SU1666743A1 - Support for development workings - Google Patents

Support for development workings Download PDF

Info

Publication number
SU1666743A1
SU1666743A1 SU894635798A SU4635798A SU1666743A1 SU 1666743 A1 SU1666743 A1 SU 1666743A1 SU 894635798 A SU894635798 A SU 894635798A SU 4635798 A SU4635798 A SU 4635798A SU 1666743 A1 SU1666743 A1 SU 1666743A1
Authority
SU
USSR - Soviet Union
Prior art keywords
shelves
bolts
free ends
compliance
nodes
Prior art date
Application number
SU894635798A
Other languages
Russian (ru)
Inventor
Евгений Семенович Киселев
Иван Григорьевич Косков
Георгий Игнатьевич Кременецкий
Андрей Евгеньевич Киселев
Ольга Евгеньевна Новикова
Original Assignee
Институт горного дела им.А.А.Скочинского
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела им.А.А.Скочинского filed Critical Институт горного дела им.А.А.Скочинского
Priority to SU894635798A priority Critical patent/SU1666743A1/en
Application granted granted Critical
Publication of SU1666743A1 publication Critical patent/SU1666743A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Изобретение относитс  к горному делу и предназначено дл  креплени  подземных подготовительных горных выработок угольных шахт и рудников. Цель - расширение области применени  и увеличени  сопротивлени  податливости крепи. Дл  этого стойки и верхн к крепи соединены узлами податливости и выполнены в виде пары Z - образных прогонов (П) 3, жестко соединенных между собой планками с ребрами жесткости. Состо т П 3 из стенок 6, плоских полок 7 и желобчатых полок 8 и выполнены удлиненными с образованием свободных не соединенных планками концов. Свободные концы 3 соединены внахлест с образованием узлов податливости. В местах нахлеста свободных концов 3 установлены болты 10 с парами накладок (Н) 9. Длина свободных концов равна сумме половины величины податливости и величины их нахлеста. Планки и Н 9 с болтами 10 установлены на полках 7. Полки 8 выполнены с наклонными боковыми стенками с образованием скоса 11 и наклонной реборды 12. При превышении горючего давлени  П 3 верхн ков в соединительных узлах смещаютс  по П 3 стоек, предохран   крепь от разрушени . За счет сжати  П 3 стоек и верхн ков Н 9 с болтами 10, взаимодействующими с верхними полками 7, обеспечиваетс  необходимое сопротивление податливости крепи. 4 ил.FIELD OF THE INVENTION The invention relates to mining and is intended to mount underground preparatory mine workings of coal mines and mines. The goal is to expand the scope and increase the resistance of the support of the lining. For this stand and the top to the lining are connected by nodes of compliance and made in the form of a pair of Z - shaped purlins (P) 3, rigidly interconnected by planks with stiffeners. The P 3 consists of walls 6, flat shelves 7 and grooved shelves 8 and is made elongated to form free, un-connected ends. The free ends 3 are overlapped with the formation of nodes of compliance. In the places of the overlap of the free ends 3, bolts 10 are installed with pairs of plates (H) 9. The length of the free ends is equal to the sum of half the magnitude of the pliability and the size of their overlap. Slats and H 9 with bolts 10 are mounted on shelves 7. Shelves 8 are made with inclined side walls with the formation of a bevel 11 and inclined flange 12. When the fuel pressure is exceeded, the P 3 upper caps in the connecting nodes are displaced by P 3 racks; By compressing the P 3 pillars and the tops of the H 9 with the bolts 10 interacting with the upper shelves 7, the necessary support resistance of the lining is provided. 4 il.

Description

))

ЬB

юYu

ОABOUT

оabout

х| Јь 00x | 00 00

Фиг.ЗFig.Z

Изобретение относитс  к горному делу, а именно к средствам креплени  подземных подготовительных горных выработок угольных шахт и рудников.FIELD OF THE INVENTION The invention relates to mining, namely to the means of securing underground preparatory mine workings of coal mines and mines.

Целью изобретени   вл етс  расширение области применени  и увеличение сопротивлени  податливости крепи,The aim of the invention is to expand the scope and increase the resistance of the support,

На фиг.1 изображена крепь подготовительных горных выработок; на фиг.2 - то же, вид сбоку; на фиг.З - сечение А-А на фиг.1; на фиг.4 - сечение Б-Б на фиг.З.Figure 1 shows lining preparatory mine workings; figure 2 is the same, side view; on fig.Z - section aa in figure 1; figure 4 - section bb in fig.Z.

Крепь подготовительных горных выработок состоит из отдельных рам, включающих две стойки 1 и верхн к 2 в виде Z-образных прогонов 3, жестко соединенных между собой установленными вразбеж- ку планками 4 с ребрами жесткости 5. Z-образные прогоны 3 состо т из стенок 6, плоских полок 7 и желобчатых полок 8. Планки 4 закреплены на плоских полках 7, а желобчатые полки соединены парами накладок 9 с отверсти ми под болты 10. Z-образные прогоны 3 выполнены удлиненными с образованием свободных концов, не соединенных планками 4, свободные концы верхн ков 2 и стоек 1 соединены внахлест с образованием узлов податливости, в которых установлены пары накладок 9 с болтами 10. Длина свободных концов равна сумме половины величины податливости и величины их нахлестки. Нахлестка принимаетс  увеличенной не менее 450-500 мм. Прин тие увеличенной нахлестки выступающих прогонов 3 св зано с необходимостью обеспечени  возможности установки крепи с предварительным ее распором в кровлю выработки, где переборы пород могут достигать 200-300 мм. Дл  обеспечени  образовани  нахлестки концов прогонов 3 желобчатые полки выполнены с наклонными стенками с образованием скоса 11 и наклонной реборды 12,The preparation of preparatory mine workings consists of separate frames, including two pillars 1 and top to 2 in the form of Z-shaped girders 3, rigidly interconnected by races 4 mounted against the ribs 5 and stiffening ribs 5. Z-shaped girders 3 consist of walls 6 , flat shelves 7 and grooved shelves 8. The slats 4 are fixed on flat shelves 7, and the grooved shelves are connected by pairs of plates 9 with bolt-hole holes 10. Z-shaped girders 3 are elongated to form free ends, not connected by slats 4, free ends upper 2 and st ek 1 lapped to form pliability nodes in which a pair of cover plates installed 9 with bolts 10. The length of the free ends is equal to the sum of half value of compliance and values of their overlap. The overlap is accepted enlarged to not less than 450-500 mm. The acceptance of an increased overlap of the protruding runs 3 is associated with the need to ensure the possibility of installing the lining with its preliminary spreading into the roof of the mine, where overruns of rocks can reach 200-300 mm. To ensure the overlapping of the ends of the runs 3, the grooved shelves are made with inclined walls with the formation of a bevel 11 and an inclined flange 12,

Монтаж крепи подготовительных горных выработок начинают с установки стоек 1. Затем к кровле выработки поднимают верхн к 2 и соедин ют его со стойками 1. Дл  этого свободные концы прогонов 3 верхн ков 2 накладывают на свободные концы прогонов 3 стоек 1. Такое предварительное наложение концов выступающих прогонов 3 стоек 1 и верхн ков 2 обеспечиваетс  благодар  наличию скосов 11, После этого на плоские полки 7 Z-образных прогонов 3 накладывают попарно накладки 9 с болтами 10 и гайками, завинчиванием которых при помощи гайковертов обеспечиваетс  полное смыкание соедин емых свободных концов прогонов 3 стоек 1 и верхн ков 2 до образовани  их контактов по наклонным ребордам 12 нижних полок 8 Z-образного прогона 3.The installation of preparatory mine workings begins with the installation of racks 1. Then the top is raised to the top of the excavation to 2 and connected to the racks 1. To do this, the free ends of the runs 3 of the upper 2 impose 3 stands on the free ends of the runs of the protruding runs 3 racks 1 and tops 2 is provided due to the presence of bevels 11. After that, on flat shelves 7 Z-shaped runs 3, lining 9 with bolts 10 and nuts are put in pairs, which are screwed down using wrenches Full closure of the connected free ends of the runs 3 of the uprights 1 and the upper 2 until their contacts form along the inclined flanges 12 of the lower shelves 8 of the Z-shaped run 3.

Поскольку стойки и верхн ки рам крепи имеют одинаковое поперечное сечение, приSince the pillars and the top support frames have the same cross section,

смыкании концов прогонов они взаимно изгибаютс  (в противоположных направлени х ) в плоскости, перпендикул рной стенкам 6 Z-образных прогонов 3, создава  тем самым на этих стенках дополнительные уси0 ли , увеличивающие общее сопротивление податливости крепи.when the ends of the runs are closed, they are mutually bent (in opposite directions) in a plane perpendicular to the walls of the 6 Z-shaped runs 3, thereby creating additional forces on these walls that increase the overall support resistance of the support.

Заключительными операци ми возведени  крепи  вл етс  расклинивание вновь установленных рам согласно прин томуThe final erection operations of the lining is the wedging of the newly installed frames according to the accepted

5 паспорту креплени  выработки и при необходимости забутовка закрепного пространства .5 passport fastening production and, if necessary, zabutovka securement space.

Крепь подготовительных горных выработок работает следующим образом.The support of preparatory mining works as follows.

0 При превышении силами горного давлени  величины сопротивлени  податливости крепи прогоны 3 верхн ков 2 в соединительных узлах смещаютс  по прогонам 3 стоек 1, предохран   тем самым крепь от разру5 шени . При этом необходимое сопротивление податливости крепи обеспечиваетс  за счет сжати  прогонов 3 стоек 1 и верхн ков 2 в соединительных узлах накладками с болтами 10, взаимодействующими с верхними0 When the rock pressure forces exceed the compliance resistance of the support, the purlins 3 of the upper 2 in the connecting nodes are displaced along the purlins of the 3 racks of 1, thereby protecting the anchors from destruction. At the same time, the required resistance of the support of the lining is provided by compressing the runs 3 of the uprights 1 and the tops 2 in the connecting nodes with the plates with the bolts 10 interacting with the upper

0 полками 7 Z-образного прогона 3.0 shelves 7 Z-shaped run 3.

Claims (1)

Формула изобретени  Крепь подготовительных горных выработок , включающа  соединенные узлами податливости стойки и верхн к, выполнен5 ные в виде пары Z-образных прогонов с плоскими и желобчатыми полками, прогоны, ориентированные одноименными полками одна к другой, полки, жестко соединенные планками, установленными вразбежку, иFormula of the invention Preparatory mine workings, including connected by the nodes of the rack and the top to, made 5 in the form of a pair of Z-shaped girders with flat and grooved shelves, girders oriented by the same name shelves to each other, shelves rigidly connected by slats installed in a running mode, and 0 болтами, установленными в парах накладок с резьбовыми отверсти ми под болты, отличающа с  тем, что, с целью расширени  области применени  и увеличени  сопротивлени  податливости, Z-образ5 ные прогоны выполнены удлиненными с образованием свободных несоединенных планками концов, при этом свободные концы Z-образных прогонов стоек и верхн ков соединены внахлест с образованием узлов0 bolts installed in pairs of lugs with threaded bolt holes, characterized in that, in order to expand the field of application and increase the resistance of compliance, Z-shaped girders are made elongated to form free non-spliced ends, while the free ends of the Z- shaped runs racks and tops connected overlap with the formation of nodes 0 податливости, болты с парами накладок установлены в местах нахлеста свободных концов Z-образных прогонов, причем планки и накладки с болтами установлены на плоских полках, а желобчатые полки выпол5 нены с наклонными боковыми стенками, при этом свободные концы прогонов выполнены длиной, равной сумме величины их нахлестки и половины величины податливости .0 compliance, bolts with pairs of plates installed in the overlap of the free ends of the Z-shaped girders, with the slats and lining with bolts installed on flat shelves, and the grooved shelves are made with inclined side walls, while the free ends of the girders are made equal to the sum of their overlaps and half the magnitude of compliance. NjNj Фиг. 2FIG. 2 0i/г. 0i / g.
SU894635798A 1989-01-12 1989-01-12 Support for development workings SU1666743A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894635798A SU1666743A1 (en) 1989-01-12 1989-01-12 Support for development workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894635798A SU1666743A1 (en) 1989-01-12 1989-01-12 Support for development workings

Publications (1)

Publication Number Publication Date
SU1666743A1 true SU1666743A1 (en) 1991-07-30

Family

ID=21422050

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894635798A SU1666743A1 (en) 1989-01-12 1989-01-12 Support for development workings

Country Status (1)

Country Link
SU (1) SU1666743A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1033755, кл. Е21 D 11/14, 1982. Авторское свидетельство СССР № 1317144, кл. Е 21 D 11/14, 1985. *

Similar Documents

Publication Publication Date Title
SU1666743A1 (en) Support for development workings
US2237226A (en) Roof construction
US3614870A (en) Soil tight retaining wall
DE3027661A1 (en) Mine gallery roof supports and edge securing beams - are anchored lattice girders functioning as initial supports and advance rails
CN208310823U (en) A kind of large span rectangular shaped roadways H shaped steel shack supporting construction
SU1712620A1 (en) Mine working support
SU1245708A1 (en) Reinforced arched support
SU1511414A1 (en) Forms for blast-unloading of rock about mine working
CN2182880Y (en) Means for supporting and keeping gallery
SU949189A1 (en) Method for supporting horizontal preparatory workings
GB1534297A (en) Purlins
CN108222991A (en) A kind of anti-waste residue falling protecting device of coal mining
CN219366081U (en) Mining single prop prevents down hard connecting device
CN218828737U (en) Combined transformer substation mounting structure
GB893243A (en) Improvements relating to roof structures
SU870726A1 (en) Support for advance workings
RU2012815C1 (en) Reusable forms for filling space behind support
RU2370652C1 (en) Circular support of excavation and method for its setting
SU1532715A1 (en) Metal arch support
SU1476143A1 (en) Mine support of special rolled metal shapes
SU960443A1 (en) Preparotary working timbering for steep beds
RU2111364C1 (en) Shield cover for mining of thick steep seams
GB583869A (en) Improvements in and relating to weather protection of building sites and the like
SU924391A1 (en) Prefabricated frame support
SU883477A1 (en) Method of securing mine working while driving them