SU1571181A1 - Method of mounting tower structure - Google Patents
Method of mounting tower structure Download PDFInfo
- Publication number
- SU1571181A1 SU1571181A1 SU874328818A SU4328818A SU1571181A1 SU 1571181 A1 SU1571181 A1 SU 1571181A1 SU 874328818 A SU874328818 A SU 874328818A SU 4328818 A SU4328818 A SU 4328818A SU 1571181 A1 SU1571181 A1 SU 1571181A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- ring
- elements
- block
- shell
- frame
- Prior art date
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Изобретение относитс к строительству, преимущественно градирен. Цель изобретени - упрощение монтажа и сокращение трудозатрат. После устройства фундамента 1, чаши 2 и пилона 3 устанавливают на пилоне монтажное кольцо, монтируют на него наклонные элементы, устанавливают на наклонные элементы верхнее кольцо 7 и прикрепл ют к верхнему кольцу элементы сети 8, далее производ т заплетение меридиональных 10 и диагональных элементов 9 до промежуточного кольца с возможностью перемещени элементов в их плоскости, монтируют промежуточное кольцо и закрепл ют на нем элементы сети, осуществл ют преднапр жение верхней части оболочки массой промежуточного кольца и монтаж обшивки, затем осуществл ют по русный подъем собранного укрупненного блока 16 с одновременным заплетением элементов сети нижней части блока, монтаж вертикальных стоек 18 воздуховодного отверсти и опалубочных блок-форм 19 нижнего кольца, размещенных на стойках, далее осуществл ют подъем оболочки в проектное положение с закреплением блок-форм 19 на стойках, укладывают бетонную смесь в блок-формы нижнего кольца, осуществл ют преднапр жение оболочки массой нижнего кольца 19 и производ т монтаж обшивки нижней части оболочки. 1 з.п. ф-лы, 4 ил.The invention relates to the construction, mainly cooling towers. The purpose of the invention is to simplify installation and reduce labor costs. After the foundation 1, the bowl 2 and the pylon 3 are installed, a mounting ring is installed on the pylon, inclined elements are mounted on it, the upper ring 7 is mounted on the inclined elements and network elements 8 are attached to the upper ring, then the meridional 10 and diagonal elements 9 are braided to the intermediate ring with the ability to move elements in their plane, assemble the intermediate ring and secure the network elements on it, preload the upper part of the shell with the intermediate ring and mount the casing and then carry out a continuous lifting of the assembled enlarged block 16 with simultaneous braiding the network elements of the lower part of the block, mounting the vertical pillars 18 of the air outlet hole and formwork block forms 19 of the lower ring placed on the racks, then lifting the casing to the design position with fixing block molds 19 on racks, lay the concrete mix in the block molds of the lower ring, preload the shell with a mass of the lower ring 19, and mount the lower part of the shell. 1 hp f-ly, 4 ill.
Description
Изобретение относитс к строительству и может быть использовано при возведении винтовых башенных сооружений, преимущественно оболочек градирен.The invention relates to the construction and can be used in the construction of screw tower structures, mainly the shells of the cooling towers.
Цель изобретени - упрощение монтажа и сокращение трудозатрат.The purpose of the invention is to simplify installation and reduce labor costs.
На фиг. 1 изображена схема монтажа укрупненного блока, включающего наклонные элементы, монтажное, верхнее, промежуточное кольца и обшивку; на фиг. 2 - подъем укрупненного блока и одновременный монтаж стоек воздухопропускного проема и опалубочных блок-форм нижнего кольца; на фиг. 3 - закрепление элементов ванто- вой сети к промежуточному кольцу, по рус- ный подъем оболочки и заплетение элементов сети; на фиг. 4 - подъем оболочки в проектное положение, бетонирование нижнего кольца, преднапр жение оболочки массой нижнего кольца и монтаж обшивки с переставных монтажных подмостей.FIG. 1 shows a diagram of the assembly of the enlarged block, including inclined elements, mounting, upper, intermediate rings and plating; in fig. 2 - raising the enlarged block and simultaneous installation of the racks of the air passage and the formwork blocks of the lower ring; in fig. 3 - fastening of the elements of the mains network to the intermediate ring, along the Russian lifting of the shell and braiding the network elements; in fig. 4 - lifting the casing to the design position, concreting the lower ring, preloading the casing with the mass of the lower ring, and mounting the casing with a movable mounting platform.
Способ монтажа башенного сооружени , преимущественно оболочки градирни, включает одновременное возведение фундаментов 1, чаши 2 и пилона 3, установку монтажного кольца 4 и фиксацию последнего на пилоне на уровне днища чаши 2. Затем монтируют с помощью грузоподъемного механизма 5 наклонные элементы 6, на которые, в свою очередь, устанавливают секции верхнего кольца 7. К последнему прикрепл ют винтовую сеть 8, включающую диагональные 9 и меридиональные 10 элементы, производ т их заплетение до промежуточного кольца 1 1 и закрепл ют на последнем, далее ван- товую сеть 8 преднапр гают за счет массы промежуточного кольца 11 и монтируют обшивку 12 между верхним 7 и промежуточным 11 кольцами. После чего устанавливают такелажную оснастку, включающую полиспасты 13 и лебедки 14. Полиспасты 13 закрепл ют вверху пилона через монтажный оголовок 15 и осуществл ют подъем собранного на уровне днища чаши 2 укрупненного блока 16 с одновременным заплетением вантовой сети 8 нижней части оболочки до уровн , обеспечивающего установку и закрепление расчалок 17 на период монтажаThe method of mounting the tower structure, mainly the tower of the cooling tower, includes the simultaneous erection of foundations 1, bowl 2 and pylon 3, installation of the mounting ring 4 and fixing the latter on the pylon at the level of the bottom of the bowl 2. Then install inclined elements 6 with the help of a lifting mechanism 5, in turn, they install sections of the upper ring 7. A screw network 8 is attached to the latter, including diagonal 9 and meridional 10 elements, they are braided to intermediate ring 1 1 and fixed on the last m, then the cable network 8 is pre-loaded due to the mass of the intermediate ring 11 and the casing 12 is mounted between the upper 7 and intermediate 11 rings. Then install the rigging equipment, including the tackles 13 and winch 14. The tackles 13 are fixed at the top of the pylon through the mounting tip 15 and lift assembled at the level of the bottom of the bowl 2 of the enlarged block 16 with simultaneous braiding of the cable network 8 of the lower part of the shell to the level ensuring installation and fixing braces 17 for the installation period
оболочки. Одновременно осуществл ют монтаж стоек воздуховходного отверсти 18 и сбоку на них на уровне фундамента 1 опалубочных блок-форм нижнего кольда 19. Далее производ т подъем оболочки в проектное положение с закреплением опа лубочных блок-форм 19 на стойках 18 и выполн ют преднапр жение оболочки за счет массы бетона, уложенного в опалубочные блок-формы 19 с помощью бадьи 20. Затемshell. At the same time, the mounting of the posts of the air inlet 18 and sideways on them at the foundation 1 of the shuttering block forms of the lower colds 19 are carried out. the account of the mass of concrete laid in the formwork block 19 using the tub 20. Then
производ т монтаж обшивки 12 нижней части оболочки между промежуточным 11 и нижним 19 кольцами и монтажных подмостей 21.made the installation of the casing 12 of the lower part of the shell between the intermediate 11 and the lower 19 rings and the mounting platform 21.
Применение предложенного способа вThe application of the proposed method in
строительстве позвол ет упростить монтаж и значительно сократить сроки монтажа башенных сооружений.construction allows to simplify installation and significantly reduce the time of installation of tower structures.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874328818A SU1571181A1 (en) | 1987-11-16 | 1987-11-16 | Method of mounting tower structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874328818A SU1571181A1 (en) | 1987-11-16 | 1987-11-16 | Method of mounting tower structure |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1571181A1 true SU1571181A1 (en) | 1990-06-15 |
Family
ID=21336541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU874328818A SU1571181A1 (en) | 1987-11-16 | 1987-11-16 | Method of mounting tower structure |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1571181A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2648740C2 (en) * | 2016-03-15 | 2018-03-28 | Алексей Анатольевич Ладнушкин | Method of disassembly and assembly of structures inside metallic cooling towers without crane |
-
1987
- 1987-11-16 SU SU874328818A patent/SU1571181A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 1032151, кл. Е 04 Н 5/12, 1982. Патент US № 3945106, кл. Е 04 В 1/00, 1976. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2648740C2 (en) * | 2016-03-15 | 2018-03-28 | Алексей Анатольевич Ладнушкин | Method of disassembly and assembly of structures inside metallic cooling towers without crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3299588A (en) | Multilevel building structure with plural suspended revolving compartment units and method of making same | |
SU1571181A1 (en) | Method of mounting tower structure | |
CN109944324A (en) | Steel concrete combo box trestle and the combination assembled structural system of reinforced concrete frame column | |
RU2032047C1 (en) | Building skeleton erection method | |
JPH01256636A (en) | Construction method of building | |
SU1744227A1 (en) | Method for erection of cooling tower | |
SU953159A1 (en) | Guy-rope cooling tower | |
RU2385994C1 (en) | Foundation | |
SU1006684A1 (en) | Guy rope cooling tower | |
RU2017916C1 (en) | Cooling tower and method for its erection | |
SU1705485A1 (en) | Method of building subsurface structures of reservoir hydroelectric | |
RU2781984C1 (en) | Single-belt cable-stayed building structure | |
SU1033677A1 (en) | Method of erecting ferroconcrete cooling tower | |
RU176337U1 (en) | FORMWORK CONCRETE FOR BRACKET OF INTERMEDIATE BRIDGE SUPPORT | |
SU755968A1 (en) | Method of erecting multistorey building with suspended storeys | |
SU659709A1 (en) | Device for erecting tall structures from monolithic reinforced concrete | |
RU2097513C1 (en) | Process of erection of superstructure of building | |
SU1201468A1 (en) | Guy-rope cooling tower | |
SU1189966A1 (en) | Method of constructing building skeleton | |
SU1629438A1 (en) | Method for construction of in-situ reinforced concrete shells | |
SU927889A1 (en) | Connection assembly between crossbar and bridge pier post | |
SU1074982A1 (en) | Sliding forms | |
RU2046908C1 (en) | Method for building reconstruction and superstructing | |
SU838008A1 (en) | Method of erecting a post-type foundation | |
SU1011836A1 (en) | Forms for concrete walls |