SU1758226A1 - Method of excavating steep trench - Google Patents

Method of excavating steep trench Download PDF

Info

Publication number
SU1758226A1
SU1758226A1 SU904776026A SU4776026A SU1758226A1 SU 1758226 A1 SU1758226 A1 SU 1758226A1 SU 904776026 A SU904776026 A SU 904776026A SU 4776026 A SU4776026 A SU 4776026A SU 1758226 A1 SU1758226 A1 SU 1758226A1
Authority
SU
USSR - Soviet Union
Prior art keywords
trench
transport
niches
embankments
rocks
Prior art date
Application number
SU904776026A
Other languages
Russian (ru)
Inventor
Виктор Анатольевич Берсенев
Original Assignee
Институт горного дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела filed Critical Институт горного дела
Priority to SU904776026A priority Critical patent/SU1758226A1/en
Application granted granted Critical
Publication of SU1758226A1 publication Critical patent/SU1758226A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Изобретение может быть использовано при проведении траншеи на борту карьера. Цель изобретени  - снижение объема срабатываемых пород при строительстве траншеи путем уменьшени  ее основани  за счет исключени  из основани  полосы под мон- тажно-транспортные работы при снижении потерь полезного ископаемого под траншеей . Определ ют контур траншеи на конечном борту карьера, формируют на каждом горизонте в уступе ниши, срабатывают породу уступов в контурах траншеи в ниши, планируют насыпи до совпадени  с профилем траншеи и формируют на них транспортные коммуникации. 1 з.п. ф-лы, 6 ил.The invention can be used when conducting a trench on board the quarry. The purpose of the invention is to reduce the volume of rock produced during the construction of a trench by reducing its base by eliminating the strip for assembly and transport work from the base while reducing mineral loss under the trench. The trench contour is determined on the final side of the pit, a niche is formed on each horizon, a rock of the ledge in the trench contours in the niches is triggered, mounds are planned to coincide with the trench profile and transport communications are formed on them. 1 hp f-ly, 6 ill.

Description

Изобретение относитс  к горной промышленности , в частности к способам строительства транспортных галерей на скальных бортах глубоких карьеров.The invention relates to the mining industry, in particular to methods for constructing transport galleries on rocky sides of deep quarries.

Известен способ строительства транспортной галереи на скальном борту карьера, включающий формирование ступенчатой полутраншеи и проходку выемок- ниш на конечном борту карьера, срабатывание ступеней и отсыпку горной массы в ниши соответствующего нижеследующего горизонта с последующей ее планировкой и формированием монтажно- транспортной коммуникации.There is a known method of building a transport gallery on a rocky side of a quarry, which includes the formation of a stepped half-trench and the excavation of excavations on the final side of the quarry, the actuation of steps and the dumping of rock mass in the corresponding below horizon with its subsequent planning and the formation of assembly-transport communication.

Така  совокупность операций обеспечивает возможность строительства транспортной галереи на скальном борту глубоких карьеров, но при этом возникает необходимость оставл ть насыпи пород под монтажно-транспортные коммуникации а основании крутой полутраншеи в частности в выемках-нишах, пройденных на конечномSuch a set of operations provides the possibility of building a transport gallery on a rocky board of deep quarries, but at the same time there is a need to leave embankments of rocks for assembly and transport communications on the basis of the steep half-carriage, in particular, in the recesses of the niches covered at the end

борту карьера, под которые требуетс  выемка значительного обьема вскрыши.board of the quarry, for which a significant amount of overburden is required.

Известен другой способ проведени  крутой траншеи, включающий определение контура траншеи на конечном борту карьера , формирование ниш на каждом горизонте , срабатывание пород уступов в контурах траншеи в ниши, планировку насыпей до совпадени  с профилем траншеи и формирование транспортных коммуникаций,There is another method of carrying out a steep trench, including determining the contour of a trench on the final side of the quarry, forming niches on each horizon, triggering rock rocks in the contours of the trench in the niches, planning embankments to coincide with the profile of the trench and forming transport communications,

Формирование транспортных коммуникаций на трассе, сформированной на спланированных согласно профилю траншеи пород в нишах, обеспечивает возможность строительства транспортной галереи на основании траншеи, однако и в этом случае объемы срабатываемых пород при строительстве траншеи будут весьма велики, так как ширина ее основани  с учетом полосы под монтажно-транспортные работы будет излишне большой, что повлечет за собой потери полезного ископаемого под траншеей .The formation of transport communications on the highway, formed on the trench rocks planned in the niches, makes it possible to build a transport gallery on the basis of the trench, however, in this case, the volumes of the rocks produced during the construction of the trench will be very large, since the width of its base taking into account the installation strip -transport work will be unnecessarily large, which would entail the loss of mineral under the trench.

.pfsxzetl VKMCW.pfsxzetl VKMCW

Целью изобретени   вл етс  снижение объема срабатываемых пород при строительстве траншеи путем уменьшени  ее основани  за счет исключени  из основани  полосы под монтажно-транспортные работы при снижении потерь полезного ископаемого под траншеей.The aim of the invention is to reduce the volume of rocks produced during the construction of a trench by reducing its base by eliminating the strip from the base for installation and transport work while reducing the loss of mineral under the trench.

Указанна  цель достигаетс  тем, что согласно способу проведени  крутой траншеи , включающему определение контура траншеи на конечном борту карьера, формирование ниш на каждом горизонте, срабатывание пород уступов в контурах траншеи в ниши, планировку насыпей до совпадени  с профилем траншеи, формирование транспортных коммуникаций, отсыпают насыпи пород на каждом горизонте, примыкают указанные насыпи к контуру траншеи, ниши формируют в этих насып х, а после планировки пород указанных насыпей с них ведут формирование транспортных коммуникаций, причем с целью снижени  потерь полезного ископаемого под траншеей после формировани  транспортных коммуникаций срабатывают породу насыпей.This goal is achieved by the method of making a steep trench, including determining the trench contour on the final side of the quarry, forming niches on each horizon, triggering rocks in the trench contours in niches, planning embankments to match the profile of the trench, forming transport communications, pouring embankments rocks on each horizon, these embankments adjoin the trench contour, niches are formed in these embankments, and after planning the rocks of the specified embankments from them, munikatsy, wherein in order to reduce losses of minerals under the trench after forming the transport communications triggered rock embankment.

Применение изобретени  дл  строительства транспортных галерей,в частности с крутонаклонными конвейерными подъемниками на погашенных скальных бортах карьеров, обеспечивает снижение объемов вскрышных работ и уменьшение потерь полезного ископаемого под траншеей, так как ее основание будет значительно меньше по ширине по сравнению с традиционными способами строительства,The use of the invention for the construction of transport galleries, in particular with steeply inclined conveyor lifts on quenched rock walls of quarries, provides a reduction in the volume of overburden operations and a reduction in mineral loss under the trench, since its base will be much smaller in width compared to traditional construction methods,

На фиг, 1 показана ступенчата  полутранше  на конечном борту карьера; на фиг. 2 - формирование ниш; на фиг. 3 - отсыпка горной массы в ниши, ее планировка и формирование монтажно-транспортной коммуникации; на фиг. 4 - строительство транспортной галереи; на фиг. 5 - срабатывание временных насыпей; на фиг. 6 - транспортна  галере  в крутой полутраншее на конечном скальном борту карьера.Fig, 1 shows the half-step level on the final side of the pit; in fig. 2 - formation of niches; in fig. 3 - dumping of rock mass in a niche, its planning and the formation of assembly and transport communication; in fig. 4 - construction of a transport gallery; in fig. 5 - operation of temporary embankments; in fig. 6 - transport galleries to the steep half-trench on the final rocky board of the quarry.

Способ включает следующие операции: формирование на конечном скальном борту 1 карьера ступенчатой полутраншеи 2; формирование от рабочего борта 3 карьера до ступенчатой полутраншеи 2 из взорванной горной массы соответствующих вышележащих горизонтов по уступам конечного скального борта 1 карьера временных насыпей 4 с оставлением на каждом горизонте между ступен ми полутраншеи 2 и насып ми 4 незаполненных ниш 5; срабатывание экскаватором 6 ступеней полутраншеи 2 и отсыпку горной массы 7 в ниши 5 соответствующего нижележащего горизонта; планировку бульдозером 8 горной массы 7 в нишах 5 с формированием на ней монтажно-транспортной коммуникации 9; строительство с монтажно-транспортнойThe method includes the following operations: the formation on the final rocky board 1 of the pit of the stepped half-trench 2; the formation from the working side 3 of the pit to the stepped half-trench 2 of the blasted rock mass of the corresponding overlying horizons along the ledges of the final rocky board 1 of the quarry of temporary embankments 4, leaving at each horizon between the steps of the half-trench 2 and mounds 4 unfilled niches 5; the operation by the excavator of 6 steps of the half-trench 2 and the dumping of rock mass 7 in the niche 5 of the corresponding underlying horizon; planning by the bulldozer 8 of rock mass 7 in niches 5 with the formation of assembly and transport communication 9 on it; construction with assembly and transport

коммуникации 9 в полутраншее 2 транспортной галереи 10; срабатывание временных насыпей 4 вместе с монтажно-транспортной коммуникацией 9 одновременно с погашением рабочего борта 3 карьера.communication 9 in the half-past 2 transport gallery 10; the operation of temporary embankments 4 together with the assembly and transport communication 9 simultaneously with the redemption of the working board 3 of the pit.

0 Способ заключаетс  в следующем.0 The method is as follows.

По мере погашени  рабоч/ix уступов на конечном скальное зрту карьера формируют ступенчатую полутраншею 2; от рабочего борта 3 карьера по ступенчатой полутран5 шее 2 на взорванной горной массе соответствующих вышележащих горизонтов по уступам конечного скального борта 1 карьера формируют временные насыпи 4 с оставлением на каждом горизонте междуAs the working / ix ledges on the final rocky zrta of the open-pit mine are formed, they form a stepped half trench 2; from the working side of the 3 quarry along the stepwise half-torn 5 neck 2, on the blasted rock mass of the corresponding overlying horizons, along the ledges of the final rock face 1 of the quarry, temporary mounds 4 are formed leaving at each horizon between

0 ступен ми полутраншеи 2 и насып ми 4 незаполненных ниш 5; экскаватором 6 сраба- тывают ступени полутраншеи 2 и отсыпают массу 7 в ниши 5 соответствующего нижележащего горизонта; бульдозе5 ром 8 планируют горную массу 7 в нишах 5 с формированием на ней монтажно- транспортной коммуникации 9; с монтажно-транспортной коммуникации 9 в полутраншее 2 осуществл ют строительст0 во транспортной галереи 10; после планировки горной массы 7, отсыпанной в ниши 5, и окончани  строительства галереи 10 временные насыпи 4 вместе с мон- тажно-транспорткс Я коммуникацией 90 steps half of the trenches 2 and mounds 4 empty niches 5; with the excavator 6, the half-tier 2 stages work and pour the mass 7 into the niches 5 of the corresponding underlying horizon; Bulldoze 5, plan for mountain mass 7 in niches 5 with the formation of an assembly and transport communication 9 on it; from the assembly and transport communication 9 to the half-past 2, they are constructing a transport gallery 10; after the planning of the rock mass 7, poured into niche 5, and the completion of the construction of the gallery 10 temporary mounds 4 together with the montage transport trucks I communication 9

5 срабатывают одновременно с погашением рабочего борта 3 карьера.5 work simultaneously with the redemption of the working board 3 career.

Формирование ниш путем отсыпки временных насыпей из взорванной горной массы соответствующих вышележащихThe formation of niches by dumping temporary mounds from the blasted rock mass corresponding to the overlying

0 горизонтов позвол ет избежать выемки дополнительного объема вскрыши от проходки ниш в уступах конечного борта карьера. Срабатывание временных насыпей вместе с монтажно-транспортной коммуника5 цией после планировки горной массы, отсыпанной в ниши, и окончани  строительства галереи уменьшает ширину основани  полутраншеи на конечном скальном борту карьера на ширину монтажно-транспорт0 ной коммуникации примерно в три раза. В этом случае под полутраншею с транспортной галереей практически не требуетс  дополнительный разнос конечного борта карьера и, соответственно, выемка допол5 нительного объема вскрыши при одном и том же объеме добычи полезного ископаемого , Это сокращает затраты на разработку и отвалообразование вскрыши. Сокращаемые объем вскрыши и затраты на его разра- ботку и отвалообразование значительно0 horizons avoids the extraction of additional overburden volume from the niche penetration in the ledges of the pit end wall. The operation of temporary embankments together with the assembly and transport communication after the planning of rock mass in a niche, and the completion of the construction of the gallery reduces the width of the base of the half trench on the final rock wall of the quarry by about the width of the assembly and transport communication about three times. In this case, under the half-trench with the transport gallery, there is practically no need for additional separation of the pit end and, accordingly, excavation of the additional overburden volume with the same mineral production volume. This reduces the development and dumping costs of the overburden. The reduced overburden volume and the cost of its development and dumping are significantly

превышают объем временных насыпей из взорванной горной массы и затраты на их создание и срабатывание.exceed the volume of temporary mounds from the exploded rock mass and the costs of their creation and operation.

Claims (2)

Формула изобретени  1. Способ проведени  крутой траншеи, включающий определение контура траншеи на конечном борту карьера, формирование ниш на каждом горизонте, срабатывание пород уступов в контурах траншеи в ниши, планировку насыпей до совпадени  с профилем траншеи, формирование транспортных коммуникаций, отличающийс  тем, что, с целью снижени  объема срабатываемых пород при строительстве траншеиClaim 1. Method for carrying out a steep trench, including defining the trench contour on the final side of the quarry, forming niches on each horizon, triggering rocks in the trench contours in the niches, planning the embankments to match the profile of the trench, forming transport links, characterized in that in order to reduce the volume of rocks produced during the construction of the trench 5five путем уменьшени  ее основани  за счет исключени  из основани  полосы под монтаж- но-транспортные работы при снижении потерь полезного ископаемого под траншеей , отсыпают насыпи пород на каждом горизонте, примыкают указанные насыпи к контуру траншеи, ниши формируют в этих насып х, а после планировки пород указанных насыпей с них ведут формирование транспортных коммуникацийby reducing its base by eliminating the strip from the base for installation and transport operations while reducing mineral losses under the trench, pouring mounds of rocks on each horizon is poured, the said embankments adjoin the trench contour, niches are formed in these mounds. These embankments from them are the formation of transport 2. Способ по п.1, отличающийс  тем, что, с целью снижени  потерь полезного ископаемого под траншеей, после форми- ровани  транспортных коммуникаций срабатывают породу насыпей.2. The method according to claim 1, characterized in that, in order to reduce the loss of minerals under the trench, after the formation of transport communications, a rock mass is activated. 77 // 22 Фиг./Fig. / гg ii -J-J елate -co-co соwith N5N5 оabout / Ю 2 9 if/ U 2 9 if Фиг. 5FIG. five 1 Ю 2/1 Yu 2 / Фаг. 6Phage. 6 М$ЩШ УН У1M $ SCHSH UN Y1 з /H /
SU904776026A 1990-01-03 1990-01-03 Method of excavating steep trench SU1758226A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU904776026A SU1758226A1 (en) 1990-01-03 1990-01-03 Method of excavating steep trench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU904776026A SU1758226A1 (en) 1990-01-03 1990-01-03 Method of excavating steep trench

Publications (1)

Publication Number Publication Date
SU1758226A1 true SU1758226A1 (en) 1992-08-30

Family

ID=21488271

Family Applications (1)

Application Number Title Priority Date Filing Date
SU904776026A SU1758226A1 (en) 1990-01-03 1990-01-03 Method of excavating steep trench

Country Status (1)

Country Link
SU (1) SU1758226A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 706530, кл. Е 21 С 41 /00, 1978. Авторское свидетельство СССР №875039, кл. Е21 С 41/00, 1979. *

Similar Documents

Publication Publication Date Title
RU2348808C2 (en) Method of preparing bottom of block
RU2652234C1 (en) Method of open development of inclined deposits with the use of spoil banks
SU1758226A1 (en) Method of excavating steep trench
RU2013550C1 (en) Method for open-pit mining of steeply dipping mineral deposits
SU1735585A1 (en) Open-pit mining method for steep and inclined deposits
RU2700855C1 (en) Method for formation of external dump overburden during trenching
SU1323716A1 (en) Method of remining mineral deposits
SU1033741A1 (en) Method of open-cast mining of steep deposits
RU2139429C1 (en) Method for opencast mining of flat and sloping deposits of minerals
RU2715503C1 (en) Method for open-underground development of flat-lying formations
RU2290510C1 (en) Open underground method for extracting formations of mineral resources
SU1262035A1 (en) Method of mining steep deposits
SU1285151A1 (en) Method of strip mining of minerals
SU1458574A1 (en) Method of mining ore bodies
RU2651833C1 (en) Method of open-underground development of coal bed, lying in the form of brachysyncline
SU1638305A1 (en) Method of driving steep inclines
SU985289A1 (en) Method of open-cast mining of gently sloping and sloping mineral deposit
RU2215148C2 (en) Method of opencast mining of permafrost placer deposits with internal dump formation
SU1263855A1 (en) Method of mining mineral deposits
RU2101502C1 (en) Method of formation of haulage ramp
SU1125373A1 (en) Method of mining unstable ores
SU1765399A1 (en) Open cast mining method
SU1700236A1 (en) Method of combined development scheme for mineral deposits
RU2213224C1 (en) Method of opencast mining of mineral deposits
RU2016196C1 (en) Combined method for opencast mining of narrow stretching out horizontal and slightly inclined mineral deposits