SU1331951A1 - Method of constructing enclosed horizontal drainage system - Google Patents

Method of constructing enclosed horizontal drainage system Download PDF

Info

Publication number
SU1331951A1
SU1331951A1 SU864009166A SU4009166A SU1331951A1 SU 1331951 A1 SU1331951 A1 SU 1331951A1 SU 864009166 A SU864009166 A SU 864009166A SU 4009166 A SU4009166 A SU 4009166A SU 1331951 A1 SU1331951 A1 SU 1331951A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pipeline
laying
closed
line
drainage
Prior art date
Application number
SU864009166A
Other languages
Russian (ru)
Inventor
Хазраткул Худайбердиев
Original Assignee
X. Худайбердиев .(53)626.86(088.8)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by X. Худайбердиев .(53)626.86(088.8) filed Critical X. Худайбердиев .(53)626.86(088.8)
Priority to SU864009166A priority Critical patent/SU1331951A1/en
Application granted granted Critical
Publication of SU1331951A1 publication Critical patent/SU1331951A1/en

Links

Abstract

Изобретение относитс  к области мелиорации. Цель изобретени  - устранение дополнительного объема земл ных работ и снижение расхода фильтрующего материала. Укладку трубопровода 4 начинают с устьевой части. Одновременно укладывают сразу все три линии дренажного трубопровода 4, засыпа  фильтром 5. По достижении необходимой длины, устанавливаемой проектом согласно уровню грунтовых вод, верхнюю третью линию 7 прекращают укладывать. Дл  предохранени  от за илени  конец трубопровода закрьшают заглушкой. Далее продолжаетс  укладка оставшихс  двух первой 3 и второй 4 линий трубопровода. По достижении требуемой длины обрабатьшают вторую линию 6, конец его так же закрывают заглушкой 9, Оставшуюс  первую линию 3 укладывают до требуемой длины, после чего конец его так же закрывают З аглушкой 9. Применение многослойного способа укладки линии трубопровода обеспечивает необходимую водо- захватную способность на всем прот жении дрены. 3 ил. i (Л ..г.у:; 7:у..у. --/4 . -г-/ -/:-:/. /////////////хГ/////// 2 J if 9 6 S-J АS Фиг.1 00 00 :о ел This invention relates to the field of land reclamation. The purpose of the invention is to eliminate the additional amount of earthworks and reduce the consumption of filter material. Laying the pipeline 4 start from the mouth of the part. At the same time, all three lines of the drainage pipeline 4, backfill by filter 5 are laid at once. Upon reaching the required length, set by the project according to the groundwater level, the upper third line 7 is stopped laying. To protect against sludge, the end of the pipeline is closed with a cap. The laying of the remaining two first 3 and second 4 lines of the pipeline continues. Upon reaching the required length, the second line 6 is processed, its end is also closed with a plug 9, the remaining first line 3 is laid to the required length, after which the end is also closed with an agglume 9. The use of the multilayer method of laying the pipeline ensures the required water-gripping capacity all over the drain. 3 il. i (L. .. y:; 7: y .. y. - / 4. -g- / - /: -: /. /////////// хГ /// //// 2 J if 9 6 SJ AS Fig. 1 00 00: o ate

Description

11eleven

Изобретение относитс  к мелиорации и может быть использовано при строительстве закрытого горизонтального дренажа, The invention relates to land reclamation and can be used in the construction of closed horizontal drainage,

Цель изобретени  - устранение необходимости выполнени  дополнительного объема работ и снижение расхода фильтрующего материала.The purpose of the invention is to eliminate the need for additional work and reduce the consumption of filter material.

На фиг. 1 изображен дренажный тру- ю чего конец его также закрывают забопровод , продольный профиль, на фиг. 2 - сечение А-А на фиг. 1 , на фиг. 3 - сечение. Б-Б на фиг. 1. Способ строительства закрытогоFIG. 1 shows a drainage pipe; its end is also closed by a suction pipe, a longitudinal profile; FIG. 2 is a section A-A in FIG. 1, in FIG. 3 - section. BB in FIG. 1. Method of construction closed

глушкой 9. Применение многослойного способа укладки линии дренажного трубопровода обеспечивает необходимую водозахватную способность на всем горизонтального дренажа включает от- 15 прот жении дрены, одновременно упро- рывку траншеи 1, засыпку подстилающе- ща  технологию укладки и снижение го сло  фильтра (песчано-гравийной затрат на строительство дренажа, меси) 2, укладку первой лин ии 3 дре- Кроме того, многослойна  лини  нажного трубопровода 4, надстилающе- дренажного трубопровода обеспечивает го сло  фильтра 5 и через определен- 20 непрерывную работу дренажа при заи- ный промежуток - укладку второй 6, а лении одной или-двух линий благодар 9. The use of a multilayer method of laying a drainage pipeline line provides the necessary water-holding capacity throughout the horizontal drainage, includes draining the drain, simultaneously trenching 1, backfilling the underlying laying technology and reducing the first layer of the filter (sand and gravel construction of drainage, mixing) 2, laying of the first line and 3 of the drainage; In addition, a multi-layered lined pipeline 4, an overhead drainage pipeline provides the filter layer 5 and through a certain 20 continuous In case of a proper gap, the second drainage work - laying the second 6, and one or two lines

далее и-третьей 7 линий дренажного тр;убопровода 4 и обратную засыпку 8 траншеи 1. Концы уложенных линий дренажного трубопровода 4 закрываютс  заг-ггушкой 9.further and third, 7 drainage lines; tailing 4 and backfilling 8 of the trench 1. The ends of the laid drainage lines of the pipeline 4 are closed with a bottom 9.

Способ осуществл ют следующим образом .The method is carried out as follows.

Укладку трубопровода 4 начинают с устьевой части. Одновременно укладывают сразу.все три линии дренажного трубопровода 4, засыпа  фильтром 5. По достижении необходимой длины, устанавливаемой проектом согласно уровню грунтовых вод, верхнюю третью линию 7 прекращают укладывать. Дл  предохранени  от заилени  конец трубопровода закрывают заглушкой 9. ДаА-АLaying the pipeline 4 start from the mouth of the part. At the same time, all three lines of the drainage pipeline 4, backfill by filter 5 are laid at once. Upon reaching the required length, set by the project according to the groundwater level, the upper third line 7 is stopped to be laid. For silting protection, the end of the pipeline is closed with a plug 9. YesA-A

лее продолжают укладку оставшихс  двух первой 3 и второй 6 линий дренажного трубопровода 4. По достижении требуемой длины обрывают вторую линию 6 трубопровода конец которого также закрывают заглушкой 9. Оставшуюс  первую линию 3 трубопровода укладывают до требуемой длины, послеFurther, the laying of the remaining two first 3 and second 6 lines of the drainage pipe 4 is continued. Upon reaching the required length, the second line 6 of the pipeline is cut off, the end of which is also closed with a plug 9. The remaining first line 3 of the pipeline is laid to the required length, after

действи м хот  бы одной линии.actions at least one line.

Claims (1)

Формула изобретени Invention Formula 5five Способ строительства закрытого горизонтального дренажа, включающий отрывку траншеи, формирование дренажного трубопровода путем укладки трубThe method of construction of a closed horizontal drainage, including the passage of the trench, the formation of the drainage pipeline by laying pipes 0 с увеличивающимс  диаметром к устью и засыпку их фильтрующим материалом, о тлича ющий с   тем, что, с целью устранени  дополнительного объема земл ных работ и снижени  рас- хода фильтрующего материала, дренажный трубопровод формируют путем  русной укладки труб одинакового диаметра , причем количество  русов труб к устью трубопровода увеличивают.0 with an increasing diameter to the mouth and filling them with filtering material, which is different from the fact that, in order to eliminate the additional amount of earthwork and reduce the flow of filtering material, the drainage pipeline is formed by optically laying pipes of the same diameter, and the number of pipes to the mouth of the pipeline increase. 5-Б5 B Фаг. 2Phage. 2 вниипиvniipi Заказ 3775/26 Тираж 606Order 3775/26 Circulation 606 Произв.-полигр. пр-тие, г. Ужгород, ул. Проектна , 4Random polygons pr-tie, Uzhgorod, st. Project, 4 Фиг.ЗFig.Z ПодписноеSubscription
SU864009166A 1986-01-07 1986-01-07 Method of constructing enclosed horizontal drainage system SU1331951A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864009166A SU1331951A1 (en) 1986-01-07 1986-01-07 Method of constructing enclosed horizontal drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864009166A SU1331951A1 (en) 1986-01-07 1986-01-07 Method of constructing enclosed horizontal drainage system

Publications (1)

Publication Number Publication Date
SU1331951A1 true SU1331951A1 (en) 1987-08-23

Family

ID=21216927

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864009166A SU1331951A1 (en) 1986-01-07 1986-01-07 Method of constructing enclosed horizontal drainage system

Country Status (1)

Country Link
SU (1) SU1331951A1 (en)

Similar Documents

Publication Publication Date Title
RU94046359A (en) Method for running underground collectors for liquids and gases and working mean to implement the same
SU1331951A1 (en) Method of constructing enclosed horizontal drainage system
KR940007311A (en) Construction method of slope slope
SU1664964A1 (en) Method for constructing drainage system
SU1802044A1 (en) Drainage system construction method
SU1002453A1 (en) Drain construction method
SU1559044A1 (en) Method of ground drainage
SU881188A1 (en) Trenchless method of plastic drainage construction
Cotton et al. Water supply for Gedaref; are infiltration galleries the answer?
RU1794130C (en) Method of drainage construction in poorly draining soils
RU2247892C2 (en) Method of prevention of cracking corrosion of pipe line under action of stresses (versions)
SU1668548A1 (en) Arena construction method
SU1023024A2 (en) Method of erecting hydraulic fill earth structures
SU1732104A1 (en) Method of laying underground pipelines
SU889784A1 (en) Method of erecting hydraulically filled structures in water ducts
SU1465485A1 (en) Method of constructing drainage
RU2016163C1 (en) Method of underwater formation of silting structure layer
SU1629389A2 (en) Device for draining of industrial sites
SU1291672A1 (en) Method of constructing drainage system
SU1038679A2 (en) Method of laying underground pipeline
Dvoracek et al. Development of Systems for Ground Water Recharge Into the Ogalla Formation.
SU1733571A1 (en) Method of laying drainage pipes in quicksand soil
SU821647A1 (en) Method of constructing horizontal closed drain system
SU1063915A1 (en) Method of constructing a dam of locally avaiable materials
SU1372009A1 (en) Method of constructing enclosed horizontal pipeline