SU1537783A1 - Supporting system of blast furnace - Google Patents

Supporting system of blast furnace Download PDF

Info

Publication number
SU1537783A1
SU1537783A1 SU884399502A SU4399502A SU1537783A1 SU 1537783 A1 SU1537783 A1 SU 1537783A1 SU 884399502 A SU884399502 A SU 884399502A SU 4399502 A SU4399502 A SU 4399502A SU 1537783 A1 SU1537783 A1 SU 1537783A1
Authority
SU
USSR - Soviet Union
Prior art keywords
beams
furnace
racks
blast furnace
overhaul
Prior art date
Application number
SU884399502A
Other languages
Russian (ru)
Inventor
Борис Александрович Кожин
Original Assignee
Мариупольский Филиал Украинского Государственного Института По Проектированию Металлургических Заводов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Мариупольский Филиал Украинского Государственного Института По Проектированию Металлургических Заводов filed Critical Мариупольский Филиал Украинского Государственного Института По Проектированию Металлургических Заводов
Priority to SU884399502A priority Critical patent/SU1537783A1/en
Application granted granted Critical
Publication of SU1537783A1 publication Critical patent/SU1537783A1/en

Links

Landscapes

  • Blast Furnaces (AREA)

Abstract

Изобретение относитс  к строительным конструкци м доменных печей и может быть использовано при реконструкци х и капремонтах доменных печей. Цель изобретени  - повышение удобства производства работ при реконструкции и капремонте и снижение металлоемкости. Опорна  система доменной печи 8 содержит стойки 1 и соединенные с ними балки 2. Новым в системе  вл етс  то, что система выполнена из двух наклонных балок 2 и двух стоек 1, последние расположены вне рабочей зоны с одной стороны печи 8, при этом балки 2 расположены консольно над колошниковой площадкой 9, оперты сверху на стойки 1 и соединены со стойками, которые в поперечном направлении неподвижно закреплены между собой св з ми, а балки соединены с наклонным скиповым мостом 10 системой св зей 3. 1 з.п. ф-лы, 7 ил.The invention relates to the building construction of blast furnaces and can be used in the reconstruction and overhaul of blast furnaces. The purpose of the invention is to improve the convenience of the production of works in the reconstruction and overhaul and reduction of metal consumption. The support system of the blast furnace 8 contains the posts 1 and the beams 2 connected to them. New in the system is that the system is made of two inclined beams 2 and two racks 1, the latter are located outside the working area on one side of the furnace 8, while the beams 2 are positioned above the top of the top plate 9, supported on top of the stands 1 and connected to the stands which are fixedly fixed between themselves in the transverse direction, and the beams are connected to the inclined skip bridge 10 by the communication system 3. 1 c.p. f-ly, 7 ill.

Description

Изобретение относитс  к строительным конструкци м доменных печей и может быть использовано при реконструкци х и капремонтах доменных печей. The invention relates to the building construction of blast furnaces and can be used in the reconstruction and overhaul of blast furnaces.

Цель изобретени  - повышение удобства производства работ при реконструкции и капремонте и снижение металлоемкости „The purpose of the invention is to improve the convenience of the production of works during reconstruction and overhaul and reduction of metal consumption "

На фиг„ 1 изображена опорна  сие- тема доменной печи,общий вид сбоку; на фиг. 2 - разрез А-А на фиг 0 1; на фиг„ 3 - разрез Б-В на фиг„ 1; на фиг. 4 - разрез В-В на фиг 1; на фиг„ 5 - разрез Г-Г на фиг. 1; на фиг. 6 - общий вид сбоку опорна  система доменной печи при подаче сбоку (надвижке) нового кожура печи без купольной его части; на фигс 7 - то же, при подаче сбоку (надвижке) новоFig „1 shows the support structure of the blast furnace, general side view; in fig. 2 is a section A-A in FIG. 0 1; FIG. 3 shows a section BB in FIG. 1; in fig. 4 - section bb In Fig 1; FIG. 5 is a section on the HGD of FIG. one; in fig. 6 is a general side view of the support system of the blast furnace when the side of the furnace is fed (sliding) a new furnace without its dome; in figs 7 - the same, when feeding from the side (sliding) new

го цельного кожуха печи со смонтированной на„нем колошниковой площадкой.one-piece furnace casing with a top plate mounted on it.

Опорна  система содержит две стойки 1, две наклонные балки 2, св зи 3 балок 2, св зи 4 стоек 1, подвески 5, временные распорки 6, вспомогательные балки 7 сThe support system contains two racks 1, two inclined beams 2, connection 3 beams 2, connection 4 racks 1, suspension 5, temporary struts 6, auxiliary beams 7 with

Стойки 1 расположены с одной стороны доменной печи 8 на удалении, при котором они не мешают проведению работ при реконструкци х и капремонтах доменной печи. Стойки 1 в поперечном направлении раскреплены между собой св з ми 4 г Балки 2 расположены консольно над колошниковой площадкой 9, оперты сверху на стойки 1 и раскреплены с наклонным скиповым мостом 10 системой св зей 3, обеспечивающей геометрическую неизменность и устойчивость балок 2.Racks 1 are located on one side of the blast furnace 8 at a distance, at which they do not interfere with the work during reconstruction and overhaul of the blast furnace. Racks 1 in the transverse direction are bonded to each other by ties 4 g. Beams 2 are located console above the top plate 9, supported on top of racks 1 and fixed with an inclined skip bridge 10 by the communication system 3, which ensures the geometric invariance and stability of the beams 2.

Балки 2 могут быть сплошными и решетчатыми и выполнены наклонно, например, параллельно пролетному строению наклонного моста 10. Кажда  балка 2 крепитс  нижним концом к неподвижной опоре, размещенной в районе скиповой  мы, второй подвижной опорой служит стойка 1, котора   вл етс  подвижной опорой балки 2 в продольномThe beams 2 can be solid and lattice and are made obliquely, for example, parallel to the span of the inclined bridge 10. Each beam 2 is fixed with the lower end to a fixed support located in the skip area, the second mobile support is stand 1, which is the mobile support of beam 2 in the longitudinal

0 5 0 5

00

5five

00

5five

00

5five

направлении, в поперечном же направлении стойки 1, благодар  поставленным между ними св з м 4,  вл ютс  дл  балок 2 непочвижными опорами. Стойки 1 расположены вне рабочей зоны в створе с пилоном 11 наклонного моста 10„the direction in the transverse direction of the support 1, due to the connections between them m 4, are non-fixed supports for the beams 2. Racks 1 are located outside the working area in alignment with the pylon 11 of the inclined bridge 10 "

Стойки 1 со св з ми 4 и балки 2 со св з ми 3 рассчитаны на нагрузки, возникающие при подвеске к консольным участкам балок 2 колошникового устройства доменной печи, тсе. колошниковой площадки 9 с копром, вертикальных газоходов 12 и верхней части кожуха печи, например купольной части 13. При совмещении конструкции опорной системы с конструкцией наклонного моста к указанным нагрузкам добавл ютс  нагрузки от скипового хоз йства.Racks 1 with links 4 and beams 2 with links 3 are designed for loads arising from the suspension to the cantilever sections of beams 2 of the blast furnace top furnace device, tsa. top site 9 with a pile, vertical ducts 12 and the upper part of the furnace casing, for example, the dome part 13. When combining the design of the supporting system with the design of the inclined bridge, the loads from the skip farm are added to the specified loads.

Така  конструкци  опорной системы может быть использована как в период реконструкции и капремонтов доменной печи, так и при ее работе. В том случае, когда опорна  система используетс  при работе печи, к балкам 2 с помощью подвесок 5 закрепл етс  колошникова  площадка 9 с расположенным на ней копром и оборудованием (при этом конструкци  копра может быть исключена и заменена соответствующими конструкци ми, прикрепленными к балкам 2 опорной системы,чем, в частности , исключаетс  необходимость использовани  дл  опирани  колошниковой площадки с копром колонн шахты печи) .This design of the support system can be used both during the reconstruction and overhaul of the blast furnace, and during its operation. In the case when the support system is used during the operation of the furnace, the top plate 9 with a pile and equipment on it is fixed to the beams 2 with the help of hangers 5 (the copra design can be eliminated and replaced by the corresponding structures attached to the beams 2). system, which, in particular, eliminates the need to use the support site with a pile of columns of the furnace shaft for supporting).

Использование опорной системы в период остановок печи на реконструкцию или капремонт дает возможность не только максимально укрупн ть и свободно подавать сбоку на место установки новые узлы, элементы печи, но и замен ть кожух печи полностью совместно с примыкающими к нему конструкци ми . IThe use of the support system during the stopping of the furnace for reconstruction or overhaul makes it possible not only to enlarge as much as possible and freely supply the new components and elements of the furnace to the side of the installation site, but also to replace the furnace casing fully together with the structures adjacent to it. I

На фиг. 6 показана опорна  системаFIG. 6 shows the support system.

при замене кожуха печи с сохранением его купольной части. В чтом случаеwhen replacing the furnace casing with preservation of its dome. In which case

315315

с помощью подвесок 5 колошникова  площадка 9 с опирающимис  на нее оборудованием и вертикальными гахоходами 12 совместно с прикрепленным к ним куполом 13 печи 8 закреплена к балкам 2. Собранный в стороне новый кожух печи 8 (без купольной части) подаетс  на место установки целиком сбоку путем надвижки.using the hangers 5, the top plate 9 with the equipment supported on it and vertical guokhohod 12 together with the dome 13 attached to them 13 of the furnace 8 is fixed to the beams 2. The new furnace 8 assembled aside (without the dome part) is fed to the entire installation site from the side by sliding .

На фиг. 7 показана опорна  система при полной замене кожуха печи совместно с колошниковой площадкой. В этом случае опорна  система принимает на себ  нагрузку от оставл емых вертикальных газоходов 12, которые в нижней части раскрепл ютс  на врем  монтажа временными распорками 6, опираютс  на балки 2 с помощью вспомогательных балок 7. Новый кожух печи 8 собираетс  в стороне полностью, на нем монтируетс  нова  колошникова  площадка 9, после чего вс  конструкци  подаетс  (методом надвижки) в проектное положение.FIG. 7 shows the support system with the complete replacement of the furnace casing together with the top plate. In this case, the support system takes up the load from the remaining vertical ducts 12, which in the lower part loosen for the time of installation with temporary struts 6, is supported on the beams 2 by means of auxiliary beams 7. The new furnace casing 8 is assembled aside A new top plate 9 is mounted, after which the entire structure is fed (by sliding) into the design position.

Использование выполненной таким образом опорной системы позволит со7836The use of the support system made in this way will allow co787836

кратить врем  просто  доменной печи при ее реконструквд х и капремонта.to shorten the time of a simple blast furnace at its reconstructions and overhaul.

Claims (2)

1. Опорна  система доменной печи, содержаща  расположенные за предела- ми печи стойки и соединенные с ними1. The blast furnace support system, which contains counters located outside the furnaces and are connected to them. Q балки, отличающа с Q beams, different with тем, что, с целью повышени  удобства производства работ при реконструкции и капремонте и снижени  металлоемкости , стойки размещены с однойby the fact that, in order to increase the convenience of the production of works during reconstruction and overhaul and reduce metal consumption, the racks are placed with one 5 стороны печи, а балки установлены на них наклонно с образованием нависающей над колошниковой площадкой консоли, к которой присоединены элементы доменной печи.5 sides of the furnace, and the beams are installed on them obliquely with the formation of a console hanging above the top plate, to which the elements of the blast furnace are attached. 2. Система по п. 1, отличающа с  тем, что наклонные балки совмещены со скиповым мостом печи, а стойки - с пилоном скипового моста , при этом стойки раскреплены между собой, а балки со скиповым мостом - св з ми жесткости.2. The system of claim 1, characterized in that the inclined beams are combined with the skip bridge of the furnace, and the racks with the pylon of the skip bridge, while the racks are fastened together, and the beams with the skip bridge - connections of rigidity. 3 Ю3 S фие.Ьfie.Ь Фи(6Phi (6 Составитель Л. Нахметова Редактор Н. Лазаренко Техред Л.Олийнык Корректор М. Кучер ва Compiled by L. Nakhmetov Editor N. Lazarenko Tekhred L. Oliynyk Proofreader M. Kucher va Заказ 150Order 150 Тираж 571Circulation 571 ВНИИПИ Государственного комитета по изобретени м и открыти м при ГКНТ СССР 113035, Москва, Ж-35, Раушска  наб., д. 4/5VNIIPI State Committee for Inventions and Discoveries at the State Committee on Science and Technology of the USSR 113035, Moscow, Zh-35, Raushsk nab. 4/5 Фие.5FI.5 ПодписноеSubscription
SU884399502A 1988-03-29 1988-03-29 Supporting system of blast furnace SU1537783A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884399502A SU1537783A1 (en) 1988-03-29 1988-03-29 Supporting system of blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884399502A SU1537783A1 (en) 1988-03-29 1988-03-29 Supporting system of blast furnace

Publications (1)

Publication Number Publication Date
SU1537783A1 true SU1537783A1 (en) 1990-01-23

Family

ID=21364253

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884399502A SU1537783A1 (en) 1988-03-29 1988-03-29 Supporting system of blast furnace

Country Status (1)

Country Link
SU (1) SU1537783A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1297671C (en) * 2005-09-05 2007-01-31 重庆钢铁(集团)有限责任公司 Blast furnace soaking furnace examination and repair method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Грацилев В.Мо и др. Реконструкци доменной печи, совмещенна с капитальным ремонтом,, - Металлург, 1978, .№ 2, с. 15-18. Авторское свидетельство СССР № 863821, кл. Е 04 Н 12/00, 1979. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1297671C (en) * 2005-09-05 2007-01-31 重庆钢铁(集团)有限责任公司 Blast furnace soaking furnace examination and repair method

Similar Documents

Publication Publication Date Title
US20100294215A1 (en) Method of and apparatus for supporting walls of a power boiler
CN105819353A (en) Split combined type tower crane wall attaching frame and installation method thereof
SU1537783A1 (en) Supporting system of blast furnace
CN215671292U (en) Prefabricated wallboard supporting system
US4717030A (en) Turbine building equipped with overhead traveling cranes
JPH04228727A (en) Foundation structure
SU1081265A1 (en) Joint of longitudinal girders
JPH05179809A (en) Coal banker installation method
CN215486165U (en) Fixing device of crossbeam in pit
US4003558A (en) Supporting structure for blast furnaces
JPH0693603A (en) Beam structure by use of inverted arched member and slantingly extended structure and arched member thereof
CN208712751U (en) Steel grating processing device
CN219351581U (en) Photovoltaic system operation and maintenance channel supporting structure and photovoltaic system operation and maintenance channel
CN109295993B (en) Tubular column foundation structure for rapid turnover construction and use method
CN213539807U (en) Supporting structure for construction of building engineering
CN209413398U (en) A kind of coal scuttle crossbeam
SU1574517A1 (en) Arrangement for heating cars with frozen cargo
RU2229056C2 (en) Boiler erection process
SU1106886A2 (en) Jig
SU1352017A1 (en) Multibranch column of industrial building
CN211036680U (en) Bracket for high pier variable-height curve continuous steel truss girder main pier
SU1122794A1 (en) Connection joint of crane-supporting beams with column
SU881283A1 (en) Mine head-frame
SU1536004A1 (en) Mine working support
SU1723286A1 (en) Device for restructuring piping scaffold