method for horizontal draining of waterlogged structures on pile foundations
SU1599476A1 (en) Method of erecting round underground structure