SU1587200A1 - Method of supporting a development working - Google Patents

Method of supporting a development working Download PDF

Info

Publication number
SU1587200A1
SU1587200A1 SU884449016A SU4449016A SU1587200A1 SU 1587200 A1 SU1587200 A1 SU 1587200A1 SU 884449016 A SU884449016 A SU 884449016A SU 4449016 A SU4449016 A SU 4449016A SU 1587200 A1 SU1587200 A1 SU 1587200A1
Authority
SU
USSR - Soviet Union
Prior art keywords
coal seam
maintaining
mine
order
cavities
Prior art date
Application number
SU884449016A
Other languages
Russian (ru)
Inventor
Валерий Андреевич Забродский
Николай Алексеевич Николаенко
Петр Антонович Максимяк
Геннадий Семенович Нестеров
Александр Александрович Леман
Original Assignee
Институт горного дела им.А.А.Скочинского
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела им.А.А.Скочинского filed Critical Институт горного дела им.А.А.Скочинского
Priority to SU884449016A priority Critical patent/SU1587200A1/en
Application granted granted Critical
Publication of SU1587200A1 publication Critical patent/SU1587200A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Изобретение относитс  к горному делу и может быть использовано дл  поддержани  горной выработки (ГВ). Цель - повышение надежности поддержани  ГВ при пересечении ею угольного пласта. В боках ГВ 1 выполн ют разгрузочные полости в виде щелей на контакте верхней части угольного пласта 2 с вмещающими породами. В щел х размещают металлические подхваты 3, а между ними эластичные баллоны. Затем устанавливают остальные элементы крепи: зат жку, арки 6 и ножки 7 с распором в контур ГВ 1. После этого производ т тампнаж закрепного пространства 10. Арки могут быть соединены замком 8, при этом их опирают на выступающие в ГВ 1 концы металлических подхватов. 4 ил.The invention relates to mining and can be used to maintain mining (HB). The goal is to increase the reliability of maintaining the GW when it crosses the coal seam. In the sides of HS 1, discharge cavities are made in the form of slots at the contact of the upper part of the coal seam 2 with enclosing rocks. In the slits, metal supports 3 are placed, and between them elastic cylinders. Then, the rest of the lining elements are installed: a stopper, arches 6 and legs 7 with expansion into the HW circuit 1. After this, the fixing space 10 is tamped. The arches can be connected with lock 8, while they are supported by protruding ends of H. 4 il.

Description

.. ..

.i.i

Claims (1)

Формула изобретенияClaim Способ поддержания подготовительной выработки включающий возведение элементов крепи и затяжки, формирование в боках выработки разгрузочных полостей и последующий тампонаж закрепного пространства, отличающийся тем, что, с целью повышения надежности поддержания выработки при пересечении ею угольного пласта, первоначально на контакте верхней части угольного пласта с вмещающими породами выполняют разгрузочные полости в виде щелей, в которых последовательно устанавливают металлические подхваты и эластичные баллоны, после чего производят возведение элементов крепи с распором в контур выработки.A method of maintaining a preparatory mine, including erecting support and tightening elements, forming unloading cavities in the sides of the excavation and subsequent plugging of the fixed space, characterized in that, in order to increase the reliability of maintaining the mine when it intersects a coal seam, initially at the contact of the upper part of the coal seam with the host rocks perform discharge cavities in the form of slots in which metal pickups and elastic cylinders are successively installed, after which ny construction elements with the thrust lining in the circuit output. А-АAa Составитель Л. Чистова Compiled by L. Chistova Редактор В. Бугренкова Заказ 2405 Editor V. Bugrenkova Order 2405 Техред А. Кравчук Корректор М. Кучерявая Тираж 385 Подписное Tehred A. Kravchuk Proofreader M. Kucheryavaya Circulation 385 Subscription
ВНИИПИ Государственного комитета по изобретениям и открытиям при Г'КНТ СССРVNIIIPI State Committee for Inventions and Discoveries at the USSR GKNT 113035, Москва, Ж—35, Раушская наб., д. 4/5113035, Moscow, Zh-35, Raushskaya nab., D. 4/5 Производственно-издательский комбинат «Патент», г. Ужгород, ул. Гагарина, 101Production and Publishing Plant "Patent", Uzhhorod, st. Gagarina, 101
SU884449016A 1988-05-03 1988-05-03 Method of supporting a development working SU1587200A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884449016A SU1587200A1 (en) 1988-05-03 1988-05-03 Method of supporting a development working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884449016A SU1587200A1 (en) 1988-05-03 1988-05-03 Method of supporting a development working

Publications (1)

Publication Number Publication Date
SU1587200A1 true SU1587200A1 (en) 1990-08-23

Family

ID=21384924

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884449016A SU1587200A1 (en) 1988-05-03 1988-05-03 Method of supporting a development working

Country Status (1)

Country Link
SU (1) SU1587200A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1055879, кл. Е 21 D 11/00, 1983. Авторское свидетельство СССР № 1294996, кл. Е 21 D П /ОО, 1987. *

Similar Documents

Publication Publication Date Title
SU1587200A1 (en) Method of supporting a development working
RU96111486A (en) METHOD FOR PRESERVING MINING
SU1294996A1 (en) Method of protecting mine workings in weak rock
SU629347A1 (en) Mine working roof support
SU1474272A1 (en) Method of repairing disturbed concrete lining with inner metal shell
SU1460300A1 (en) Frame support
SU1566033A1 (en) Method of joining underground tunnel sections
SU1164396A1 (en) Packer
SU1693249A1 (en) Method of driving ascending workings
SU1321825A1 (en) Method of erecting support from elongated shells
SU625044A1 (en) Method of supporting mine workings
SU1154475A1 (en) Prefabricated ferroconcrete support
SU1580014A1 (en) Method of guarding mine working
SU1670147A2 (en) Section of mechanized support
SU878936A1 (en) Method of mining sloping and gently sloping mineral seams
SU1543097A1 (en) Method of filling mine workings
SU960442A1 (en) Timbering for preparotary working
SU1604994A1 (en) Working support
RU93035225A (en) METHOD OF DEVELOPMENT OF PROPOSITION AND INCLINED POWERFUL ORE BODIES
SU1305361A1 (en) Method of supporting mine workings
SU1029680A1 (en) Method of working copper deposits
SU1404622A1 (en) Blast furnace reconstruction method
SU1694916A1 (en) Support for development working
SU1463763A1 (en) Method of reconstructing a blast furnace
SU1460296A1 (en) Method of protecting a mine working