SU1523675A1 - Method of supportting mine workings - Google Patents
Method of supportting mine workings Download PDFInfo
- Publication number
- SU1523675A1 SU1523675A1 SU874319218A SU4319218A SU1523675A1 SU 1523675 A1 SU1523675 A1 SU 1523675A1 SU 874319218 A SU874319218 A SU 874319218A SU 4319218 A SU4319218 A SU 4319218A SU 1523675 A1 SU1523675 A1 SU 1523675A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- injection
- anchors
- concrete
- installation
- rock
- Prior art date
Links
Landscapes
- Earth Drilling (AREA)
Abstract
Изобретение относитс к горнодобывающей промышленности, может быть использовано при строительстве подземных сооружений и позвол ет повысить работоспособность и расширить область применени породобетонных конструкций крепи. В забое устанаваливаетс временна крепь с металлической сетчатой зат жкой. Затем бур т шпуры и производ т нагнетание в жущего раствора за зоной максимально разрыхленных пород, из которых формируют податливый слой. После нагнетани в шпуры устанавливают анкера и закрепл ют ими сетку, на которую нанос т набрызгбетон. Временную крепь снимают, а контур выработки сглаживают поворотным набрызгом. 1 з.п. ф-лы, 5 ил.The invention relates to the mining industry, can be used in the construction of underground structures and allows to increase the efficiency and expand the field of application of rock-concrete lining structures. A temporary lining with a metal mesh tightening is installed in the bottom. Then the hole is drilled and the injection is carried out in the slurry solution beyond the zone of the maximally loosened rocks from which the malleable layer is formed. After injection, anchors are installed in the bore-holes and they secure the grid to which they apply sprayed concrete. Temporary lining is removed, and the contour of the mine is smoothed by swiveling spray. 1 hp f-ly, 5 ill.
Description
Изобретение относитс к горной промышленности , в частности к способам креплени горных выработок, и может быть использовано при строительстве подземных сооружений.The invention relates to the mining industry, in particular to methods of securing mine workings, and can be used in the construction of underground structures.
Целью изобретени вл етс повышение работоспособности и расширение области применени породобетонных конструкций крепи.The aim of the invention is to improve the performance and expand the field of application of rock-concrete lining structures.
На фиг 1 изображена горна выработка , продольный разрез (с последовательностью возведени крепи); на фиг. 2 - сечение А-А на фиг. 1; на фиг, 3 - сечение Б-Б на фиг. 1; на фиг. 4 - сечение В-В на фиг. 1; на фиг. 5 - сечение Г-Г на фиг. 1.Fig. 1 depicts hearth making, a longitudinal section (with a succession of erection of lining); in fig. 2 is a section A-A in FIG. one; FIG. 3 is a section BB in FIG. one; in fig. 4 shows a section B-B in FIG. one; in fig. 5 is a cross-section of the FIG. one.
Способ креплени горных выработок реализуетс следующим образом.The method of securing mine workings is as follows.
По мере проходки в забое выработки устанавливают временную крепь 1 с металлической сетчатой зат жкой 2,As sinking in the mine working place, temporary support 1 with metal mesh tightening 2 is installed,
котора расклиниваетс и забучиваетс согласно типовым паспортам. С отставанием от забо после срабатывани временной крепи в податливом режиме по периметр У выработки бур т шпуры 3 дл нагнетани в жущего раствора . Длина шпуров 3 определ етс - размером зоны разрушенных пород, образовавшейс к этому времени, .Дл нагнетани используют инъектор 4 многоразового использовани , в конструкции которого предусмотрена возможность герметизации любого заданного отрезка шпура 3 (например, с помощью разжимных резиновых тампонов). Первоначально инъектор 4 устанавливают в ДО тй части шпура 3 и нагнетание ве- дут в режиме заданного давлени . При насыщении массива в обрабатываемой зоне (о чем св1адетельствует повышение давлени на манометре нагнетагаwhich is wedged and forgotten according to the type sheets. Lagging behind the bottom after the time support is activated in a compliant mode around the perimeter. The drill hole 3 is being drilled to generate a bladder solution. The length of the holes 3 is determined by the size of the zone of destroyed rocks formed by this time. For injection, a reusable injector 4 is used, the design of which provides for the possibility of sealing any given piece of hole 3 (for example, using compression rubber tampons). Initially, the injector 4 is installed in the borehole part of the hole 3 and the injection is carried out in the predetermined pressure mode. When the array is saturated in the treated zone (as evidenced by the increase in pressure on the pressure gauge
юYu
соwith
« СП"JV
тельного оборудовани нагнетание прекращают, инъектор 4 перемещают на следующий участок шпура 3,и процесс повтор етс . Последн перестановка инъектора 4 должна соответствовать границе зоны максимально разрыхленных пород 5 приконтурного массива. При установке герметизирующего устройства инъектор 4 в пределах зоны максимально разрыхленных пород 5 приконтурного массива наблюдаетс свободное изливание скрепл ющего раствора в полость выработки без подъема давлени на манометре нагнетательного оборудовани . Это св зано с тем, что породы в пределах этой зоны разбиты сетью сообщающихс трещин, имеющих выход в полость выработки. Таким образом, положение границы зоны максимально разрыхленных пород 5 приконтурного массива определ етс при ведении работ по нагнетанию в жущего раствора . В результате выполнени работ по нагнетанию в жущего раствора вокруг выработки образуютс оболочка из упрочненных пород 6 и податлива зона 7 из максимально разрыхленных пород 5 приконтурного массива. После выполнени нагнетани в жущего раствора инъектор 4 извлекаетс из шпура 3, и. в этот шпур устанавливают анкер 8, закрепл его на внешней границеThe injection equipment is stopped, the injector 4 is moved to the next part of the hole 3, and the process is repeated. The last permutation of the injector 4 should correspond to the boundary of the zone of maximally loosened rocks 5 of the marginal array. When installing the sealing device, injector 4 within the zone of maximally loosened rocks 5 of the marginal array, free flow of the fastening solution into the production cavity without pressure is observed on the pressure equipment pressure gauge. This is due to the fact that the rocks within this zone are broken by a network of communicating cracks that have access to the cavity of the mine. Thus, the position of the boundary of the zone of maximally loosened rocks 5 of the marginal massif is determined when conducting work on the injection into the slurry solution. As a result of works on injecting a slurry around the excavation, a shell is formed of reinforced rocks 6 and a zone 7 of the maximally loosened rocks 5 of the marginal mass is malleable. After the injection solution has been pumped, the injector 4 is removed from the hole 3, and. Anchor 8 is installed in this hole, fastened to the outer border
упрочненной зоны 6 и на контуре выработки . При этом металлическа сетчата зат жка 2 подшиваетс к породному контуру. Затем на армированный сетчатой зат жкой породный контур нанос т слой набрызг-бетона 9. После набора прочности набрызг-бетона 9 временна крепь 1 снимаетс и контур выработки сглаживаетс повторным наб- рызгом.hardened zone 6 and on the contour of production. At the same time, the metal mesh clamp 2 is stitched to the breed contour. Then, a rock contour reinforced with a mesh-reinforced mesh is applied a layer of sprayed concrete 9. After the strength of the sprayed concrete 9 has been established, temporary support 1 is removed and the development contour is smoothed by repeated impact.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874319218A SU1523675A1 (en) | 1987-10-26 | 1987-10-26 | Method of supportting mine workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874319218A SU1523675A1 (en) | 1987-10-26 | 1987-10-26 | Method of supportting mine workings |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1523675A1 true SU1523675A1 (en) | 1989-11-23 |
Family
ID=21332817
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU874319218A SU1523675A1 (en) | 1987-10-26 | 1987-10-26 | Method of supportting mine workings |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1523675A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2509893C1 (en) * | 2012-07-17 | 2014-03-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" | Erection method of earthquake resistant concrete support |
RU2520194C1 (en) * | 2013-04-29 | 2014-06-20 | Дмитрий Борисович Никишичев | Mine working reinforcing method and device for its implementation |
RU2805691C1 (en) * | 2022-12-12 | 2023-10-23 | федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" | Method for conducting mining works in development of flat coal beds |
-
1987
- 1987-10-26 SU SU874319218A patent/SU1523675A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 625043, кл. Е 21 D 11/00, 1976. Авторское свидетельство СССР № 987108, кл Е 21 1) 20/00, 1981. * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2509893C1 (en) * | 2012-07-17 | 2014-03-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" | Erection method of earthquake resistant concrete support |
RU2520194C1 (en) * | 2013-04-29 | 2014-06-20 | Дмитрий Борисович Никишичев | Mine working reinforcing method and device for its implementation |
RU2805691C1 (en) * | 2022-12-12 | 2023-10-23 | федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" | Method for conducting mining works in development of flat coal beds |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1217167A2 (en) | Multi-purpose anchor bolt assembly | |
JPH09217594A (en) | Timbering method for tunnel | |
SU1523675A1 (en) | Method of supportting mine workings | |
RU2134350C1 (en) | Method for fortifying mine workings driven in rock matter liable to heaving | |
CN113107523B (en) | Gap-expanding support method and grouting support process for rock burst support | |
RU2128773C1 (en) | Method for supporting mining workings with loose roof rock by anchor support | |
RU2215150C1 (en) | Method of supporting of underground mine workings with combined support | |
CN112459786A (en) | Method for gob-side entry retaining by roof cutting in multiple times | |
JPH0813997A (en) | Tunnel construction method | |
SU629347A1 (en) | Mine working roof support | |
SU1273582A1 (en) | Method of of bolting rock without hole-drilling | |
SU1481425A1 (en) | Method of supporting mine workings | |
SU1578407A1 (en) | Method of restoring mine workings | |
SU1567789A1 (en) | Method of securing mine working | |
SU1537818A1 (en) | Method of supporting mine workings | |
SU1677443A1 (en) | Method for consolidation of mine workings | |
SU1406388A1 (en) | Method of constructing a mine working | |
SU625044A1 (en) | Method of supporting mine workings | |
SU987108A1 (en) | Method of supporting mine workings | |
SU1765441A1 (en) | Method at advanced anchoring during driving of working | |
RU2684629C1 (en) | Method of grouting rocks during the construction of vertical shafts | |
SU1751349A1 (en) | Method of controlling floor heaving in mine workings | |
SU1507895A1 (en) | Method of supporting mine workings | |
SU1758232A1 (en) | Method of consolidating rocks in vertical shaft sinking | |
SU877031A1 (en) | Method of constructing a vertical shaft |