SU1677173A1 - Method for construction of buried water-intake structure - Google Patents
Method for construction of buried water-intake structure Download PDFInfo
- Publication number
- SU1677173A1 SU1677173A1 SU894741050A SU4741050A SU1677173A1 SU 1677173 A1 SU1677173 A1 SU 1677173A1 SU 894741050 A SU894741050 A SU 894741050A SU 4741050 A SU4741050 A SU 4741050A SU 1677173 A1 SU1677173 A1 SU 1677173A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- trench
- pipeline
- chamber
- dam
- transverse
- Prior art date
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
Изобретение относ ге к гидротехническому строительству. Ш ;- изобретем.i« -- снижение затрат и сокращение сроков строительства . В грунтовой массив 1 гогружа- ют заглубленную оболочку 2 и производ т откопку траншеи под защитой тиксотропного раствора 4. У береговой перемычки 5 производ т откопку поперечной захватки 6 на глубину траншеи. Затем в траншею укладывают трубопровод 7, после чего в крайней части траншеи между береговой перемычкой 5 и поперечной захваткой создают камеру 8 путем образовани грунтовой дамбы 9 в области поперечной захватки. Тиксотроп- ный раствор 4 перепускают через грунтовую дамбу 9 по направлению из камеры 8 в траншею по трубопроводам 10, 11 до коль- матации пор в грунтовой дамбе 9. 3 ил. ЈThe invention relates to hydraulic engineering. W; - invent.i “- reducing costs and reducing construction time. A submerged shell 2 is buried in the soil mass 1 and the trench is excavated under the protection of the thixotropic solution 4. At the coastal bridge 5, the transverse gripper 6 is excavated to the depth of the trench. A pipeline 7 is then laid in the trench, after which, in the extreme part of the trench between the shore bridge 5 and the transverse gripper, a chamber 8 is created by forming an earth dam 9 in the transverse gripping region. The thixotropic solution 4 is passed through the soil dam 9 in the direction from chamber 8 to the trench via pipelines 10, 11 until the pores in the soil dam 9 collate. 3 Il. J
Description
(Л(L
сwith
48 10 12 1148 10 12 11
19nineteen
О 1 1About 1 1
GOGO
Изобретение относитс к гидротехническому строительству и касаетс возведени водоподвод щих сооружений.FIELD OF THE INVENTION The invention relates to hydraulic construction and relates to the construction of a water supply structure.
Цель изобретени - снижение затрат и сокращение сроков строительства сооруже- ни The purpose of the invention is to reduce costs and reduce construction time
На фиг. 1 изображено заглубленное водозаборное сооружение после откопки поперечной захватки, вид в плане; на фиг. 2 - то же, в момент перепуска через дамбу тиксотропного раствора, продольный разрез; на фиг. 3 - то же, в момент продавли- вани трубопровода сквозь береговую перемычку , продольный разрез.FIG. 1 shows a buried intake structure after digging out a transverse gripper, plan view; in fig. 2 - the same, at the moment of a bypass through the dix of a thixotropic solution, a longitudinal section; in fig. 3 - the same, at the moment of pipeline pushing through the shore bridge, longitudinal section.
Способ строительства заглубленного водозаборного сооружени согласно изобретению реализуют следующим образом.The construction method of the buried intake structure according to the invention is implemented as follows.
Известным способом погружают в грунтовый массив 1 заглубленную оболочку 2 и производ т откопку траншеи 3 под защитой тиксотропного раствора 4. У береговой перемычки 5 производ т откопку по- перечной захватки 6 на глубину траншеи 3. Затем в траншею 3 укладывают трубопровод 7, после чего в крайней части траншеи 3 между береговой перемычкой 5 и поперечной захваткой 6 создают камеру In a known manner, the submerged shell 2 is immersed in the soil mass 1 and the trench 3 is excavated under the protection of the thixotropic solution 4. At the coastal jumper 5, a cross-grab 6 is excavated to the depth of the trench 3. Then the pipeline 7 is laid in the trench 3, then the extreme part of the trench 3 between the coastal lintel 5 and transverse capture 6 create a chamber
8путем образовани грунтовой дамбы 9 в области поперечной захватки 6. Наличие поперечной захватки 6 гарантирует сплошность грунтовой дамбы 9 Тиксотропный раствор 4 перепускают через грунтовую дамбу8 through the formation of a soil dam 9 in the transverse nip 6. The presence of the transverse nipple 6 ensures the integrity of the dirt dam 9 Thixotropic solution 4 is passed through the unpaved dam
9по направлению из камеры 8 в траншею 3 по трубопроводам 10, 11 с помощью насоса 12 до кольматации пор в грунтовой дамбе 9.. По достижении кольматации в камере 8 производ т замещение тиксотропного раствора 4 водой 13, подаваемой из водоема 14 по трубопроводам 15, 16 с помощью насоса 17. При этом создают превышение уровн воды 13 в камере 8 над уровнем тиксотропного раствора 4 в траншее 3, дл чего вокруг камеры 8 устраивают грунтовую подсыпку 18. Дл обеспечени дав- лени со стороны воды 13 в камере 8, превышающего давление со стороны тиксотропного раствора 4 в траншее 3, соблюдают соотношение9 along the direction from chamber 8 to trench 3 via pipelines 10, 11 using a pump 12 until the pores in the earth dam 9 are clogged. Upon reaching the mudding in chamber 8, the thixotropic solution 4 is replaced by water 13 supplied from the reservoir 14 through pipelines 15, 16 using a pump 17. At the same time, water level 13 in chamber 8 is created above the level of thixotropic solution 4 in trench 3, for which a ground bed 18 is arranged around chamber 8. To ensure pressure from water 13 in chamber 8, exceeding pressure with side thixotropic solution 4 in trench 3, keep the ratio
Я|-ув Я2-т ,I | -uv2,
где Н - высота сло воды 13 в камере 8 м; 7В - плотность воды, кг/м3; //2 - высота сло тиксотропного раствора 4 в траншее 3, м; уг - плотность тиксотропного раствора, кг/м3.where H is the height of the water layer 13 in the chamber 8 m; 7В - density of water, kg / m3; // 2 - the height of the layer of thixotropic solution 4 in trench 3, m; yr - density of thixotropic solution, kg / m3.
После этого приступают к принудительному продавливанию трубопровода 7 сквозь береговую перемычку 5 из внутренней полости заглубленной оболочки 2 с помощью домкрата 19, причем это продавливание осуществл ют циклами, наращива после каждого цикла трубопровод 7 элементами 20. После вывода трубопровода 7 в водоем 14 производ т обратную засыпку траншеи 3.After that, the pipeline 7 is forced to be pushed through the coastal bridge 5 from the internal cavity of the buried shell 2 with the help of a jack 19, and this pushing is carried out in cycles, the pipeline 7 is increased after each cycle by the elements 20. After the pipeline 7 is brought back to the reservoir 14, backfilling is performed trench 3.
Примером использовани изобретени может служить строительство заглубленного водозаборного сооружени при следующих характеристиках объекта: глубина траншеи 6-8 м; ширина траншеи 0,6 м; длина траншеи 50 м; диаметр трубопровода 400 мм; ширина береговой перемычки 6 м; ширина поперечной захватки 2,5 м; длина камеры 4 мAn example of the use of the invention is the construction of a buried intake structure with the following object characteristics: trench depth 6–8 m; trench width 0.6 m; trench length 50 m; diameter of the pipeline is 400 mm; coast lintel width 6 m; transverse width 2.5 m; chamber length 4 m
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894741050A SU1677173A1 (en) | 1989-09-27 | 1989-09-27 | Method for construction of buried water-intake structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894741050A SU1677173A1 (en) | 1989-09-27 | 1989-09-27 | Method for construction of buried water-intake structure |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1677173A1 true SU1677173A1 (en) | 1991-09-15 |
Family
ID=21471508
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU894741050A SU1677173A1 (en) | 1989-09-27 | 1989-09-27 | Method for construction of buried water-intake structure |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1677173A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7942609B2 (en) | 2006-04-28 | 2011-05-17 | Herrenknecht Ag | Method and device for trenchless pipe laying |
-
1989
- 1989-09-27 SU SU894741050A patent/SU1677173A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 1546552, кл. Е 02 В 9/02, 1988. Авторское свидетельство СССР № 1382907, кл. Е 02 В 9/02, 1986. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7942609B2 (en) | 2006-04-28 | 2011-05-17 | Herrenknecht Ag | Method and device for trenchless pipe laying |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4820080A (en) | Process for the construction of a drain system | |
US4326818A (en) | Techniques for the storage of water | |
CN110735468A (en) | underground water cross-flow supply recharging system combined with irrigation channels and irrigation wells | |
SU1677173A1 (en) | Method for construction of buried water-intake structure | |
JPH11229450A (en) | Water reservation method | |
JPS63293224A (en) | Groundwater draining work | |
SU1442605A1 (en) | Drainage arrangement | |
SU1002453A1 (en) | Drain construction method | |
SU1458481A1 (en) | Method of constructing canal in uncohesive soil | |
SU1049662A1 (en) | Method of internal dumping of water-saturated rock | |
SU1717711A1 (en) | Embankment erecting method | |
JP2810969B2 (en) | Structure of osmotic intake and construction method | |
SU1579949A1 (en) | Method of building drainage | |
RU2018578C1 (en) | Method for laying deep-seated horizontal drainage systems | |
CN1542233A (en) | Bonstay and blind drain salt-alkali discharging method | |
SU821647A1 (en) | Method of constructing horizontal closed drain system | |
SU1392212A1 (en) | Soil intake of suction dredger | |
SU1465485A1 (en) | Method of constructing drainage | |
SU1651004A1 (en) | Method of laying subsurface pipelines | |
JPS59106611A (en) | Laying work of water sealing sheet | |
SU1331951A1 (en) | Method of constructing enclosed horizontal drainage system | |
SU1484872A1 (en) | Soil intake arrangement for suction dredger | |
SU1006844A1 (en) | Pipe-line construction method | |
SU924412A2 (en) | Method for filling worked space | |
SU1546552A1 (en) | Method of constructing water intake hydraulic structure |