CN112648011A - Siphon rapid drainage anti-crystallization blind pipe and installation method thereof - Google Patents

Siphon rapid drainage anti-crystallization blind pipe and installation method thereof Download PDF

Info

Publication number
CN112648011A
CN112648011A CN202110097617.XA CN202110097617A CN112648011A CN 112648011 A CN112648011 A CN 112648011A CN 202110097617 A CN202110097617 A CN 202110097617A CN 112648011 A CN112648011 A CN 112648011A
Authority
CN
China
Prior art keywords
blind pipe
drainage
crystallization
siphon
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110097617.XA
Other languages
Chinese (zh)
Inventor
阳作亮
刘向东
吴挺鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Hetuo Civil Engineering Co ltd
Original Assignee
Chengdu Hetuo Civil Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hetuo Civil Engineering Co ltd filed Critical Chengdu Hetuo Civil Engineering Co ltd
Priority to CN202110097617.XA priority Critical patent/CN112648011A/en
Publication of CN112648011A publication Critical patent/CN112648011A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/381Setting apparatus or devices

Abstract

The invention relates to a siphon rapid drainage crystallization-prevention blind pipe and an installation method thereof, wherein the blind pipe is hollow, and a drainage groove (1) is formed in the surface of the blind pipe. The width of the drainage channel (1) is larger than the diameter of the hollow hole (2) on the blind pipe, so that large-particle impurities can be discharged through the drainage channel (1). And after the flow velocity of the water flow is improved, the driving force to the granular impurities is large, and the condition that the granular impurities block the hollow holes (2) of the blind pipe can be reduced.

Description

Siphon rapid drainage anti-crystallization blind pipe and installation method thereof
Technical Field
The invention relates to the technical field of blind pipe construction, in particular to a siphon rapid drainage crystallization-prevention blind pipe and an installation method thereof.
Background
The blind pipe is a drainage pipeline in the tunnel, and the tunnel is positioned in a mountain or underground in a city, so that water always permeates downwards in the mountain at the top of the tunnel, and the underground water such as rainwater also permeates downwards in the city. When a lining of the tunnel, which is in contact with rock strata around the tunnel, is broken, water flow accumulated at the top of the tunnel enters the lining, and the blind pipe plays a role in draining water. The blind pipe is usually for the material that permeates water makes or set up by hollow out construction on the blind pipe surface, be that the blind pipe optional position can both absorb water and with water downstream to prevent that ponding from gathering at the tunnel top, finally lead to tunnel top ponding too much and the problem of leaking. The water flow velocity in the blind pipe is limited, and a lot of impurities are necessarily carried along with the seepage of water in the stratum. When water flows into the blind pipe, calcium or other elements in the water are condensed due to low flow velocity, the driving force for granular impurities is small, the condensed crystals or the granular impurities which cannot be taken away are easy to cause blockage of the blind pipe, and therefore the hydrophobic capacity of the blind pipe is reduced. For example, the patent of invention with application number 201810494444.3 and named as a tunnel lining structure three-dimensional waterproof and drainage system is provided with a complex three-dimensional drainage system for preventing white crystalline objects from appearing on annular blind pipes and longitudinal blind pipes, although the three-dimensional drainage structure can play a certain anti-crystallization effect and prolong the crystallization forming speed, the whole structure is complex, and the construction workload is increased. And a common blind pipe drainage mode is adopted, when the crystallization or granular impurities in the blind pipe are accumulated to a certain degree, the blind pipe is blocked, and the blind pipe cannot achieve the drainage effect.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide a blind pipe which accelerates the flow rate of permeate water through a siphon principle so as to reduce the condensation of scale and the blockage of impurities.
The purpose of the invention is realized by the following technical scheme: a siphon rapid drainage anti-crystallization blind pipe and an installation method thereof are provided, wherein the blind pipe is hollow, and a drainage groove is arranged on the surface of the blind pipe. The blind pipe of fretwork form can follow the arbitrary department of lateral wall and absorb the water of infiltration play, and the water drainage tank has then formed the direct passageway that flows downwards of messenger's water, and water when to the downthehole infiltration of fretwork, belongs to horizontal infiltration or downward infiltration to one side basically, and the shape in fretwork hole is crooked irregular, can restrict the speed of rivers, and the reduction of water velocity produces the crystallization more easily, also causes the jam of graininess impurity more easily. Therefore when the water that permeates down gets into water drainage tank, can follow water drainage tank direct downward flow, under the state that rivers continue downward flow, can produce the siphon effect in the water drainage tank, make the water of the broken department of a lining flow to water drainage tank more for the speed of walking away of rivers, rise when the flow rate of rivers, the material in the aquatic is difficult to condense and forms the crystallization, and granular material is taken away more easily. Thereby achieving the purposes of reducing the crystallization efficiency and prolonging the practical service life of the blind pipe.
Preferably, the drainage channel is arranged along the axial direction of the blind pipe, and two ends of the drainage channel are communicated with two end faces of the blind pipe. A blind pipe can be provided with a plurality of drainage grooves, so that the drainage effect is improved.
Preferably, the width of the drainage channel is larger than the diameter of the hollow hole on the blind pipe.
Preferably, the depth of the drainage groove is greater than the diameter of the hollow hole in the blind pipe.
Preferably, the cross section of the drainage channel is rectangular.
The installation method of the siphon rapid drainage anti-crystallization blind pipe comprises the following steps:
s1, spraying slurry to the inner wall of the tunnel to form a lining in the tunnel;
s2, after a lining is formed, arranging the blind pipes from the vault of the tunnel to two sides, and fixing the blind pipes on the inner wall of the lining; and make a water drainage tank paste on a lining inner wall, when a lining appears the breakage, hydroenergy can directly get into the water drainage tank in, reaches the effect of quick drainage.
S3, fixing a waterproof plate, wherein the blind pipe is positioned between a lining and the waterproof plate;
and S4, spraying again to form a second lining on the inner wall of the waterproof board.
The invention has the following advantages:
utilize the siphon principle for the efficiency of blind pipe drainage to the mode that increases the velocity of water flow has reduced the probably that the infiltration water condenses, has avoided appearing a large amount of crystallization in the blind pipe and has leaded to the problem of blind pipe jam. And after the velocity of water flow is improved, the driving force to granular impurities is large, and the condition that the granular impurities block the hollow holes of the blind pipes can be reduced.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a top view of the present invention;
in the figure: 1-drainage groove and 2-hollow hole.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following.
As shown in figures 1-2, the siphon rapid drainage crystallization-prevention blind pipe and the installation method thereof are characterized in that the blind pipe is hollow, and a drainage groove 1 is arranged on the surface of the blind pipe. The blind pipe of fretwork form can follow the arbitrary department of lateral wall and absorb the water of infiltration, and water drainage tank 1 has then formed the direct passageway that flows downwards of messenger's water, and when water permeates to fretwork hole 2, belongs to horizontal infiltration or downward infiltration to one side basically, and the shape of fretwork hole 2 is crooked irregularly, can restrict the speed of rivers, and the reduction of water velocity produces the crystallization more easily, also causes the jam of granular impurity more easily. Therefore when water under the infiltration gets into water drainage tank 1, can follow water drainage tank 1 and directly flow downwards, under the state that rivers continue to flow downwards, can produce the siphon effect in water drainage tank 1, make the water of the broken department of a lining more flow to water drainage tank 1 for the speed of walking away of rivers, flow speed when rivers rises, and the material in the aquatic is difficult to condense and forms the crystallization, and granular material is taken away more easily. Thereby achieving the purposes of reducing the crystallization efficiency and prolonging the practical service life of the blind pipe.
Preferably, the drainage channel 1 is arranged along the axial direction of the blind pipe, and two ends of the drainage channel 1 are communicated with two end faces of the blind pipe. A blind pipe can be provided with a plurality of drainage channels 1, so that the drainage effect is improved.
Preferably, the width of the drainage channel 1 is larger than the diameter of the hollow hole 2 on the blind pipe.
Preferably, the depth of the drainage channel 1 is greater than the diameter of the hollow hole 2 on the blind pipe.
Preferably, the cross section of the drainage channel 1 is rectangular.
The installation method of the siphon rapid drainage anti-crystallization blind pipe comprises the following steps:
s1, spraying slurry to the inner wall of the tunnel to form a lining in the tunnel;
s2, after a lining is formed, arranging the blind pipes from the vault of the tunnel to two sides, and fixing the blind pipes on the inner wall of the lining; and make a water drainage tank 1 paste on a lining inner wall, appear broken when one lining, hydroenergy can directly get into water drainage tank 1 in, reach the effect of quick drainage.
S3, fixing a waterproof plate, wherein the blind pipe is positioned between a lining and the waterproof plate;
and S4, spraying again to form a second lining on the inner wall of the waterproof board.
The blind pipe is located between waterproof board and the lining, and the waterproof board outside guniting forms two linings, therefore the blind pipe itself is located inclosed space, receives mountain ridge deformation or other reasons to destroy the back as a lining, and rivers in the mountain ridge get into a lining, then contact with the blind pipe and discharge the infiltration water to the bottom of tunnel both sides by the blind pipe, prevent tunnel top ponding. When the blind pipe drains, the permeate water is mainly discharged through the water discharge groove 1, and the water discharge groove 1 provides a direct downward flow passage, so that the permeate water can flow rapidly. Just because the blind pipe is in the enclosed space, the flow of water flow will cause the pressure above the water drainage channel 1 to decrease, creating a siphon effect, and promoting other permeate water entering a liner to flow towards the water drainage channel 1, thus being quickly discharged from the water drainage channel 1. Under the condition of large water flow velocity, substances in water are not easy to condense, and the possibility of crystallization is greatly reduced. Meanwhile, the flow velocity of water flow is high, granular impurities can be driven to directly flow away, and blockage in a blind pipe cannot be caused. For impurities which cannot enter the drainage channel 1, the inside of the blind pipe cannot be blocked naturally.

Claims (6)

1. The utility model provides a crystallization-proof blind pipe is prevented in quick drainage of siphon, the blind pipe is fretwork form, its characterized in that: and a drainage groove (1) is formed in the surface of the blind pipe.
2. The siphon rapid drainage anti-crystallization blind pipe as claimed in claim 1, wherein: the water drainage tank (1) is arranged along the axial direction of the blind pipe, and two ends of the water drainage tank (1) are communicated with two end faces of the blind pipe.
3. The siphon rapid drainage anti-crystallization blind pipe as claimed in claim 1, wherein: the width of the drainage channel (1) is larger than the diameter of the hollow hole (2) on the blind pipe.
4. The siphon rapid drainage anti-crystallization blind pipe as claimed in claim 1, wherein: the depth of the drainage channel (1) is larger than the diameter of the hollow hole (2) on the blind pipe.
5. The siphon rapid drainage anti-crystallization blind pipe as claimed in claim 1, wherein: the cross section of the drainage channel (1) is rectangular.
6. The method for installing the siphon rapid drainage crystallization-preventing blind pipe as claimed in any one of claims 1 to 5, wherein: the method comprises the following steps:
s1, spraying slurry to the inner wall of the tunnel to form a lining in the tunnel;
s2, after a lining is formed, arranging the blind pipes from the vault of the tunnel to two sides, and fixing the blind pipes on the inner wall of the lining;
s3, fixing a waterproof plate, wherein the blind pipe is positioned between a lining and the waterproof plate;
and S4, spraying again to form a second lining on the inner wall of the waterproof board.
CN202110097617.XA 2021-01-25 2021-01-25 Siphon rapid drainage anti-crystallization blind pipe and installation method thereof Pending CN112648011A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110097617.XA CN112648011A (en) 2021-01-25 2021-01-25 Siphon rapid drainage anti-crystallization blind pipe and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110097617.XA CN112648011A (en) 2021-01-25 2021-01-25 Siphon rapid drainage anti-crystallization blind pipe and installation method thereof

Publications (1)

Publication Number Publication Date
CN112648011A true CN112648011A (en) 2021-04-13

Family

ID=75370788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110097617.XA Pending CN112648011A (en) 2021-01-25 2021-01-25 Siphon rapid drainage anti-crystallization blind pipe and installation method thereof

Country Status (1)

Country Link
CN (1) CN112648011A (en)

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1303974A (en) * 1999-12-17 2001-07-18 胡鸣群 Drainage method and drain pipe using said method
CN202117038U (en) * 2011-06-10 2012-01-18 湖南亨通贸易有限公司 Water diversion belt
CN202610946U (en) * 2012-04-16 2012-12-19 李鸿亮 Tooth-shaped meshed hard permeable hose
CN204082211U (en) * 2014-09-26 2015-01-07 廖勇 Dewatering installation and tunnel drainage system
CN104278666A (en) * 2014-10-11 2015-01-14 南京赛伯通建筑工程有限公司 Bag-packaged plastic drainage device
CN105019941A (en) * 2015-08-06 2015-11-04 广东省长大公路工程有限公司 Combined drainage blind pipe capable of being maintained
CN205977269U (en) * 2016-07-29 2017-02-22 中国铁道科学研究院铁道建筑研究所 Tunnel drainage blind pipe and tunnel drainage system
CN106522201A (en) * 2016-12-21 2017-03-22 盐城工学院 Swell-shrink type drainage device and sludge positive and negative pressure drainage method
CN106555394A (en) * 2017-01-12 2017-04-05 广西大学 A kind of excessively moist ultra-soft soil drainage arrangement of artificial hydraulic reclamation
CN106869999A (en) * 2017-03-22 2017-06-20 西南交通大学 A kind of tunnel drainage sleeve pipe and its application method for removing crystallization and silting thing
CN206693207U (en) * 2017-04-01 2017-12-01 江苏建筑职业技术学院 Blind pipe for roadbed blind ditch construction
CN107503340A (en) * 2017-08-28 2017-12-22 中铁二院工程集团有限责任公司 A kind of drain structure of arc capillary diversion passage
CN206956755U (en) * 2017-04-18 2018-02-02 中南大学 A kind of saturating drainpipe of Novel replaceable underground engineering
CN107829425A (en) * 2017-11-06 2018-03-23 汤连生 One kind tool circulation air emptying function column type forced-ventilated water pipe, device and method
CN107893910A (en) * 2017-12-20 2018-04-10 江汉大学 A kind of water trap for gas piping
CN108104105A (en) * 2018-02-06 2018-06-01 建湖县申茂软基材料有限公司 Water discharge member and subgrade structure
CN108729932A (en) * 2018-05-22 2018-11-02 中铁二院工程集团有限责任公司 Tunnel lining structure solid waterproof and water drainage system
CN208236461U (en) * 2018-05-22 2018-12-14 四川睿铁科技有限责任公司 A kind of anti-clogging can safeguard tunnel drainage system
CN209144686U (en) * 2018-11-07 2019-07-23 广东工业大学 Novel anti-red beds soil silting drains pipe outer wall cell structure
CN111425250A (en) * 2020-04-23 2020-07-17 交通运输部公路科学研究所 Double-layer pressure-reducing water-proof and drainage system for karst water-rich tunnel and construction method of double-layer pressure-reducing water-proof and drainage system
CN211472775U (en) * 2019-10-18 2020-09-11 淮安市大有塑纤有限公司 Novel drainage blind pipe
CN211815312U (en) * 2020-02-14 2020-10-30 重庆昂然建筑工程有限公司 Asphalt concrete road structure

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1303974A (en) * 1999-12-17 2001-07-18 胡鸣群 Drainage method and drain pipe using said method
CN202117038U (en) * 2011-06-10 2012-01-18 湖南亨通贸易有限公司 Water diversion belt
CN202610946U (en) * 2012-04-16 2012-12-19 李鸿亮 Tooth-shaped meshed hard permeable hose
CN204082211U (en) * 2014-09-26 2015-01-07 廖勇 Dewatering installation and tunnel drainage system
CN104278666A (en) * 2014-10-11 2015-01-14 南京赛伯通建筑工程有限公司 Bag-packaged plastic drainage device
CN105019941A (en) * 2015-08-06 2015-11-04 广东省长大公路工程有限公司 Combined drainage blind pipe capable of being maintained
CN205977269U (en) * 2016-07-29 2017-02-22 中国铁道科学研究院铁道建筑研究所 Tunnel drainage blind pipe and tunnel drainage system
CN106522201A (en) * 2016-12-21 2017-03-22 盐城工学院 Swell-shrink type drainage device and sludge positive and negative pressure drainage method
CN106555394A (en) * 2017-01-12 2017-04-05 广西大学 A kind of excessively moist ultra-soft soil drainage arrangement of artificial hydraulic reclamation
CN106869999A (en) * 2017-03-22 2017-06-20 西南交通大学 A kind of tunnel drainage sleeve pipe and its application method for removing crystallization and silting thing
CN206693207U (en) * 2017-04-01 2017-12-01 江苏建筑职业技术学院 Blind pipe for roadbed blind ditch construction
CN206956755U (en) * 2017-04-18 2018-02-02 中南大学 A kind of saturating drainpipe of Novel replaceable underground engineering
CN107503340A (en) * 2017-08-28 2017-12-22 中铁二院工程集团有限责任公司 A kind of drain structure of arc capillary diversion passage
CN107829425A (en) * 2017-11-06 2018-03-23 汤连生 One kind tool circulation air emptying function column type forced-ventilated water pipe, device and method
CN107893910A (en) * 2017-12-20 2018-04-10 江汉大学 A kind of water trap for gas piping
CN108104105A (en) * 2018-02-06 2018-06-01 建湖县申茂软基材料有限公司 Water discharge member and subgrade structure
CN108729932A (en) * 2018-05-22 2018-11-02 中铁二院工程集团有限责任公司 Tunnel lining structure solid waterproof and water drainage system
CN208236461U (en) * 2018-05-22 2018-12-14 四川睿铁科技有限责任公司 A kind of anti-clogging can safeguard tunnel drainage system
CN209144686U (en) * 2018-11-07 2019-07-23 广东工业大学 Novel anti-red beds soil silting drains pipe outer wall cell structure
CN211472775U (en) * 2019-10-18 2020-09-11 淮安市大有塑纤有限公司 Novel drainage blind pipe
CN211815312U (en) * 2020-02-14 2020-10-30 重庆昂然建筑工程有限公司 Asphalt concrete road structure
CN111425250A (en) * 2020-04-23 2020-07-17 交通运输部公路科学研究所 Double-layer pressure-reducing water-proof and drainage system for karst water-rich tunnel and construction method of double-layer pressure-reducing water-proof and drainage system

Similar Documents

Publication Publication Date Title
US20190153698A1 (en) Self-starting negative pressure drainage system for draining groundwater in slope and construction method thereof
CN109707444B (en) Automatic start-up formula tunnel drainage system
CN108757027A (en) Multi-functional lobby water system in a kind of tunnel
CN102705006A (en) Method for governing operating tunnel flood by adopting wellpoint dewatering method
CN112648011A (en) Siphon rapid drainage anti-crystallization blind pipe and installation method thereof
CN212927943U (en) Reverse slope drainage system in open cut tunnel construction process
CN112228151A (en) Tunnel open cut tunnel water drainage system
CN106499437A (en) A kind of bored tunnel base plate drainage processing method and its structure
JP2000027170A (en) Groundwater level lowering device, ground improvement method and strainer device
CN1804234B (en) Drainage method and apparatus for red mud dump in karst terrain
CN214697863U (en) Drainage type mountain tunnel prefabricated lining ring and lining structure
CN212272299U (en) Water collecting and draining structure of mine method tunnel
KR100399804B1 (en) Construction method for 2arch tunnel
CN105604076A (en) Vacuum pump water-discharging device suitable for tunnel excavation
CN210658473U (en) Anti structure of floating of assembled drainage french drain
CN113250141A (en) System and method for adjusting osmotic water pressure inside slope with water level change
CN202023198U (en) Pressure-reducing anti-buoyancy pipe network drainage device
CN201933604U (en) Rainwater drainage multi-passage inspection well
CN215371568U (en) Rust-resistant polyethylene pipe structure of permeating water
CN111005761A (en) Water collecting and draining structure of mine-method tunnel and construction method thereof
CN220150356U (en) Basement bottom plate groundwater drainage system that falls
CN2892970Y (en) Draining device for karst area red mud pile yard
CN212105956U (en) Passive drainage system of tunnel inverted arch
CN220118180U (en) Underground tunnel water guide device
CN220620161U (en) Composite drainage system in rock slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210413

RJ01 Rejection of invention patent application after publication