SU1550156A1 - Hauling arrangement - Google Patents

Hauling arrangement Download PDF

Info

Publication number
SU1550156A1
SU1550156A1 SU874368469A SU4368469A SU1550156A1 SU 1550156 A1 SU1550156 A1 SU 1550156A1 SU 874368469 A SU874368469 A SU 874368469A SU 4368469 A SU4368469 A SU 4368469A SU 1550156 A1 SU1550156 A1 SU 1550156A1
Authority
SU
USSR - Soviet Union
Prior art keywords
plates
drainage
lining
pressure
tunnel
Prior art date
Application number
SU874368469A
Other languages
Russian (ru)
Inventor
Владимир Ефимович Берштейн
Бронислав Борисович Агранов
Марк Григорьевич Званский
Original Assignee
Тындинская мерзлотная станция Всесоюзного научно-исследовательского института транспортного строительства
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Тындинская мерзлотная станция Всесоюзного научно-исследовательского института транспортного строительства filed Critical Тындинская мерзлотная станция Всесоюзного научно-исследовательского института транспортного строительства
Priority to SU874368469A priority Critical patent/SU1550156A1/en
Application granted granted Critical
Publication of SU1550156A1 publication Critical patent/SU1550156A1/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Изобретение относитс  к транспортным сооружени м, в частности к тоннел м (Т), расположенным в районах с суровым климатом. Цель - повышение эксплуатационной надежности путем снижени  попадани  грунтовой воды в Т. Транспортное сооружение включает Т 1, к которому прилегают заобделочные дренирующие элементы в виде бетонных плит 2. Последние имеют вертикальные и горизонтальные сообщающиес  пазы 3, расположенные со стороны Т 1. Пазы 3 св заны водоводом 4 из сло  материала с высоким коэффициентом фильтрации с дренажными трубами (ДТ) 5, расположенными за обделкой Т 1. Плиты 2 расположены между собой с зазорами и св заны грунтонепроницаемыми фильтрами 6. Водовод 4 размещен между нижними р дами плит 2 и ДТ 5. При образовании в грунте, прилегающем к плитам 2, льда давление в незамерзшей воде не поднимаетс , так как она проходит в ДТ 5. В св зи с отсутствием давлени  в воде, протекающей по пазам, она не будет разрывать гидроизол цию и оказывать дополнительное давление на Т 1. 3 ил.The invention relates to transportation structures, in particular to tunnels (T), located in areas with a harsh climate. The goal is to increase operational reliability by reducing the ingress of groundwater into T. The transport structure includes T 1, to which end sealing drain elements in the form of concrete slabs 2 fit. The latter have vertical and horizontal connected grooves 3 located on the T 1 side. conduit 4 of a layer of material with a high filtration coefficient with drainage pipes (DT) 5, located behind the lining T 1. Plates 2 are interconnected with gaps and connected by ground-proof filters 6. Vodovod 4 is placed between the lower rows of plates 2 and DT 5. When ice is formed in the soil adjacent to plates 2, the pressure in unfrozen water does not rise, as it passes in DT 5. Due to the lack of pressure in the water flowing through the grooves, it will not break the insulation and put additional pressure on T 1. 3 Il.

Description

Редактор М0ПетроваEditor M0Petrova

Составитель Н„КононоваCompiled by N. Kononov

Техред Л.Сердюкова Корректор С.ЧерниTehred L. Serdyukova Proofreader S. Cherni

Заказ 256Order 256

Тираж 386Circulation 386

.ВНИИПИ Государственного комитета по изобретени м и открыти м при ГКНТ СССР 113035, Москва, Ж-35, Раушска  наб., д. 4/5VNIIPI State Committee for Inventions and Discoveries at the State Committee on Science and Technology of the USSR 113035, Moscow, Zh-35, 4/5 Raushsk nab.

ПодписноеSubscription

Claims (1)

Формула изобретенияClaim I 'I ' Транспортное сооружение, включающее тоннель с обделкой, заобделочные дренирующие элементы, дренажные трубы, отличающееся тем, что, с целью повышения эксплуатацион· ной надежности путем снижения попадания грунтовой воды в тоннель, заобделочные дренирующие элементы выполнены в виде бетонных плит, имею-,.· щих сообщающиеся вертикальные^ горизонтальные пазы, которые расположены со стороны обделки тоннеля и 40 связаны посредством водоотвода из слоя материала с высоким коэффициентом фильтрации с дренажными трубами, которые расположены за обделкой тоннеля, при этом пЛиты установлены 45 между собой с зазорами и связаны посредством грунтонепроницаемых фильтров, а водоотвод расположен между нижними рядами плит и дренажными трубами.A transport structure, including a tunnel with lining, lining drainage elements, drainage pipes, characterized in that, in order to increase operational reliability by reducing the ingress of groundwater into the tunnel, the lining drainage elements are made in the form of concrete slabs having interconnected vertical ^ horizontal grooves that are located on the side of the lining of the tunnel and 40 are connected by drainage from a layer of material with a high filtration coefficient to drainage pipes that are located behind background tunnel, the cooker set 45 with gaps between them and are connected by gruntonepronitsaemyh filter and drainage is located between the lower row of plates and drainage pipes. Б-БBb
SU874368469A 1987-11-19 1987-11-19 Hauling arrangement SU1550156A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874368469A SU1550156A1 (en) 1987-11-19 1987-11-19 Hauling arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874368469A SU1550156A1 (en) 1987-11-19 1987-11-19 Hauling arrangement

Publications (1)

Publication Number Publication Date
SU1550156A1 true SU1550156A1 (en) 1990-03-15

Family

ID=21351643

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874368469A SU1550156A1 (en) 1987-11-19 1987-11-19 Hauling arrangement

Country Status (1)

Country Link
SU (1) SU1550156A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102678174A (en) * 2012-05-28 2012-09-19 中交第一公路勘察设计研究院有限公司 Tunnel drainage system passing through permafrost region and non-frozen ground region and arrangement method thereof
WO2021227383A1 (en) * 2020-05-11 2021-11-18 中铁一局集团有限公司 Method for treating tunnel leakage water in alpine region

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 785525, кл. Е 21 F 16/02, 1979. *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102678174A (en) * 2012-05-28 2012-09-19 中交第一公路勘察设计研究院有限公司 Tunnel drainage system passing through permafrost region and non-frozen ground region and arrangement method thereof
CN102678174B (en) * 2012-05-28 2015-03-18 中交第一公路勘察设计研究院有限公司 Arrangement method of tunnel drainage system passing through permafrost region and non-frozen ground region
WO2021227383A1 (en) * 2020-05-11 2021-11-18 中铁一局集团有限公司 Method for treating tunnel leakage water in alpine region

Similar Documents

Publication Publication Date Title
WO2021109537A1 (en) Ultra-long tunnel sewage disposing and separation drainage structure suitable for cold regions
CN101435342B (en) Tunnel ring direction drainpipe equipped with strip heat-insulating layer
KR101172504B1 (en) Concrete track for rail vehicles
CN108757027B (en) Multifunctional drainage system in tunnel
SU1550156A1 (en) Hauling arrangement
CN110792473A (en) Three-hole tunnel drainage system for centralized drainage by using service tunnel
CN112228151A (en) Tunnel open cut tunnel water drainage system
RU2303675C1 (en) Culvert structure for road embankment erected on permafrost ground
CN211474180U (en) Three-hole tunnel drainage system for centralized drainage by using service tunnel
CN110529180A (en) A kind of tunnel meeting high environmental requirement, which is removed contamination, separates gutter
CN110821515B (en) Construction method of assembled supporting structure of tunnel in high and cold area
SU1486558A1 (en) Freezing system of earth-fill dam
RU2767636C1 (en) Drainage system in road excavation of tunnel type on permafrost
RU2382139C1 (en) Riverbed-diversion structure of seasonal waterway on permafrost
SU1341319A1 (en) Water conducting arrangement
CN216950477U (en) Tunnel buries central ditch supporting construction deeply
CN112648011A (en) Siphon rapid drainage anti-crystallization blind pipe and installation method thereof
CN113832793B (en) Roadbed freezing and thawing prevention and control method and structure
CN217129559U (en) Water-proof and drainage-integrated-mode-based water-proof and drainage plate for tunnel
RU2007512C1 (en) Earth dam with frozen curtain in body and foundation
SU1350262A1 (en) Channel for underground laying of pipe lines
KR100465463B1 (en) Watercourse retaining wall of precast concrete
KR830001522Y1 (en) Water leak and freeze protection pipe in tunnel
RU2151232C1 (en) Method of control of ice coating in permafrost regions with little snow (versions)
JPH04136333A (en) Rainwater storage and infiltration device