SU1486545A1 - Collapsible bridge span structure - Google Patents

Collapsible bridge span structure Download PDF

Info

Publication number
SU1486545A1
SU1486545A1 SU874224394A SU4224394A SU1486545A1 SU 1486545 A1 SU1486545 A1 SU 1486545A1 SU 874224394 A SU874224394 A SU 874224394A SU 4224394 A SU4224394 A SU 4224394A SU 1486545 A1 SU1486545 A1 SU 1486545A1
Authority
SU
USSR - Soviet Union
Prior art keywords
blocks
triangular
span
flooring
axis
Prior art date
Application number
SU874224394A
Other languages
Russian (ru)
Inventor
Boris G Akimov
Mikhail V Dvornikov
Original Assignee
Tomsk Inzh Str Inst
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tomsk Inzh Str Inst filed Critical Tomsk Inzh Str Inst
Priority to SU874224394A priority Critical patent/SU1486545A1/en
Application granted granted Critical
Publication of SU1486545A1 publication Critical patent/SU1486545A1/en

Links

Landscapes

  • Road Paving Structures (AREA)

Description

Изобретение относится к строительству и может быть использовано при возведении складных сборно-разборных мостов и других сооружений. Целью изобретения является сокращение сроков монтажа и повышение изгибНой жесткости пролетного строения. Складное пролетное строение мостаThe invention relates to the construction and can be used in the construction of collapsible collapsible bridges and other structures. The aim of the invention is to reduce the time of installation and increase the bending strength of the superstructure. Foldable bridge span

состоит из структурных блоков в виде к вершине каждой пирамиды 1. 6 ил.consists of structural blocks in the form to the top of each pyramid 1. 6 Il.

трехгранных пирамид, последовательно шарнирно соединенных между собой. Основание каждой пирамиды расположено горизонтально и образует проезжую часть, а вершина 2 пирамиды обращена вниз. Ребро 3 основания пирамиды 1 расположено параллельно оси моста, а двумя другими ребрами 4 пирамиды 1 шарнирно соединяются между собой. Каждая- пирамида 1 образована горизонтальным блоком 5 настила и двумя смежными плоскими поперечными треугольными элементами 6, соединенными между собой шарнирно по ребру 7. Блок 5 настила снабжен односторонним запирающимся поперечным относительно оси моста шарниром 8, который позволяет складываться вверх паре треугольных блоков 9 настила. Вершины 2 пирамид 1 объединены между собой гибкой связью 10, жестко прикрепленнойtrihedral pyramids, successively hingedly connected to each other. The base of each pyramid is located horizontally and forms a carriageway, and the top 2 of the pyramid is facing down. The edge 3 of the base of the pyramid 1 is parallel to the axis of the bridge, and the two other edges 4 of the pyramid 1 are articulated. Each pyramid 1 is formed by a horizontal block 5 of the flooring and two adjacent flat transverse triangular elements 6 interconnected pivotally along the edge 7. Block 5 of the flooring is equipped with a hinge 8 that can be folded upwards across a bridge of triangular flooring blocks 9. The tops of 2 pyramids 1 are interconnected by a flexible link 10 rigidly attached

<3<3

„1486545„1486545

10ten

22

сриэ.2srie.2

14865451486545

Изобретение .относится к строительству и может быть использовано при ' возведении складных сборно-разборных мостов и других сооружений.The invention relates to construction and can be used in the construction of collapsible collapsible bridges and other structures.

Цель изобретения - сокращение сроков монтажа и повышение изгибной жесткости пролетного строения.The purpose of the invention is to reduce the time of installation and increase the Flexural rigidity of the superstructure.

На фиг. 1 изображены структурные блоки - трехгранные пирамиды - про- ^д летного строения моста; на фиг. 2 последовательное шарнирное соединение трехгранных пирамид; на фиг.З 'фасад пролетного строения; на фиг.4 поперечное сечение А-А на фиг.З; на 15 фиг, 5 - пролетное строение, план; на фиг. 6' - схема раскладывания и складывания пролетного строения.FIG. Figure 1 shows the structural blocks — the trihedral pyramids — the passage of the bridge's flight structure; in fig. 2 consecutive swivel triangular pyramids; on fig.Z 'facade of the superstructure; in Fig.4, the cross-section A-A in Fig.Z; 15 FIG. 5 — span structure, plan; in fig. 6 'is a diagram of folding and folding of the superstructure.

Складное пролетное строение моста состоит из структурных блоков в виде ло тре'хгранных пирамид 1 , последовательно шарнирно соединенных между собой. Основание каждой пирамиды расположено горизонтально и образует проезжую часть, а вершина-2 пирамиды обра- 25 щена вниз. Ребро 3 основания пирамиды 1 расположено параллельно оси моста, а двумя другими "ребрами 4 пирамиды 1 шарнирно соединяются между собой. Каждая пирамида 1 образована горизонтальным блоком настила 5 и двумя смежными плоскими поперечными треугольными элементами 6, соединенными между собой шарнирно по ребру 7, Для возможности складывания каждого блока 1 в плоский пакет основание 5 пирамиды 1 снабжено запирающийся односторонним, поперечным относительно оси моста шарниром 8, который позволяет складываться вверх паре треугольных блоков 9 настила, препятствуя складыванию блоков 9 вниз, В стадии эксплуатации шарнир 8 не складывается вверх из-за смещения оси его вращения вниз относительно нейтральной горизонтальной плоскости блоков настила 9, что создает удерживающий момент от действия продольной сжимающей силы верхнего пояса. Вершины 2 пирамид 1 объединены между собой гибкой связью 10, жестко прикрепленной в вершине каждой пирамиды 1.The collapsible span of the bridge consists of structural blocks in the form of lo-trihrang pyramids 1, successively hingedly connected to each other. The base of each pyramid is located horizontally and forms a carriageway, and the top-2 of the pyramid is turned down. The edge 3 of the base of the pyramid 1 is parallel to the axis of the bridge, and the other two edges 4 of the pyramid 1 are pivotally interconnected. Each pyramid 1 is formed by a horizontal block of flooring 5 and two adjacent flat transverse triangular elements 6 interconnected pivotally along the edge 7, for possible folding each block 1 into a flat package, the base 5 of the pyramid 1 is provided with a hinge 8 that can be locked up one-way, transverse to the axis of the bridge, which allows folding up a pair of triangular floor blocks 9, n Seeking the folding of blocks 9 down, In the operation stage, the hinge 8 does not fold up due to the displacement of its axis of rotation downward relative to the neutral horizontal plane of the blocks of the flooring 9, which creates a holding moment from the action of the longitudinal compressive force of the upper belt. link 10, rigidly attached at the top of each pyramid 1.

Перевод пролетного строения из сложенного (транспортного ) состояния в эксплуатационное осуществляют с помощью вспомогательного монтажного троса 11, к которому на подвесках 12 закреплено пролетное строение. После закрепления одного из опорных сечений неподвижно пролетное строение растягивают за второе опорное сечение в эксплуатационное состояние до запирания шарниров 8 треугольных блоков настила 9. После установки на опоры пролетное строение моста готово к эксплуатации.The transfer of the span from the folded (transport) state to the operational state is carried out with the help of an auxiliary mounting cable 11, to which a span is fixed on the suspensions 12. After fixing one of the support sections, the span structure is immobile beyond the second support section to the operational state before locking the hinges of 8 triangular blocks of the flooring 9. After installation on the supports, the bridge span structure is ready for operation.

Claims (2)

Формула изобретенияClaim Складное пролетное строение моста, включающее последовательно шарнирно соединенные между собой поперечные треугольные несущие элементы, объединенные по нижним вершинам гибкими связями, и блоки настила, отличающееся тем, что, с целью сокращения сроков монтажа и повышения изгибной жесткости пролетного строения, блоки настила выполнены треугольными в плане, а каждая пара соседних плоских поперечных несущих элементов совместно с покрывающими их сверху двумя треугольными блоками настила образуют трехгранную обращенную вершиной вниз пирамиду, причем все эти вершины пирамид расположены в плане по оси пролетного строения, при этом треугольные блоки настила по двум ребрам, не параллельным оси пролетного строения, шарнирно соединены между собой односторонними запирающимися шарнирами, оси которых смещены относительно нейтральной горизонтальной плоскости блоков настила.Foldable bridge span including successively pivotally interconnected transverse triangular support elements combined at the lower vertices by flexible ties and flooring blocks, characterized in that, in order to shorten the installation time and increase the flexural rigidity of the span, the flooring blocks are made triangular in plan , and each pair of adjacent flat transverse bearing elements together with the two triangular blocks of the floor covering them on top form a trihedral peer-facing downward feast MFA, all of these vertices of the pyramids are arranged in the plane of the span axis, the triangular blocks sheathing on the two edges are not parallel to the axis of the superstructure pivotally interconnected sided lockable hinges whose axes are offset relative to the neutral horizontal flooring blocks. 14865451486545 фи?. 5fi ?. five 22 фи?. 6fi ?. 6
SU874224394A 1987-04-08 1987-04-08 Collapsible bridge span structure SU1486545A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874224394A SU1486545A1 (en) 1987-04-08 1987-04-08 Collapsible bridge span structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874224394A SU1486545A1 (en) 1987-04-08 1987-04-08 Collapsible bridge span structure

Publications (1)

Publication Number Publication Date
SU1486545A1 true SU1486545A1 (en) 1989-06-15

Family

ID=21296255

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874224394A SU1486545A1 (en) 1987-04-08 1987-04-08 Collapsible bridge span structure

Country Status (1)

Country Link
SU (1) SU1486545A1 (en)

Similar Documents

Publication Publication Date Title
US4831792A (en) Retractable stadium roof system with rectangular opening
US7028442B2 (en) Deployable truss beam with orthogonally-hinged folding diagonals
US4118901A (en) Structure for relocatable building with folding plate roof and folding end walls
US4682449A (en) Retractable stadium roof system with rectangular opening
US5276930A (en) Folding transportable bridge
ATE69844T1 (en) MODULAR BRIDGE CONSTRUCTION.
SU1486545A1 (en) Collapsible bridge span structure
HUT39494A (en) Folding stairs
US20040123406A1 (en) Collapsible bridge and method of making and using same
CN106702878A (en) Bidirectional and foldable truss arch bridge structure
CN106758755A (en) A kind of base-supporting folded truss bridge construction
CN106351110B (en) A kind of deck type folded truss bridge structure
SU1361267A1 (en) Collapsible section of vaulted roof
Escrig et al. Roofing geometry of deployable x-frames
CN113957812B (en) Expandable railway emergency repair beam and erection method thereof
CN106351109B (en) A kind of collapsible arch bridge structure
RU2057835C1 (en) Suspension bridge
SU1260464A1 (en) Collapsible tent
US1441387A (en) Long-span bridge
SU435320A1 (en) TEMPORARY SUPPORT FOR INSTALLATION OF IRRIGATION OF NON-SPECIFIED REINFORCED CONCRETE AND PROBLEM STRUCTURES OF BRIDGES AND TRUCKS
SU1726681A1 (en) Collapsible skeleton of building
SU1622491A1 (en) Superstructure of one-way track bridge
RU94025034A (en) Folding bridge block
SU935582A1 (en) Braceless guy-rope truss
SU754006A1 (en) Collapsible three-dimensional structure