SU1038679A2 - Method of laying underground pipeline - Google Patents

Method of laying underground pipeline Download PDF

Info

Publication number
SU1038679A2
SU1038679A2 SU823436131A SU3436131A SU1038679A2 SU 1038679 A2 SU1038679 A2 SU 1038679A2 SU 823436131 A SU823436131 A SU 823436131A SU 3436131 A SU3436131 A SU 3436131A SU 1038679 A2 SU1038679 A2 SU 1038679A2
Authority
SU
USSR - Soviet Union
Prior art keywords
pipeline
pockets
flexible
ballasting
trench
Prior art date
Application number
SU823436131A
Other languages
Russian (ru)
Inventor
Алексей Михайлович Зиневич
Конкордий Иванович Зайцев
Владимир Петрович Ментюков
Виктор Васильевич Спиридонов
Тимур Хашимович Саттаров
Евгений Павлович Канцидалов
Борис Иванович Даньшин
Original Assignee
Всесоюзный научно-исследовательский институт по строительству магистральных трубопроводов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский институт по строительству магистральных трубопроводов filed Critical Всесоюзный научно-исследовательский институт по строительству магистральных трубопроводов
Priority to SU823436131A priority Critical patent/SU1038679A2/en
Application granted granted Critical
Publication of SU1038679A2 publication Critical patent/SU1038679A2/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water

Abstract

Изобретение относитс  к области строительства магистральных трубопроводов , прокладываемых через обводненные и затапливаемые участки, а также в пучинистых грунтах с использованием гибких полотнищ, несущих грунт балластировки. Целью изобретени   вл етс  повышение надежности балластировки трубопровода на участках с продольным уклоном путем исключени  размыва , и уноса бал астирукщего груита потоками талых и грунтовых вод. Дл  чего гибкие полотнища укладывают с разрывами, а карманы, образованные гибкими полотнищами дл  засыпки бал- ластирующего грунта, отдел ют друг от друга перемычками в виде груитовых эасьток между карманами, либо в виде перегородок, из гибкого синтетического материала, который плотно при- карманов к гибкрепл ют на концах ф-лы, 3 ил. кому полотнищу. 3 3The invention relates to the field of construction of trunk pipelines laid through flooded and flooded areas, as well as in heaving soils using flexible panels that carry ballasting soil. The aim of the invention is to increase the reliability of pipeline ballasting in areas with a longitudinal slope by eliminating scouring and entrainment of asserting gruits by melt and groundwater flows. For this, flexible panels are laid with gaps, and pockets formed by flexible panels for backing up the blasted soil are separated from each other by bridges in the form of groove edges between pockets, or in the form of partitions, of flexible synthetic material that is tightly pocketed. bend at the ends of the f-ly, 3 sludge. to whom the cloth. 3 3

Description

0000

00 Од00 od

ыs

Claims (4)

QD Изобретение относитс  к области строительства, преимущественно магистральных трубопроводов, прокладывае мых через обводненные,.заболоченные и затапливаемые участки, а также в пучинистых грунтах. Целью изобретени   вл етс  повышение надежности балластировки трубо провода на участках с продольным уклоном за счет предотвращени  протека ни  талых и грунтовых вод вдоль труб провода и размыва грунта засыпки. На фиг.1 представлен план уложенного трубопровода без перемычек; на фиг.2 - участок трубопровода с грунтовыми водоупорными перемычками; на фиг.З - то же, с перемычками в виде перегородок из гибкого синтетическог материала. Прокладку подземного трубопровода осуществл ют в следующей последовательности . Производ т отрывку траншеи 1, ук . ладывают на ее дно трубопровод 2, перекрывают бермы, стенки, дно траншеи и трубопровод 2 гибкими полотнищами 3, укладываемыми с разрывами 4. За счет облегани  сопр гаемых поверхностей полотнища 3 образуют карманы, которые отдел ют друг от друга поперечными перемычками 5 дл  предотвращени  протекани  талых и грунтовых вод вдоль трубопровода и разьагаа грунта засыпки, что повьшает надежность балластировки трубопровода 2. Перемычки 5 могут быть выполне ны путем засыпки разрывов 4 между карманами водоупорным грунтом или в виде перегородок из гибкого синтетического материала,.который плотно прикрепл ют на концах карманов к гибкому полотнищу 3. Дл  придани  гибким перегородкам жесткости верхню их кромку скручивают в многослойный 1 9 валик 6 с закреплением его слоев между собой. Затем производ т засыпку карманов балластирующим грузом 7 с созданием насыпного валика. В качестве балластирующего грунта может быть использован грунт, извлеченный при отрывке траншеи 1. Перед засьткой карманов лежащие на бермах кра  полотнищ 3 закрепл ют штыр ми 8. Формула изобретени  . Способ прокладки подземного трубопровода, включающий отрывку траншеи, укладку трубопровода и его балластировку путем перекрыти  с разрывами трубопровода, стенок траншеи и берм гибкими полотнищами с образованием по обе стороны от трубопровода вдоль его оси карманов и обратную засыпку траншеи грунтом, отличающийс  тем, что, с целью повышени  надежности балластировки за счет предотвращени  протекани  талых и грунтовых вод вдоль трубопровода и размывани  грунта засыпки , карманы отдел ют друг от друга поперечными перемычками. QD The invention relates to the field of construction, mainly trunk pipelines, laid through flooded, bogged and flooded areas, as well as in heaving soils. The aim of the invention is to improve the reliability of pipe ballasting in areas with a longitudinal slope by preventing leakage of thawed and groundwater along the pipes of the wire and erosion of the backfill soil. Figure 1 presents the plan laid pipeline without jumpers; figure 2 - section of the pipeline with ground watertight bridges; fig. 3 - the same, with bridges in the form of partitions of flexible synthetic material. The underground pipeline is laid in the following sequence. Produced passage trench 1, sec. Pipe 2 comes to its bottom, overlap the berms, walls, trench bottom and pipe 2 with flexible panels 3 that are stacked with gaps 4. By fitting the mating surfaces of the panel 3, they form pockets that are separated from each other by cross bridges 5 to prevent melted and groundwater along the pipeline and the bottom of the backfill, which increases the reliability of the ballasting of the pipeline 2. Jumpers 5 can be made by backfilling the gaps 4 between pockets of waterproof soil or in the form of partitions a flexible synthetic material, which is tightly attached at the ends of the pockets to the flexible panel 3. In order to impart stiffness to the flexible partitions, their upper edge is twisted into a multi-layer 1 9 roller 6 with its layers fixed to each other. Then pockets are filled with ballast weights 7 with the creation of a bulk roller. As a ballasting primer, the primer can be used when extracting the trench 1. Before zacking the pockets, the edges of the panels 3 lying on the berms are secured with pins 8. Invention formula. A method of laying an underground pipeline, including a trench passage, laying the pipeline and ballasting it by blocking the pipeline, trench walls and berms with flexible panels to form pockets on both sides of the pipeline along its axis and backfilling the trench with soil, characterized in that Improving the reliability of ballasting by preventing the flow of thawed and groundwater along the pipeline and washing out the soil backfill, the pockets are separated from each other by cross bars. 2.Способ по п.1, о т л и ч а ющ и и с   тем, что перемычки выполпутем засыпки разрывов между карманами водоупорным грунтом. 2. The method according to claim 1, about tl and h ayusch and with the fact that the lintels are filled with filling of gaps between the pockets of waterproof primer. 3.Способ по П.1, о т.л и ч а.ю щ и и с   тем, что перемычки выполн ют в виде перегородок из гибкого синтетического материала, который плотно прикрепл ют на концах карманов к гибкому полотнищу. 3. The method according to claim 1, about tl and h a.yu shch and with the fact that the jumpers are made in the form of partitions of flexible synthetic material that is tightly attached at the ends of the pockets to the flexible panel. 4.Способ поп.З, о т л и ч аю щ и и с   тем, что, с целью придани  перегородкам жесткости, верхние их.кромки скручивают в многослойный валик к закреплением слоев валика между собой.4. Method pop.Z, about tl and chayu ni and with the fact that, in order to impart stiffness to partitions, the upper edges of them are twisted into a multi-layer roller to fix the layers of the roller to each other.
SU823436131A 1982-05-13 1982-05-13 Method of laying underground pipeline SU1038679A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823436131A SU1038679A2 (en) 1982-05-13 1982-05-13 Method of laying underground pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823436131A SU1038679A2 (en) 1982-05-13 1982-05-13 Method of laying underground pipeline

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
SU665172A Addition SU133838A1 (en) 1960-04-29 1960-04-29 Deep hydraulic jack

Publications (1)

Publication Number Publication Date
SU1038679A2 true SU1038679A2 (en) 1983-08-30

Family

ID=21011089

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823436131A SU1038679A2 (en) 1982-05-13 1982-05-13 Method of laying underground pipeline

Country Status (1)

Country Link
SU (1) SU1038679A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2467240C1 (en) * 2011-05-16 2012-11-20 Общество с ограниченной ответственностью "Газпром трансгаз Ухта" Underground pipeline routing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2467240C1 (en) * 2011-05-16 2012-11-20 Общество с ограниченной ответственностью "Газпром трансгаз Ухта" Underground pipeline routing method

Similar Documents

Publication Publication Date Title
JPS60500677A (en) Environmental isolation device for deep excavations
RU2031199C1 (en) Complex of structures made in several phases in region of ground water of rock mass under buried wastes and method for making complex structures
SU1038679A2 (en) Method of laying underground pipeline
SU1268860A1 (en) Method of laying underground pipeline
RU2624937C1 (en) Method of surface pipeline construction in swamps
RU2153119C2 (en) Method of ballasting subterranean pipe line
RU98107944A (en) METHOD OF BALLASTING UNDERGROUND PIPELINE
RU1791654C (en) Method of laying underground pipelines
SU1041789A1 (en) Method of laying underground pipeline
SU440527A1 (en) Method of laying pipe whips on marsh soils
SU1559036A1 (en) Method and apparatus for protecting bank against washout of water flow
SU1404737A1 (en) Method of laying underground pipe-line
SU1331951A1 (en) Method of constructing enclosed horizontal drainage system
SU1008558A1 (en) Method of laying underground pipeline
JPS55165317A (en) Burying method for steel-pipe sheet pile
SU1752882A1 (en) Method of filling trenches
SU1222965A1 (en) Method of constructing pipeline underwater section
SU1203241A1 (en) Method of mining mineral deposits with filling-up of excavated space
SU1724994A1 (en) Method of laying subterranean pipe line
RU95100637A (en) Method of locking floating-up two-line gas piping
SU1738901A1 (en) Method of erecting tailings dump in mining minerals deposits
SU1090793A1 (en) Counter-filtration screen
SU1530662A1 (en) Method of constructing antiseepage screen element of earth dam
JPS59106611A (en) Laying work of water sealing sheet
RU2137882C1 (en) Method of producing compacted earth slope