RU2097513C1 - Process of erection of superstructure of building - Google Patents
Process of erection of superstructure of building Download PDFInfo
- Publication number
- RU2097513C1 RU2097513C1 RU95116606/03A RU95116606A RU2097513C1 RU 2097513 C1 RU2097513 C1 RU 2097513C1 RU 95116606/03 A RU95116606/03 A RU 95116606/03A RU 95116606 A RU95116606 A RU 95116606A RU 2097513 C1 RU2097513 C1 RU 2097513C1
- Authority
- RU
- Russia
- Prior art keywords
- building
- superstructure
- floor
- supports
- tent
- Prior art date
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
Description
Изобретение относится к области строительства и может быть использовано при реконструкции домов с увеличением этажности без отселения жильцов. The invention relates to the field of construction and can be used in the reconstruction of houses with an increase in the number of storeys without resettlement of residents.
Известен способ ведения строительных работ, в процессе которых требуется защита от атмосферных воздействий, например, ведение арматурных и бетонных работ в тепляках при строительстве железобетонных вытяжных труб [1] Такие тепляки крепят на самоподъемном кране, обеспечивающем перемещение лесов, тепляка и опалубки по мере бетонирования трубы. There is a method of conducting construction work, in the process of which protection from atmospheric influences is required, for example, reinforcing and concrete work in greenhouses during the construction of reinforced concrete exhaust pipes [1] Such greenhouses are mounted on a self-elevating crane that moves scaffolding, greenhouse and formwork as the concrete is concreted .
Наиболее близким к предлагаемому способу является способ реконструкции доменного цеха [2] Этот способ позволяет проводить работы по реконструкции сооружений основного производства под защитой шатра, смонтированного на временных опорах, установленных рядом с существующими колоннами реконструируемого здания. К недостаткам такого способа можно отнести необходимость применения тяжелого кранового оборудования, а также потребность в дополнительных площадях за пределами реконструируемого цеха. Closest to the proposed method is a method of reconstruction of a blast furnace workshop [2] This method allows reconstruction of the main production facilities under the protection of a tent mounted on temporary supports installed next to the existing columns of the reconstructed building. The disadvantages of this method include the need for heavy crane equipment, as well as the need for additional space outside the reconstructed workshop.
Цель изобретения повышение надежности защиты надстраиваемого здания от атмосферных воздействий, сокращение сроков и упрощение возведения надстройки. The purpose of the invention is to increase the reliability of protection of the building to be built-in against atmospheric influences, shorten the time and simplify the construction of the superstructure.
Поставленная задача решается таким образом, что в способе возведения надстройки здания, включающем устройство шатра над существующим зданием, с опиранием его на установленные временные опоры, разборку крыши, возведение стен на высоту надстраиваемого этажа, устройство перекрытия и демонтаж шатра и временных опор, согласно изобретения, предварительно в крыше здания устраивают горизонтальную часть опоры в пределах оконного проема надстраиваемого этажа, нижнюю вертикальную часть внутри здания с опиранием на существующее перекрытие, а верхнюю вертикальную часть за пределами здания, фиксируют опоры раскосными элементами, закрепляя их к опорам в пределах оконного проема надстраиваемого этажа, после чего осуществляют устройство шатра. The problem is solved in such a way that in the method of erecting a building superstructure, including the installation of a tent over an existing building, relying on established temporary supports, disassembling the roof, erecting walls to the height of the built-up floor, device for overlapping and dismantling the tent and temporary supports, according to the invention, previously, the horizontal part of the support is arranged in the roof of the building within the window opening of the superstructure floor, the lower vertical part inside the building is supported by the existing floor, and hnyuyu vertical part outside the building, fixed support truss members, fixing them to the supports within the window opening to overbuild the floor, after which the device is carried out tent.
Предлагаемый способ отличается от известного тем, что предварительно в крыше устраивают отверстия, в которые устанавливают временные коленообразные опоры с опиранием на существующее перекрытие. Форма опор обеспечивает возможность размещения верхней части опоры за пределами здания и устройство шатра над зданием с навесом, а нижней частью опоры опереться на существующее перекрытие, что позволяет вести работы по реконструкции крыши, возведению стен и другие монтажные работы по надстройке здания без отселения жильцов. Кроме того, предлагаемый способ отличается тем, что горизонтальную часть опоры размещают в пределах оконного проема надстраиваемого этажа, а опоры фиксируют раскосными элементами, закрепляя их к опорам также в пределах оконного проема надстраиваемого этажа, что исключает необходимость устройства дополнительных проемов в надстройке. Таким образом, предлагаемая последовательность операций использования коленообразных опор позволяет повысить надежность защиты и упростить монтаж надстройки за счет возможности устройства шатра за пределами здания с размещением его опоры внутри здания с опиранием на существующее перекрытие, при этом исключить затраты на образование дополнительных монтажных проемов. The proposed method differs from the known one in that preliminary, holes are arranged in the roof in which temporary knee-shaped supports are mounted with the support on the existing floor. The shape of the supports makes it possible to place the upper part of the support outside the building and the tent to be installed above the building with a canopy, and the lower part of the support to lean on the existing floor, which allows reconstruction of the roof, erection of walls and other installation work on the building superstructure without resettling residents. In addition, the proposed method is characterized in that the horizontal part of the support is placed within the window opening of the superstructure floor, and the supports are fixed with diagonal elements, fixing them to the supports also within the window opening of the superstructure floor, which eliminates the need for additional openings in the superstructure. Thus, the proposed sequence of operations using knee-shaped supports allows to increase the reliability of protection and simplify the installation of the superstructure due to the possibility of installing the tent outside the building with the placement of its support inside the building based on the existing floor, while eliminating the cost of creating additional mounting openings.
На чертеже изображено здание в период надстройки, поперечный разрез верхнего этажа с покрытием. The drawing shows a building during the superstructure, a cross section of the top floor with a coating.
Способ осуществляют в следующей последовательности. The method is carried out in the following sequence.
В существующей крыше 1 вдоль стен 2 существующего здания устраивают отверстия 3 соосно оконным проемам 4 в стенах 5 надстраиваемого этажа. In the existing roof 1, along the walls 2 of the existing building, holes 3 are arranged coaxially with the window openings 4 in the walls 5 of the superstructure floor.
Под отверстиями расчищают участки поверхности покрытия 6, на которые устанавливают коленообразные опоры 7 вплотную к стенам 2 (парапетам) и закрепляют захватами и раскосными элементами 8 к конструкциям крыши 1, при этом раскосные элементы 8 крепят к опорам 7 в пределах высоты оконных проемов 4 надстраиваемого этажа. После чего на опорах 7 монтируют шатер 9. Вдоль стен 5 навешивают дождезащитную сетку 10. Under the holes, clear sections of the surface of the coating 6, on which the knee-shaped supports 7 are mounted close to the walls 2 (parapets) and are fixed with grippers and diagonal elements 8 to the roof structures 1, while the diagonal elements 8 are attached to the supports 7 within the height of the window openings 4 of the superstructure floor . After that, the tent 9 is mounted on the supports 7. A rainproof mesh 10 is hung along the walls 5.
По окончании монтажа шатра 9 производят кладку стен 5, бетонируют покрытие 11 надстраиваемого этажа и устраивают новую крышу 11 либо монтируют защитный шатер следующего надстраиваемого этажа по аналогичной схеме. После бетонирования покрытия и устройства крыши шатер и опоры демонтируют и разбирают старую крышу 1. At the end of the installation of the tent 9, the walls 5 are laid, the cover 11 of the superstructure floor is concreted and a new roof 11 is built, or the protective tent of the next superstructure floor is mounted in the same way. After concreting the coatings and the roof device, the tent and supports dismantle and disassemble the old roof 1.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU95116606/03A RU2097513C1 (en) | 1995-09-29 | 1995-09-29 | Process of erection of superstructure of building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU95116606/03A RU2097513C1 (en) | 1995-09-29 | 1995-09-29 | Process of erection of superstructure of building |
Publications (2)
Publication Number | Publication Date |
---|---|
RU95116606A RU95116606A (en) | 1997-09-27 |
RU2097513C1 true RU2097513C1 (en) | 1997-11-27 |
Family
ID=20172401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU95116606/03A RU2097513C1 (en) | 1995-09-29 | 1995-09-29 | Process of erection of superstructure of building |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2097513C1 (en) |
-
1995
- 1995-09-29 RU RU95116606/03A patent/RU2097513C1/en not_active IP Right Cessation
Non-Patent Citations (1)
Title |
---|
1. Дубровский В.Б. и др. Строительство атомных электростанций. - М.: Энергоиздат, 1985, с.90 и 91. 2. SU, авторское свидетельство, 1249133, кл.E 04G 23/00, 1986. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2097513C1 (en) | Process of erection of superstructure of building | |
CN110388096A (en) | A kind of structure and construction method flexibly constructed about coke oven booth | |
CN216787874U (en) | Large-scale ring type truss hoisting structure in large-span high altitude | |
RU97112739A (en) | METHOD FOR RECONSTRUCTION OF A MULTI-STOREY RESIDENTIAL HOUSE | |
KR20210068283A (en) | Structural Systems and Methods for Floor Structural Work in Elevator Machine Room of Apartment Housing | |
RU2032047C1 (en) | Building skeleton erection method | |
JP2621748B2 (en) | All-weather temporary shed | |
RU2368747C2 (en) | Method for erection of prefabricated roof of attic type | |
JPH0833032B2 (en) | Construction method of building frame | |
SU1661335A1 (en) | Method of constructing ferroconcrete vaults on pneumatic formwork | |
RU2085679C1 (en) | Method for reconstruction of building | |
CN114197633B (en) | Construction method of large-span high-altitude annular truss lifting and mounting structure | |
SU1008391A1 (en) | Method for erecting building with cantilevered floors | |
RU2312960C1 (en) | Method to erect additional stories for building reconstruction | |
RU2101437C1 (en) | Method for reconstruction of building | |
SU838008A1 (en) | Method of erecting a post-type foundation | |
RU2122092C1 (en) | Building with superstructure of mansard type and method of superstructure of buildings with rooms of mansard type | |
RU2052052C1 (en) | Method for installing floors in many-storied blocks of flats by lifting | |
RU2379436C1 (en) | Method for slab installation | |
RU2338843C1 (en) | Method of multistorey building carcassing | |
SU614202A1 (en) | Falsework for coverings | |
SU1004576A1 (en) | Method of erecting a building | |
RU2308586C1 (en) | Method for additional residential building story erection | |
RU2119028C1 (en) | Method for erection of building covering by raising procedure | |
JP2876991B2 (en) | Steel frame method for high-rise buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20050930 |