CN205977269U - Tunnel drainage blind pipe and tunnel drainage system - Google Patents

Tunnel drainage blind pipe and tunnel drainage system Download PDF

Info

Publication number
CN205977269U
CN205977269U CN201620822581.1U CN201620822581U CN205977269U CN 205977269 U CN205977269 U CN 205977269U CN 201620822581 U CN201620822581 U CN 201620822581U CN 205977269 U CN205977269 U CN 205977269U
Authority
CN
China
Prior art keywords
tunnel drainage
blind pipe
drainage blind
inlet opening
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620822581.1U
Other languages
Chinese (zh)
Inventor
马伟斌
林传年
张千里
郭小雄
王志伟
付兵先
令狐勇生
杜晓燕
马超锋
柳墩利
张伟
牛亚彬
安哲立
邹文浩
李尧
赵鹏
张文达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
China State Railway Group Co Ltd
China Railway Economic and Planning Research Institute
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
China Railway Corp
China Railway Economic and Planning Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Railway Engineering Research Institute of CARS, China Railway Corp, China Railway Economic and Planning Research Institute filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201620822581.1U priority Critical patent/CN205977269U/en
Application granted granted Critical
Publication of CN205977269U publication Critical patent/CN205977269U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a tunnel drainage system technical field provides a tunnel drainage blind pipe. The first half of the pipe wall of this tunnel drainage blind pipe is provided with the inlet opening along the pipe shaft total length, the cross -sectional area of inlet opening is by outer crescent in to. Can avoid the grains of sand, earth etc. To enter into through the inlet opening that sets up this kind of form takes place after the inlet opening to block up for the grains of sand, earth etc. Can enter into drainage blind pipe and final the discharge along with the infiltration, thereby guarantee drainage system's drainage effect.

Description

A kind of tunnel drainage blind pipe and tunnel drainage system
Technical field
This utility model is related to tunnel drainage system technical field, more particularly, to a kind of tunnel drainage blind pipe and tunnel drainage System, more specific for the draining blind pipe in a kind of railway tunnel and drainage system.
Background technology
Tunnel drainage system is the important step during tunnel construction, normal use and safe operation.With railway tunnel As a example, drainage system is directly connected to success or failure and the performance using function of Concerning Railway Tunnel Construction.
Drainage system includes the structures such as inspection shaft, draining blind pipe and gutter.Wherein, the effect of draining blind pipe is collection row Country rock or structure infiltration, in order to reduce groundwater pressure, exclude excessive moisture, and protection path structure will not be because producing underground water enchroachment (invasion) Lose and destroy.But in prior art blind pipe often by the grains of sand or soil etc. block, ultimately result in blind pipe no block so that method just Often work, and finally affect the drainage effect of whole drainage system.
Utility model content
(1) technical problem to be solved
The purpose of this utility model is:A kind of tunnel drainage blind pipe and tunnel drainage system are provided, solve existing draining blind Tube capacity easily blocks and then affects the problem of drainage effect.
(2) technical scheme
In order to solve above-mentioned technical problem, this utility model provides a kind of tunnel drainage blind pipe, the top half of tube wall Pipe shaft total length is provided with inlet opening, the cross-sectional area of described inlet opening is gradually increased from outside to inside.
Preferably, symmetrical structure centered on described inlet opening.
Preferably, described inlet opening is in round table-like or prism-shaped.
Preferably, towards on the direction of described tunnel drainage blind pipe central axis, described inlet opening is towards described tunnel The opposite direction of the drainage direction of draining blind pipe tilts.
Preferably, the medial surface of relative with described inlet opening side on described tube wall is inclined plane, and described inclined plane Tilt gradually downward along drainage direction.
Preferably, described inlet opening is in that blossom type is distributed on described tunnel drainage blind pipe.
Preferably, described tunnel drainage blind pipe is solid wall pipe, the winding pipe of inner wall smooth or the inwall light of inner wall smooth Sliding double-wall corrugated pipe.Preferably, described tunnel drainage blind pipe connects with described inspection shaft, and described tunnel drainage blind pipe is upper State tunnel drainage blind pipe.
Preferably, between many described tunnel drainage blind pipes, and between described tunnel drainage blind pipe and described inspection shaft All connected by three way cock.
Preferably, described three way cock includes the first pipeline section, and the second pipe that relatively described first pipeline section is symmetrical Section and the 3rd pipeline section;It is provided with division board on the shaft section of described first pipeline section;It is provided with through hole on described division board.
(3) beneficial effect
The technical solution of the utility model has advantages below:Tunnel drainage blind pipe of the present utility model, the upper half of tube wall Part is provided with inlet opening along pipe shaft total length, and the cross-sectional area of described inlet opening is gradually increased from the inside to the outside.By arranging this kind The inlet opening of form can avoid the grains of sand, soil etc. to enter into after inlet opening blocking occurs so that the grains of sand, soil etc. can be with Seeps water enters in draining blind pipe and finally discharges, thus ensureing the drainage effect of drainage system.
Brief description
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or in description of the prior art the accompanying drawing of required use be briefly described it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise not paying creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the perspective view of the tunnel drainage blind pipe of embodiment;
Fig. 2 is cross-sectional schematic at A-A in Fig. 1;
In figure:1st, inlet opening.
Specific embodiment
With reference to the accompanying drawings and examples embodiment of the present utility model is described in further detail.Following examples For this utility model is described, but can not be used for limiting scope of the present utility model.
In description of the present utility model, it should be noted that term " " center ", " longitudinal ", " horizontal ", " on ", D score, The orientation of instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outward " or position relationship are Based on orientation shown in the drawings or position relationship, it is for only for ease of description this utility model and simplifies description, rather than instruction Or the hint device of indication or element must have specific orientation, with specific azimuth configuration and operation, be not therefore understood that It is to restriction of the present utility model.Additionally, term " first ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that Instruction or hint relative importance.
In description of the present utility model, it should be noted that unless otherwise clearly defined and limited, term " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or is integrally connected;Can To be to be mechanically connected or electrical connection;Can be to be joined directly together it is also possible to be indirectly connected to by intermediary.For this For the those of ordinary skill in field, concrete meaning in this utility model for the above-mentioned term can be understood with concrete condition.
Refer to Fig. 1, the tunnel drainage blind pipe of the present embodiment, the top half of tube wall is provided with into water along pipe shaft total length Hole.Further as can be known from Fig. 2, the cross-sectional area of described inlet opening is gradually increased from outside to inside, namely inlet opening is expanded for loudspeaker The form in hole.
Wherein, " from outside to inside " refers to towards on the direction of close described tunnel drainage blind pipe central axis, namely away from Close to tunnel drainage blind pipe central axis is inner side, and apart from tunnel drainage blind pipe central axis remote be outside.
In the present embodiment, the impurity such as the grains of sand, soil can be avoided to enter into into water by arranging the inlet opening of this kind of form There is blocking so that the grains of sand, soil etc. can enter in draining blind pipe with infiltration and finally discharge, thus ensureing after hole The drainage effect of drainage system.
In the present embodiment, inlet opening is preferably centrosymmetric structure, for example round table-like, billiard table shape, prism-shaped etc..Refer to Fig. 1, in the present embodiment inlet opening using round table-like form it should be appreciated that accompanying drawing do not constitute to water inlet pore structure limit System.
Further, can smoothly discharge after entering tunnel drainage blind pipe to ensure the impurity such as the grains of sand, soil, towards On the direction of described tunnel drainage blind pipe central axis, described inlet opening is towards the drainage direction of described tunnel drainage blind pipe Opposite direction tilts.
Specifically, because the density ratio water of impurity is big, so impurity is typically directly vertical after entering tunnel drainage blind pipe Sedimentation.And current then enter in tunnel drainage blind pipe along the incline direction of inlet opening, thus current obtain and tunnel drainage is blind Manage initial flow rate in opposite direction so that current run to the upstream of impurity, and the impurity settling the most at last flushes out tunnel row Water blind pipe.
Additionally, for the smooth discharge ensureing impurity, the medial wall of tube wall can also be correspondingly improved.Specifically, On tube wall, along pipe shaft total length, the medial surface of described tube wall is inclined plane to the top half relative with described inlet opening, and described inclines Inclined-plane tilts gradually downward along drainage direction.This inclined plane can play certain guiding function to the discharge of impurity, prevents Impurity is deposited in tunnel drainage blind pipe and ultimately results in line clogging.Certainly it should be noted that in order to conformance with standard requires simultaneously It is easy to manufacture, special adaptations are not done to the external shape of tunnel drainage blind pipe.
In order to ensure that tunnel drainage blind pipe can reduce groundwater pressure to the full extent, preferably inlet opening is in described tunnel It is in that blossom type is distributed, please with further reference to Fig. 1 on draining blind pipe.Furthermore it is preferred that inlet opening is uniformly divided on tunnel drainage blind pipe Cloth.And, inlet opening setting space, diameter are mated with draining blind pipe drainability.
In the present embodiment, tunnel drainage blind pipe is solid wall pipe, the winding pipe of inner wall smooth or the inwall light of inner wall smooth Sliding double-wall corrugated pipe.Preferably, adopt solid wall pipe as a diameter of 50mm~120mm of tunnel drainage blind pipe;Work as tunnel drainage Double-wall corrugated pipe is adopted during a diameter of 150mm~600mm of blind pipe.
The present embodiment also provides a kind of tunnel drainage system, including inspection shaft and tunnel drainage blind pipe, described tunnel drainage Blind pipe connects with described inspection shaft, and described tunnel drainage blind pipe is above-mentioned tunnel drainage blind pipe.
In the present embodiment, between many described tunnel drainage blind pipes, and described tunnel drainage blind pipe and described inspection shaft Between all can using three way cock connect.
Wherein, three way cock includes the first pipeline section, and the second pipeline section and that relatively described first pipeline section is symmetrical Three pipeline sections.Once the second pipeline section or the 3rd pipeline section block, then common practice is to be dredged by the first pipeline section.But It is in prior art, it is impossible to control its trend well, thus being likely to second after high pressure dredging shower nozzle inserts the first pipeline section During pipeline section blocking, high pressure is dredged the final injection of shower nozzle and is put to being towards the 3rd pipeline section.In view of this, the present embodiment is first It is provided with division board on the shaft section of pipeline section, and is provided with through hole on division board, thus division board is realizing high pressure is dredged Shower nozzle does not interfere with the circulation of the water of three-port structure on the basis of guiding.
It is assumed that the first pipeline section is first end near one end of the second pipeline section (or the 3rd pipeline section) in the present embodiment, and another One end is the second end.In order to effectively guide to high pressure dredging shower nozzle, then the second end of division board Edge Distance first pipeline section Port must not be too far away, and is preferably isolated plate and extends directly into the second end port.Additionally, the of Edge Distance first pipeline section of division board One end port nor too remote, and be preferably isolated plate and stretch out the first pipeline section and extend into the second pipeline section and the 3rd pipeline section Intersection.Certainly, the setting of division board can not affect the connection between the second pipeline section and the 3rd pipeline section.
Embodiment of above is merely to illustrate this utility model, rather than to restriction of the present utility model.Although with reference to enforcement Example has been described in detail to this utility model, it will be understood by those within the art that, to technology of the present utility model Scheme carries out various combinations, modification or equivalent, without departure from the spirit and scope of technical solutions of the utility model, all should Cover in the middle of right of the present utility model.

Claims (10)

1. a kind of tunnel drainage blind pipe, the top half of tube wall pipe shaft total length is provided with inlet opening it is characterised in that described enter The cross-sectional area in water hole is gradually increased from outside to inside.
2. tunnel drainage blind pipe according to claim 1 is it is characterised in that symmetrical structure centered on described inlet opening.
3. tunnel drainage blind pipe according to claim 2 is it is characterised in that described inlet opening is in round table-like or prism-shaped.
4. tunnel drainage blind pipe according to claim 1 is it is characterised in that towards near described tunnel drainage blind pipe center On the direction of axis, the opposite direction of the drainage direction towards described tunnel drainage blind pipe for the described inlet opening tilts.
5. tunnel drainage blind pipe according to claim 4 is it is characterised in that relative with described inlet opening on described tube wall The medial surface of side is inclined plane, and described inclined plane tilts gradually downward along drainage direction.
6. tunnel drainage blind pipe according to claim 1 is it is characterised in that described inlet opening is in described tunnel drainage blind pipe Upper is in blossom type distribution.
7. the tunnel drainage blind pipe according to claim 1 to 6 any one is it is characterised in that described tunnel drainage blind pipe Double-wall corrugated pipe for the solid wall pipe of inner wall smooth, the winding pipe of inner wall smooth or inner wall smooth.
8. a kind of tunnel drainage system, including inspection shaft and tunnel drainage blind pipe it is characterised in that described tunnel drainage blind pipe and Described inspection shaft connection, and described tunnel drainage blind pipe is the tunnel drainage blind pipe described in any one in claim 1 to 7.
9. tunnel drainage system according to claim 8 is it is characterised in that between many described tunnel drainage blind pipes, with And all connected by three way cock between described tunnel drainage blind pipe and described inspection shaft.
10. tunnel drainage system according to claim 9 is it is characterised in that described three way cock includes the first pipeline section, with And symmetrical the second pipeline section of relatively described first pipeline section and the 3rd pipeline section;Be provided with the shaft section of described first pipeline section every From plate;It is provided with through hole on described division board.
CN201620822581.1U 2016-07-29 2016-07-29 Tunnel drainage blind pipe and tunnel drainage system Active CN205977269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620822581.1U CN205977269U (en) 2016-07-29 2016-07-29 Tunnel drainage blind pipe and tunnel drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620822581.1U CN205977269U (en) 2016-07-29 2016-07-29 Tunnel drainage blind pipe and tunnel drainage system

Publications (1)

Publication Number Publication Date
CN205977269U true CN205977269U (en) 2017-02-22

Family

ID=58028418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620822581.1U Active CN205977269U (en) 2016-07-29 2016-07-29 Tunnel drainage blind pipe and tunnel drainage system

Country Status (1)

Country Link
CN (1) CN205977269U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108920417A (en) * 2018-07-31 2018-11-30 中建隧道建设有限公司 The calculation method of Rock And Soil dehydration quicksand rate on the outside of a kind of shield subway tunnel section of jurisdiction
CN110656551A (en) * 2019-11-11 2020-01-07 中信国安建工集团有限公司 Asphalt highway capable of avoiding water accumulation and construction method
CN112648011A (en) * 2021-01-25 2021-04-13 成都和拓土木工程有限公司 Siphon rapid drainage anti-crystallization blind pipe and installation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108920417A (en) * 2018-07-31 2018-11-30 中建隧道建设有限公司 The calculation method of Rock And Soil dehydration quicksand rate on the outside of a kind of shield subway tunnel section of jurisdiction
CN108920417B (en) * 2018-07-31 2022-03-15 中建隧道建设有限公司 Method for calculating water flow sand loss rate of rock and soil mass outside shield subway tunnel segment
CN110656551A (en) * 2019-11-11 2020-01-07 中信国安建工集团有限公司 Asphalt highway capable of avoiding water accumulation and construction method
CN112648011A (en) * 2021-01-25 2021-04-13 成都和拓土木工程有限公司 Siphon rapid drainage anti-crystallization blind pipe and installation method thereof

Similar Documents

Publication Publication Date Title
CN205977269U (en) Tunnel drainage blind pipe and tunnel drainage system
CN201064743Y (en) Irrigation and drainage water pipe
CN103541345B (en) Aqueous vapor separate vacuum preloading and device
CN209339153U (en) A kind of foundation pit supporting construction of the measurement foundation pit parameter of design of foundation pit
CN102635402A (en) Siphon drainage method for tunnel wall water seepage disposal by using dipping borehole
CN207597428U (en) Prefabricated piping lane is connected waterproof construction with cast-in-place piping lane
CN208996061U (en) A kind of structure for deep basal pit underdrain hole position precipitation
CN216428499U (en) A multi-functional inspection shaft that is used for new and old pipe of municipal drainage to plug into department
CN207619240U (en) A kind of digestion tank structure
CN108265894A (en) Look for slope ditching type drainage system
CN108560511B (en) Combined arrangement structure of cavity and water conduit
CN205975844U (en) Single riser swirler of jam is prevented to leak protection water
CN212272299U (en) Water collecting and draining structure of mine method tunnel
CN210917405U (en) Water accumulation preventing ecological slope protection for water and soil conservation
CN201068542Y (en) Side hill sideditch, ditch drainage structure
CN109629586B (en) Recharging well with water filtering structure
CN207160129U (en) A kind of pipeline for hydraulic engineering
CN208733571U (en) A kind of slope surface chute of hydraulic engineering
CN208201937U (en) A kind of anti-clogging well lid
CN217711032U (en) Rain sewage reposition of redundant personnel structure
CN207453070U (en) The ventilation drainage of buried equipment room
CN208039652U (en) Look for slope ditching type drainage system
CN117145024A (en) Inside combination formula drainage structures of side slope
CN109779682A (en) A kind of water abundant ground vcehicular tunnel gutter structural system
CN211948514U (en) Foundation ditch construction drainage device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant