SU1571250A2 - Method of protecting mine working against surface water inflow - Google Patents

Method of protecting mine working against surface water inflow Download PDF

Info

Publication number
SU1571250A2
SU1571250A2 SU884604022A SU4604022A SU1571250A2 SU 1571250 A2 SU1571250 A2 SU 1571250A2 SU 884604022 A SU884604022 A SU 884604022A SU 4604022 A SU4604022 A SU 4604022A SU 1571250 A2 SU1571250 A2 SU 1571250A2
Authority
SU
USSR - Soviet Union
Prior art keywords
permeable
river bed
river
zone
layer
Prior art date
Application number
SU884604022A
Other languages
Russian (ru)
Inventor
Николай Иванович Никифоров
Альберт Михайлович Оллыкайнен
Александр Сергеевич Миронов
Original Assignee
Nikiforov Nikolaj
Ollykajnen Albert M
Mironov Aleksandr S
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nikiforov Nikolaj, Ollykajnen Albert M, Mironov Aleksandr S filed Critical Nikiforov Nikolaj
Priority to SU884604022A priority Critical patent/SU1571250A2/en
Application granted granted Critical
Publication of SU1571250A2 publication Critical patent/SU1571250A2/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Изобретение относитс  к горному делу и позвол ет уменьшить фильтрацию поверхностных вод в горные выработки до допустимой величины через гидравлически св занные с руслом реки проницаемые породы. Перед разработкой полезного ископаемого 1 в проницаемых порода определ ют нижнюю границу проницаемой зоны. В границах русла реки 6 и за их пределами определ ют положение расчетных границ зоны вли ни  от подработки 7. Затем отвод т русло реки за пределы границ русла реки и формируют временный водоток 10 речного потока. В границах русла реки настилают слой 8 слабопроницаемого материала. Вдоль расчетных границ зоны вли ни  от подработки русла реки от внешней поверхности сло  слабопроницаемого материала до нижней границы проницаемой зоны возвод т гидроизолирующий экран 9, 11 и 12. Причем его возведение ведут на расчетную длину за пределы русла реки и временного потока. После возведени  гидроизолирующего экрана, подработки сло  и завершени  периода оседани  земной поверхности временный водоток речного потока перекрывают и перепускают его поверх слабопроницаемого сло  в границах русла реки. 5 ил.The invention relates to mining and allows reducing the filtration of surface water into mine workings to an acceptable value through permeable rocks which are hydraulically connected to the river bed. Prior to the development of mineral 1 in permeable rock, the lower boundary of the permeable zone is determined. Within the borders of the river bed 6 and beyond their limits, they determine the position of the calculated boundaries of the zone affected by part-time work 7. Then they divert the river bed beyond the borders of the river bed and form a temporary watercourse 10 of the river flow. Within the boundaries of the river bed a layer of 8 low-permeable material is laid. A waterproofing screen 9, 11 and 12 is erected along the calculated boundaries of the zone from the riverbed from the outer surface of the layer of low-permeable material to the lower boundary of the permeable zone. Moreover, its construction is carried out over the estimated length beyond the riverbed and temporary flow. After the erection of the waterproofing screen, the undermining of the layer and the end of the subsidence period of the earth's surface, the temporary flow of the river flow is blocked and overflowed over the low-permeable layer within the river bed. 5 il.

Description

7H

99

АBUT

4 54 5

Фиг. 5FIG. five

ФиглFig

Claims (1)

Формула изобретенияClaim Способ защиты горных выработок от , притока поверхностных вод по авт. св. № 1425330, отличающийс я тем, что, с целью уменьшения фильтрации поверхностных вод в горные выработки до допустимой величины через гидравлически связанные с руслом реки проницаемые породы, в проницаемых породах, связанных с руслом реки, определяют нижнюю границу проницаемой зоны, затем вдоль расчетных границ зоны влияния от подработки рус ла реки от внешней поверхности слоя слабопроницаемого материала до нижней границы проницаемой зоны возводят гидроизолирующий экран с выходом его за пределы русла реки и временного водотока.The way to protect the mine workings from, the flow of surface water on the author. St. No. 1425330, characterized in that, in order to reduce the filtration of surface water into the mine workings to an allowable value, through the hydraulically connected with the river bed permeable rocks, in the permeable rocks associated with the river bed, determine the lower boundary of the permeable zone, then along the calculated boundaries influences from underworking the river bed from the outer surface of the layer of low-permeable material to the lower boundary of the permeable zone, a waterproofing screen is erected with its outflow beyond the river and the temporary watercourse. 15712501571250 Фиг2Fig2 15712501571250
SU884604022A 1988-09-26 1988-09-26 Method of protecting mine working against surface water inflow SU1571250A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884604022A SU1571250A2 (en) 1988-09-26 1988-09-26 Method of protecting mine working against surface water inflow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884604022A SU1571250A2 (en) 1988-09-26 1988-09-26 Method of protecting mine working against surface water inflow

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
SU1425330 Addition

Publications (1)

Publication Number Publication Date
SU1571250A2 true SU1571250A2 (en) 1990-06-15

Family

ID=21408780

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884604022A SU1571250A2 (en) 1988-09-26 1988-09-26 Method of protecting mine working against surface water inflow

Country Status (1)

Country Link
SU (1) SU1571250A2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924975A (en) * 2014-04-16 2014-07-16 河北煤炭科学研究院 Water retaining method for coal mining process
WO2019091048A1 (en) * 2017-11-09 2019-05-16 中国矿业大学 "five maps-three zones-two sub-areas" water-preserved coal mining method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1425330, кл Е 21 С 41/04, 19870 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924975A (en) * 2014-04-16 2014-07-16 河北煤炭科学研究院 Water retaining method for coal mining process
CN103924975B (en) * 2014-04-16 2016-01-20 河北煤炭科学研究院 A kind of for the water-retaining method in coal mining process
WO2019091048A1 (en) * 2017-11-09 2019-05-16 中国矿业大学 "five maps-three zones-two sub-areas" water-preserved coal mining method

Similar Documents

Publication Publication Date Title
SU1571250A2 (en) Method of protecting mine working against surface water inflow
Milanovic Prevention and remediation in karst engineering
Chandler et al. Connected pathways in the EDZ and the potential for flow along tunnels
CN208055980U (en) A kind of permeable erosion control wall construction of hydraulic engineering
SU1427027A1 (en) Earth dam
SU140371A1 (en) The way to close the river beds
Jones et al. The Dolaucothi gold-mines
SU724781A1 (en) Method of preventing flooding of earth-surface worked areas by subsoil and surface waters
JP3903355B2 (en) Parallel construction method of underground cavity dam and ground dam
CN107227973A (en) Thin-base-rock shallow coal-layer crosses ditch exploitation working face flood and waterlogging control method
CN108343447A (en) A kind of tunnel inner steel web safety support construction suitable for frangible rock stratum
SU874849A1 (en) Method of erecting an earth dam with counter-filtration elements
SU1659652A1 (en) Method of protecting mine workings against inflow of surface water
Milanović Water Resources Projects
SU1002449A1 (en) Method of consolidating a river bank
SU1232735A1 (en) Method of protecting the slope of earth hydraulic structure
SU1006577A1 (en) Dam from soil materials
SU1758153A1 (en) Method of erecting river head in hydraulic tunnel
Guatteri et al. 360° Jet-Grouted Conical Chambers Allow Safe Tunnelling Under A River Within An Highly Pervious Environment
JPS57205604A (en) Water-utilization work in mountain stream
Prakash et al. Geotechnical Problems and Treatments of Weathered Rock Seams Occurring in the Foundation of Karjan Dam, Western India
SU1164368A1 (en) Method of protecting structures against falling-through
SU1514860A1 (en) Method of erecting earth dam on alluvia-covered rock bed
SU1211379A1 (en) Method of constructing dam in presence of landslide hazard
SU1749354A1 (en) Device for protecting dam foundation from demolition