SU1728114A1 - Inclined hoist - Google Patents

Inclined hoist Download PDF

Info

Publication number
SU1728114A1
SU1728114A1 SU894701209A SU4701209A SU1728114A1 SU 1728114 A1 SU1728114 A1 SU 1728114A1 SU 894701209 A SU894701209 A SU 894701209A SU 4701209 A SU4701209 A SU 4701209A SU 1728114 A1 SU1728114 A1 SU 1728114A1
Authority
SU
USSR - Soviet Union
Prior art keywords
vessels
vessel
mass
friction
pulleys
Prior art date
Application number
SU894701209A
Other languages
Russian (ru)
Inventor
Владислав Георгиевич Морозов
Original Assignee
Всесоюзный Научно-Исследовательский Институт Горной Механики Им.М.М.Федорова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Научно-Исследовательский Институт Горной Механики Им.М.М.Федорова filed Critical Всесоюзный Научно-Исследовательский Институт Горной Механики Им.М.М.Федорова
Priority to SU894701209A priority Critical patent/SU1728114A1/en
Application granted granted Critical
Publication of SU1728114A1 publication Critical patent/SU1728114A1/en

Links

Landscapes

  • Control And Safety Of Cranes (AREA)

Description

Устройство работает следующим образом .The device works as follows.

На краю карьера или около усть  наклонного ствола устанавливаетс  опора 16 дл  копровых отклон ющих шкивов 4. В наземном исполнении (с учетом углов девиации канатов) размещаетс  машина барабанного типа с винтовой нарезкой ручьев под один или. несколько головных канатов 2, навиваемых на обечайку с расчетным числом подвижных витков трени . По уклону ствола либо склону карьера до его нижнего горизонта монтируетс  рельсовый путь 8 дл  сосудов 5 и 7. Ветви головных канатов через копровые шкивы соедин ютс  с сосудами 5 и 7. Хвостовой канат 12 через дополнительный отклон ющий шкив 13 делает систему канат-сосуд замкнутой. При вращении барабана 1 витки трени  перемещаютс  по винтовой поверхности от одной реборды к другой, при этом соответственно порожний сосуд опускаетс  вниз, а груженый поднимаетс  вверх.At the edge of the pit or near the mouth of an inclined shaft, a support 16 is installed for pile driving deflecting pulleys 4. In the ground version (taking into account the deviation angles of the ropes), a drum-type machine is placed with a screw thread of the streams under one or. several head ropes 2, wound on the side with a calculated number of moving turns of friction. The trunk track 8 for vessels 5 and 7 is mounted along the trunk slope or pit slope to its lower horizon. The branches of the head ropes are connected to vessels 5 and 7 through scraper pulleys. Tail rope 12 through the additional deflecting pulley 13 makes the rope-vessel system closed. When the drum 1 is rotated, the friction turns move along a helical surface from one flange to another, while the empty vessel accordingly goes down and the loaded vessel rises up.

Цикл подъема завершаетс  разгрузкой одного сосуда в верхнем положении и загрузкой другого на нижнем горизонте карьера соответственно в месте 11 разгрузки и 10 загрузки. В процессе перемещени  груженого скипа вверх порожний под действием собственного веса и принудительно хвостовым канатом опускаетс  вниз. После этапа разгрузки-загрузки сосудов цикл повтор етс . В случае предохранительного торможени  набегани  груженого или порожнего сосуда на канат не происходит, т.к. дополнительный отклон ющий шкив обеспечивает синхронное перемещение ветвей канатов,The lifting cycle is completed by unloading one vessel in the upper position and loading another in the lower horizon of the quarry, respectively, at the place of 11 unloading and 10 loading. In the process of moving the loaded skip up empty under the action of its own weight and forcibly tails down to the bottom. After the vessel unloading and loading phase, the cycle is repeated. In the event of a safety braking, a loaded or empty vessel rushing onto the rope does not occur, since an additional diverting pulley ensures synchronous movement of the branches of the ropes,

Каждый головной канат охватывает барабан посто нным числом витков трени , определ емым выражением:Each head rope covers the drum with a constant number of friction turns defined by the expression:

m m

0,16 0.16

1 +0о +1 + 0o +

InIn

«1 Ki к"1 Ki to

1 +1 +

«2К.2 К"2K.2 K

+ 0,5 + 0.5

где m - коэффициент запаса на непроскальзывание каната;where m is the safety factor for non-slip rope;

fi - коэффициент трени  между канатом и барабаном;fi is the coefficient of friction between the rope and the drum;

Ki,K2 - число соответственно головных и хвостовых канатов;Ki, K2 - the number of head and tail ropes respectively;

«о - отношение массы груза к массе сосуда;“O is the ratio of the mass of the cargo to the mass of the vessel;

а, (Xi - отношение масс соответственно головного и хвостового канатов к массе сосуда;a, (Xi is the mass ratio of the head and tail ropes, respectively, to the mass of the vessel;

к- параметр АС sl.nTa + fcos ct,k- AC parameter sl.nTa + fcos ct,

где а - угол наклона проводников к горизонту;where a is the angle of conductors to the horizon;

5f - коэффициент трени  между сосудом5f - coefficient of friction between the vessel

и проводником.and conductor.

Claims (3)

1. Наклонна  подъемна  установка, содержаща  охватывающую копровые отклон ющие шкивы и приводной барабан со спиральными канавками гибкую св зь, на концах которой подвешены подъемные сосуды , отличающа с  тем, что, с целью повышени  надёжности и производительности , она снабжена дополнительным отклон ющим шкивом, ось которого размещена в стволе в плоскости трассы движени  сосудов, и огибающим его хвостовым канатом, концы которого соединены с сосудами , при этом, число витков трени  гибкой св зи, охватывающей приводной барабан, определ етс  выражением:1. Inclined lifting installation, comprising a flexible connection covering the scraper deflecting pulleys and a driving drum with spiral grooves, at the ends of which lifting vessels are suspended, in order to increase reliability and performance, it is equipped with an additional deflecting pulley axis which is located in the trunk in the plane of the route of the vessels, and around its tail cable, the ends of which are connected to the vessels, and the number of turns of the flexible coupling friction, covering the driving drum, with the expression: m  m 0.16 /гК10.16 / gK1 1 +OQ +1 + OQ + InIn ctiKi кctiKi to 1 +1 + 02 К202 K2 + 0,5 ,+ 0.5, 5five 00 5five 00 5five где m - коэффициент запаса на непроскальзывание каната;where m is the safety factor for non-slip rope; fi - коэффициент трени  между канатом и барабаном:fi is the coefficient of friction between the rope and the drum: Кт.Ка - число соответственно головных и хвостовых канатов;Kt.Ka - the number, respectively, of the head and tail ropes; «о - отношение массы груза к массе сосуда;“O is the ratio of the mass of the cargo to the mass of the vessel; . czi, оа - отношение масс соответственно головного и хвостового канатов к массе сосуда;. czi, oa is the mass ratio of the head and tail ropes, respectively, to the mass of the vessel; к - параметр к - + fcos.V, где а - угол наклона проводников к горизонту;k is the parameter k - + fcos.V, where a is the angle of inclination of the conductors to the horizon; f - коэффициент трени  между сосудом и проводником.f is the coefficient of friction between the vessel and the conductor. 2.Установка по п.1, отличающа - с   тем, что осевые линии отклон ющего и копровых шкивов выполнены скрещивающимис  и ортогональными, при этом копровые шкивы размещены соосно.2. The apparatus according to claim 1, characterized in that the axial lines of the deflecting and scraper pulleys are made crossing and orthogonal, while the scraper pulleys are placed coaxially. 3.Установка по пп.1 и 2, отличающа с  тем, что диаметр дополнительного отклон ющего шкива равен рассто нию между продольными геометрическими ос ми обоих сосудов.3. Installation according to claims 1 and 2, characterized in that the diameter of the additional deflecting pulley is equal to the distance between the longitudinal geometrical axes of both vessels. Фиг./Fig. / /5 /five
SU894701209A 1989-06-05 1989-06-05 Inclined hoist SU1728114A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894701209A SU1728114A1 (en) 1989-06-05 1989-06-05 Inclined hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894701209A SU1728114A1 (en) 1989-06-05 1989-06-05 Inclined hoist

Publications (1)

Publication Number Publication Date
SU1728114A1 true SU1728114A1 (en) 1992-04-23

Family

ID=21452265

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894701209A SU1728114A1 (en) 1989-06-05 1989-06-05 Inclined hoist

Country Status (1)

Country Link
SU (1) SU1728114A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2500890C2 (en) * 2012-03-11 2013-12-10 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Inclined hoisting unit
RU2537930C1 (en) * 2013-10-17 2015-01-10 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Пермский национальный исследовательский политехнический университет" Inclined hoisting unit
CN104477662A (en) * 2014-11-28 2015-04-01 兖州煤业股份有限公司 Raker and ground beam thereof
CN106744423A (en) * 2017-02-14 2017-05-31 成都伯泰科技有限公司 A kind of hoist system
RU186195U1 (en) * 2017-06-21 2019-01-11 Федеральное государственное бюджетное образовательное учреждение высшего образования "Магнитогорский государственный технический университет им.Г.И. Носова" Quarry lifting device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2500890C2 (en) * 2012-03-11 2013-12-10 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Inclined hoisting unit
RU2537930C1 (en) * 2013-10-17 2015-01-10 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Пермский национальный исследовательский политехнический университет" Inclined hoisting unit
CN104477662A (en) * 2014-11-28 2015-04-01 兖州煤业股份有限公司 Raker and ground beam thereof
CN106744423A (en) * 2017-02-14 2017-05-31 成都伯泰科技有限公司 A kind of hoist system
RU186195U1 (en) * 2017-06-21 2019-01-11 Федеральное государственное бюджетное образовательное учреждение высшего образования "Магнитогорский государственный технический университет им.Г.И. Носова" Quarry lifting device

Similar Documents

Publication Publication Date Title
SU1728114A1 (en) Inclined hoist
US4015798A (en) Fleet angle system and method of level winding
US3912228A (en) Integrated chain-wire rope mooring system
GB2183581A (en) Single line mooring system
CN107473121B (en) Seabed spreads cable winch
US3347526A (en) Guide for faired cable
US4577810A (en) Feed device for guiding a rope onto a winding drum
IL41555A (en) Apparatus for launching,towing and recovering a submersible body from a vessel
CN208602638U (en) A kind of ROV draw off gear based on binary lash ship
US4949660A (en) Sail winder control systems
RU2135385C1 (en) Device for handling elongated flexible member
US4921182A (en) Machine for winding cable
SU1366471A1 (en) Mine hoisting unit
SU1114607A1 (en) Multiple-rope mining hoist
US4181291A (en) Apparatus for supporting and controlling the grabbing device of hoisting gear
KR820001458B1 (en) Single boom turn-tree derrick system
CN212503743U (en) High-bearing-capacity electric horizontal ship winch
RU2048417C1 (en) Shaft hoisting plant
SU1749147A1 (en) Hoist
SU1505876A1 (en) Multirope hoisting engine
RU1775347C (en) Mine hoist
SU624856A1 (en) Hoist
RU1794846C (en) Cable hoist
KR890006838Y1 (en) Gondola cage with rope drum and driving device
CN2287620Y (en) Electric rotary log grab