Abstract
Использование: строительство, технологи укладки дренажных груб при осуществлении котлованов и защите сооружений от воздействи грунтовых вод. Сущность изобретени : в плывунных грунтах сооружают опускной колодец и осуществл ют водоотвод . Позонно отрывают траншею от колодца по оси укладки дренажной трубы. Траншею отрывают до по влени влажного грунта. Стенки траншеи закрепл ют путем размещени в траншеи ограждающего элемента и последующей выемки из него. Грунт вынимают до опускани элемента на глубину размещени дренажных труб. Укладывают дренирующие трубы, на торец которых устанавливают заслонку. Отсыпают дренирующий слой. Засыпают траншею грунтом, при этом извлекают ограждающий элемент после его заполнени грунтом.Usage: construction, technology laying drainage rough in the implementation of the pits and the protection of structures from the effects of groundwater. SUMMARY OF THE INVENTION: A drain well is constructed in flowing soil and drainage is performed. Fold over the trench from the well along the axis of laying the drainage pipe. The trench is torn off until the appearance of moist soil. The walls of the trench are secured by placing the enclosing element in the trench and then removing it. The soil is removed before the element is lowered to the depth of the drainage pipes. Put the drainage pipe, on the end of which install the valve. Sleep drainage layer. The trench is filled up with soil, while the barrier element is removed after it is filled with soil.
Description
СПSP
сwith
Изобретение относитс к строительству , а именно к укладке дренажных труб при осушении котлованов и защите сооружений от воздействи грунтовых вод.The invention relates to the construction, in particular to the laying of drainage pipes during the drainage of pits and the protection of structures from the effects of groundwater.
Дель изобретени - сокращение трудозатрат .The invention is a reduction in labor costs.
Укладку дренажных труб в плывунных грунтах осуществл ют следующим образом.The laying of drainage pipes in floating soils is carried out as follows.
В плывунном грунте сооружают опускной колодец и осуществл ют водоотвод. После этого отрывают траншею позонно от колодца по оси укладки дренажных труб до по влени влажного грунта. При отрыве траншеи ее стенки закрепл ют, размеща в ней ограждающий элемент, выполненный в виде короба без верхней и нижней стенок. Из ограждающего элемента вынимают грунт до его опускани на глубину размещени дренажных труб. Укладывают дренажные трубы, одева на их торец заслонку, иIn a floating ground, a drop well is constructed and drainage is carried out. After that, the trench is torn off from the well along the axis of the drainage pipe laying until the appearance of wet soil. When the trench is torn off, its walls are fixed by placing in it an enclosing element made in the form of a box without top and bottom walls. The soil is removed from the enclosing member before it is lowered to the depth of placement of the drainage pipes. Lay drainage pipes, putting a flap on their end, and
дренирующий слой. Осуществл ют обратную засыпку траншеи, во врем которой ограждающий элемент извлекают из траншеи после заполнени его грунтом.drainage layer. The trench is backfilled, during which the enclosing element is removed from the trench after it is filled with soil.
Пример. Производили укладку дренажных труб диаметром 182 мм, длиной 3,96 м в плывунный грунт. В водосборный колодец погрузили шланг водопогружного насоса , обеспечив откачку воды. Переставное ограждающее устройство установили в траншею по оси укладки трубы. Ограждающее устройство представл ет собой жесткую объемную конструкцию из двух железобетонных плит по торцам, соединенных стальными двутавровыми балками, уголками, стальной полосой. Петли дл подьема ограждени из грунта подобраны из расчета максимального усили при извлечении ограждени из грунта с трехкратным коэффициентом запаса прочности.Example. Drainage pipes with a diameter of 182 mm and a length of 3.96 m were laid in flowing soil. A water submersible pump hose was immersed in the water collection well, ensuring the pumping of water. Relocatable fencing installed in the trench along the axis of laying the pipe. The fencing device is a rigid three-dimensional structure of two reinforced concrete slabs at the ends connected by steel I-beams, corners, steel strip. The loops for lifting the fence from the ground are selected on the basis of the maximum force when removing the fence from the soil with a threefold safety factor.
CJCJ
соwith
(Л(L
XIXi
Максимальное усилие при извлечении из грунта составило 6 т. Диаметр арматурной стали дл петель выбран 22 мм при использовании в конструкции двутавровой балки № 24, уголков 90 х 65 х 4 и 45 х 4, В торцовой стенке выполнен вырез шириной на 50 мм больше наружного диаметра трубы и на высоту , составл ющую сумму величин диаметра трубы, высоты дренажного сло под трубу и 250 мм дл обеспечени удержани грунта в нижней части ограждени от возможного его прохода под ножом, приваренным к нижней части конструкции дл облегчени заглублени ограждени в грунт. При погружении ограждающего устройства дл ускорени его погружени в грунт периодически, после нескольких циклов выемки грунта из емкости ограждени , производ т допогружение при помощи ковша экскаватора. Козш поочередно устанавливают на углы ограждени и передают усилие рабочего органа экскаватора через двутавровую балку и железобетонные торцы на ножевую часть. После установки ограждающего устройства в траншею на глубине прокладки дренажной трубы в емкость устройства засыпали песчано гравийную смесь и уложили трубу концом в выемку. На торец раструба трубы надели мешковину и прикрутили ее к трубе м гкой проволокой. Мешковина (рогожа) в данном случае выступает в роли заслонки дл предупреждени попадани грунта внутрь трубы. Снимаетс мешковина непосредственно перед стыковкой с последующей трубой. После этого ковшом экскаватора засыпали грунт в емкость ограждающего устройства до верха; надели петли на стропы крана иThe maximum force during extraction from the soil was 6 tons. The diameter of the reinforcing steel for the loops was 22 mm when used in the construction of I-beam No. 24, corners 90 x 65 x 4 and 45 x 4, 50 mm wider than the outer diameter in the end wall pipe and to a height of the sum of the diameter of the pipe, the height of the drainage layer under the pipe and 250 mm to ensure soil retention in the lower part of the fence from its possible passage under the knife, welded to the lower part of the structure to facilitate the deepening of the fence in the group nt When the fencing device is immersed, in order to accelerate its immersion in the soil, periodically, after several cycles of excavation of the soil from the fencing tank, additional loading is made with an excavator bucket. Kozsh alternately installed on the corners of the fence and transmit the force of the working body of the excavator through an I-beam and reinforced concrete ends on the knife part. After installing the fencing device in the trench at the depth of the drainage pipe laying, the sand and gravel mixture was poured into the device tank and the pipe was laid with the end into the recess. At the end of the bell pipe put burlap and fastened it to the pipe with soft wire. Sacking (matting) in this case acts as a damper to prevent soil from getting inside the pipe. The burlap is removed immediately prior to docking with a subsequent pipe. After that, the excavator bucket covered the soil in the container of the protective device to the top; put the loops on the crane slings and
вынули переставное ограждающее устройство из грунта. Затем операцию повторили, установив ограждающее устройство в траншею вдоль трассы.took out the floating fence from the ground. Then the operation was repeated, setting the fencing device in the trench along the road.
Применение предлагаемого способа дает возможность отказатьс от всех видов креплени траншей при сооружении газопроводов , водопроводов и особенно эффективно при сооружении канализации иThe application of the proposed method makes it possible to refuse all types of fastening trenches in the construction of gas pipelines, water mains and is particularly effective in the construction of sewage and
дренажа в плывунных грунтах. Применение способа исключает использование дренажных систем при дренировании плывунных грунтов, что значительно сокращает капитальные затраты, трудоемкость и сроки выполнени дренажных работ.drainage in floating soils. The use of the method eliminates the use of drainage systems in the drainage of floating soils, which significantly reduces capital costs, labor intensity and time for performing drainage works.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894654289A SU1733571A1 (en) | 1989-02-27 | 1989-02-27 | Method of laying drainage pipes in quicksand soil |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894654289A SU1733571A1 (en) | 1989-02-27 | 1989-02-27 | Method of laying drainage pipes in quicksand soil |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1733571A1 true SU1733571A1 (en) | 1992-05-15 |
Family
ID=21430437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU894654289A SU1733571A1 (en) | 1989-02-27 | 1989-02-27 | Method of laying drainage pipes in quicksand soil |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1733571A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764396A (en) * | 2020-07-07 | 2020-10-13 | 中建一局集团建设发展有限公司 | Construction method for water-rich stratum pit-in-pit |
-
1989
- 1989-02-27 SU SU894654289A patent/SU1733571A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 1418406, кл. Е02 В 11/00. 1986. Химерик Ю.А. Защита зданий и сооружений от грунтовых вод. Киев: Будивельник, 1976, с. 35. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764396A (en) * | 2020-07-07 | 2020-10-13 | 中建一局集团建设发展有限公司 | Construction method for water-rich stratum pit-in-pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111733828A (en) | Large-section deep foundation pit fender pile and prestressed anchor cable supporting construction technology | |
CN110593375A (en) | Pipe burying construction method for pipeline by adopting digging groove | |
CN111456019A (en) | Safe construction method for foundation pit excavation | |
CN110778328B (en) | Loess tunnel entrance section construction method for passing through landslide body | |
CN112160324A (en) | Construction method for deep foundation pit support | |
CN112064751A (en) | Deep groove construction method for drainage pipeline | |
CN113174958A (en) | Construction method for foundation pit of adjacent road under poor ground condition | |
CN113847050B (en) | Construction method of ultra-long highway tunnel in lava mountain area | |
CN115262730A (en) | Construction method of rain sewage pipeline | |
CN110821512B (en) | Loess tunnel entrance opening section pre-reinforcing and excavating construction method passing through landslide body | |
CN212077981U (en) | Combined slope supporting structure | |
SU1733571A1 (en) | Method of laying drainage pipes in quicksand soil | |
CN207828994U (en) | It is a kind of draining and recharge constructing structure | |
CN113266362B (en) | Top pipe cover excavation construction method for penetrating through existing dense anchor cable area | |
CN114855822A (en) | Construction method for deep foundation pit of rain sewage pipeline on highway | |
KR940002457B1 (en) | Method and apparatus for increasing bearing capacity of soft soil and constructing cutoff wall | |
TWI267575B (en) | Method for constituting a vertical well in water, vertical well in water, method for connection of a vertical well and a horizontal well, and construction of a well | |
CN210315908U (en) | Immersed tube type inspection well | |
CN109098205B (en) | Civil air defense underground passage and construction method thereof | |
CN113235603A (en) | Civil air defense engineering foundation pit earthwork construction method | |
KR200224758Y1 (en) | Structure of caisson soil protection four concret caisson | |
CN111042049A (en) | Rainwater pipe construction process | |
CN114753231B (en) | Frame beam lattice bridge structure crossing underground pipeline and construction method thereof | |
CN114319372B (en) | Construction method of anchorage supporting structure | |
CZ292305B6 (en) | Trough-like basin and process for making thereof |