SU1437473A1 - Deep-water passage between ponds and method of closing same - Google Patents

Deep-water passage between ponds and method of closing same Download PDF

Info

Publication number
SU1437473A1
SU1437473A1 SU864138457A SU4138457A SU1437473A1 SU 1437473 A1 SU1437473 A1 SU 1437473A1 SU 864138457 A SU864138457 A SU 864138457A SU 4138457 A SU4138457 A SU 4138457A SU 1437473 A1 SU1437473 A1 SU 1437473A1
Authority
SU
USSR - Soviet Union
Prior art keywords
shutter
chamber
transition
cavity
shell
Prior art date
Application number
SU864138457A
Other languages
Russian (ru)
Inventor
Василий Петрович Ягин
Владимир Павлович Ягин
Original Assignee
Восточно-Сибирское Отделение Всесоюзного Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Восточно-Сибирское Отделение Всесоюзного Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука filed Critical Восточно-Сибирское Отделение Всесоюзного Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука
Priority to SU864138457A priority Critical patent/SU1437473A1/en
Application granted granted Critical
Publication of SU1437473A1 publication Critical patent/SU1437473A1/en

Links

Landscapes

  • Revetment (AREA)

Abstract

Изобретение относитс  к области гидротехники . Цель изобретени  - экономи  средств, повышение надежности и расширение функциональных возможностей затвора за счет обеспечени  его работы после закрыти  перехода в качестве гидронепроницаемой перемычки посто нного исполнени . Глубинный межбьефный переход включает эластичную оболочку 3 затвора, заполненную твердеющим веществом 4. В качестве твердеюш,его вещества 4 используют бетонный раствор. Переход включает также затворную камеру 6, местоположение которой совмещено с местоположением гидронепроницаемой перемычки посто нного пополнени . Площадь поперечного сечени  части водовода, расположенной со стороны верхнего бьефа от затворной камеры 6, равна или больше площади входного отверсти  в запорную камеру 6. Камера 6 имеет форму усеченного конуса, большее основание которого обращено в сторону верхнего бьефа. Закрытие межбьефного перехода осуществл ют заполнением полости „ эластичной оболочки твердеющим вещест- § вом 4. Устанавливают данную оболочку в пе- реход до отверждени  вещества 4 в по- лости оболочки 3. Перекрытие перехода осуществл ют давлением воды. 2 с. и 1 з. п. ф-лы, I ил.This invention relates to the field of hydraulic engineering. The purpose of the invention is to save money, increase reliability and expand the functionality of the shutter by ensuring its operation after closing the junction as a hydro-tight jumper of constant performance. Deep inter-tissue transition includes an elastic shell 3 shutter, filled with a hardening substance 4. As hardened, its substances 4 use a concrete solution. The transition also includes the shutter chamber 6, the location of which is aligned with the location of the waterproof plug of the constant recharge. The cross-sectional area of the part of the conduit located on the side of the upper pool from the stopper chamber 6 is equal to or greater than the area of the inlet to the shut-off chamber 6. Chamber 6 has the shape of a truncated cone, the larger base of which faces the upstream. The closure of the interbore transition is carried out by filling the cavity of the elastic shell with a hardening substance. 4. Install this shell into the transition before the substance 4 is cured in the cavity of the shell 3. The overlap of the transition is carried out with water pressure. 2 sec. and 1 h. the item of f-ly, I ill.

Description

//

4four

СО WITH

4;: four;:

СОWITH

Изобретение относитс  к гидротехнике, а именно к временным глубинным меж- бьефным переходам, которые предназначены дл  пропуска воды во врем  строительства гидроузлов и заделываютс  в последующем бетонными перемычками посто нного исполнени .The invention relates to hydraulic engineering, in particular to temporary deep interfacial transitions, which are designed to pass water during the construction of waterworks and are subsequently sealed with concrete bridges of constant performance.

Целью изобретени   вл етс  экономи  средств, повышение надежности и расширение функциональных возможностей затвора за счет обеспечени  его работы после закрыти  перехода в качестве гидронепроницаемой перемычки посто нного исполнени .The aim of the invention is to save money, increase reliability and expand the functionality of the gate by ensuring its operation after closing the junction as a permanently made watertight jumper.

На чертеже представлен разрез перехода .The drawing shows a section of the transition.

Способ осуществл ют следующим образом .The method is carried out as follows.

На безопасном рассто нии от входного отверсти  1 перехода в воду 2 верхнего бьефа опускают эластичную оболочку 3 затвора и непосредственно перед закрытием перехода в оболочку 3 подают жидкооб- разное твердеющее вещество 4, преимущественно легкий бетонный раствор. Затвор, содержащий эластичную оболочку 3 и жид- кообразное твердеющее вещество 4, механическими средствами (не показаны) подт гивают к входному отверстию 1 перехода , после чего затвор потоком воды по подвод щему водоводу 5 вовлекаетс  в сужающуюс  затворную камеру 6 и перекрывает переход, при этом происходит опрес- сование твердеющего вещества 4 в оболочке 3 и плотное водонепроницаемое прижатие затвора к стенам затворной камеры 6.At a safe distance from the inlet 1 of the transition into the water 2 of the upper reach, the elastic sheath 3 of the shutter is lowered and immediately before the transition is closed, a liquid-like solidifying substance 4, preferably a lightweight concrete solution, is supplied to the shell 3. A shutter containing elastic sheath 3 and a liquid-like hardening substance 4 is pulled by mechanical means (not shown) to the inlet 1 of the junction, after which the shutter is drawn into the narrowed stopper chamber 6 by the flow of water and closes the junction the hardening substance 4 in the shell 3 is pressed and the shutter is tightly pressed against the walls of the shutter chamber 6.

Чем легче твердеющее вещество 4, например бетонный раствор (например,  чеистый бетон с объемным весом около 1,2 г/см), тем проще осуществл ют подт гивание затвора к входному отверстию 1 перехода.The lighter the hardening substance 4, for example, a concrete solution (for example, cellular concrete with a bulk weight of about 1.2 g / cm), the easier it is to tighten the gate to the inlet 1 of the junction.

Глубинный межбьефный переход включает эластичную оболочку 3 затвора, заполненную твердеющим веществом, и затворную камеру 6. Затворна  камера 6 имеет форму усеченного конуса, большее основание которого обращено в сторону верхнего бьефа и сопр гаетс  с подвод щим водоводом 5, а меньшее основание конуса обращено в сторону нижнего бьефа и сопр гаетс  с отвод щим водоводом 7 при этом площадь, поперечного сечени  подвод щего водовода 5 равна или больше площади большего основани  конуса, а диа- летр большего основани  конуса равен или больше диаметра затвора.The deep inter-ridge junction includes an elastic sheath 3 of the gate filled with a hardening substance and the shutter chamber 6. The shutter chamber 6 has the shape of a truncated cone, the larger base of which faces the upstream and mates with the inlet conduit 5, and the smaller base of the cone faces the downstream and mates with a discharge conduit 7 with the area, the cross-section of the supply conduit 5 is equal to or greater than the area of the larger base of the cone, and the diameter of the larger base of the cone is equal to or greater e diameter shutter.

После отвердени  вещества 4 (бетонного раствора) затвор превращаетс  в гидронепроницаемую перемычку посто нного исполнени  с расположением перемычки в затворной камере 6. Таким образом, временный затвор объединен с гкдронепроницае- мой перемычкой посто нного исполнени . В отвод щем, водоводе 7 уровень воды 8After solidification of substance 4 (concrete solution), the shutter turns into a waterproof plug of a permanent execution with the location of the jumper in the shutter chamber 6. Thus, the temporary shutter is combined with a permanent barrier of jumper. Water outlet 7 water level 8

устанавливаетс  в зависимости от уровн  воды в нижнем бьефе гидроузла.set depending on the water level in the downstream of the hydroelectric complex.

При дальнейшем повышении воды в верхнем бьефе до уровн  9 перемычка, имеюща  форму затворной камеры 6 (форму усеченного конуса) и отделенна  от стен камеры 6 оболочкой 3, под действием возрастающего давлени  воды со стороны верхнего бьефа перемещаетс  в пределах затворной камеры 6 в сторону нижнегоWith further increase of water in the upper reach to level 9, the jumper, having the form of a shutter chamber 6 (frustoconical shape) and separated from the walls of chamber 6 by a shell 3, under the action of increasing water pressure from the upstream side, moves within the limits of the shutter chamber 6 towards the lower

0 бьефа и плотно прижимаетс  к стенкам затворной камеры 6. При этом осуществл етс  восстановление устойчивости перемычки и посто нно обеспечиваетс  водонепроницаемость по контакту перемычки со стенами затворной камеры 6, котора  под0 pool and tightly pressed against the walls of the stopper chamber 6. In this case, the stability of the jumper is restored and the watertightness is constantly ensured by the contact of the jumper with the walls of the shutter chamber 6, which is under

5 действием возрастающего давлени  воды со стороны верхнего бьефа увеличивает свое поперечное сечение.5 by the action of increasing water pressure on the upstream side, increases its cross section.

Укрепительна  цементаци  10 вокруг затворной камеры 6 посредством глубиннойFortifying cementation 10 around the sealing chamber 6 by means of depth

цементации 11 и плиты 12 сопр жена с экраном 13 грунтовой плотины 14 (на чертеже плотина показана пунктиром), которую возвод т с опережением подъема уровн  воды в верхнем бьефе. Аэрационную трубу 15 ликвидируют путем устройства в ней проб5 ки 16. the cementation 11 and the plate 12 are associated with the screen 13 of the earth dam 14 (the dam is shown by a dotted line in the drawing), which is erected ahead of the rise of the water level in the upstream. Aeration pipe 15 is eliminated by the device in her sample 5 ki 16.

Переход может быть включен в работз путем разборки перемычки взрывом. Наличие толстой (обычно в несколько санти- Q метров) и -упругой оболочки 3, отдел ющей тепло перемычки от стен затворной камеры 6, позвол ет осуществить разборку перемычки без повреждени  облицовки затворной камеры 6.The transition can be included in the operation by disassembling the jumper by an explosion. The presence of a thick (usually several centimeters) meters and an elastic shell 3 separating the heat of the bridge from the walls of the sealing chamber 6 allows disassembling the bridge without damaging the facing of the sealing chamber 6.

3535

Claims (1)

1. Глубинный межбьефный переход, включающий водовод, соедин ющий верхний и нижний бьефы, затворную камеру переменного сечени  с входным отверстием со сто0 роны верхнего бьефа и выходным отверстием со стороны нижнего бьефа, затвор временного исполнени , выполненный из эластичной оболочки в виде заполненной герметизированной сферы, диаметр которой1. A deep inter-bump junction, comprising a conduit connecting the upper and lower pools, a variable cross-section shut-off chamber with an inlet on the side of the upstream and an outlet on the downstream side, a temporary interlock made of an elastic shell in the form of a filled sealed sphere, the diameter of which с больще диаметра выходного из затворной камеры отверсти , и гидронепроницаемую перемычку посто нного исполнени , отличающийс  тем, что, с целью экономии средств, повыщени  надежности и расщире- ни  функциональных возможностей затвораwith a larger diameter of the outlet from the shutter chamber of the opening, and a permanently waterproofed jumper, characterized in that, in order to save money, increase reliability and extend the functionality of the shutter 0 за счет обеспечени  его работы после закрыти  перехода в качестве гидронепроницаемой перемычки посто нного исполнени , полость эластичной оболочки затвора заполнена твердеющим веществом, местоположение затворной камеры совмещено с место5 положением гидронепроницаемой перемычки посто нного исполнени , а площадь поперечного сечени  части водовода, расположенной со стороны верхнего бьефа от зат14374730 by ensuring its operation after closing the junction as a permanently made waterproof junction, the cavity of the elastic sheath of the gate is filled with a hardening substance, the location of the sealing chamber is aligned with the position of the waterproof junction of the continuous junction, from dat1437473 3434 верной камеры, равна или больше площа-тичной оболочки затвора заполн ют жидкоди входного в затворную камеру отверсти .образным твердеющим веществом, а уста2 . Способ закрыти  глубинного меж-навливают затвор в затворную камеру, доthe correct chamber, equal to or greater than the flat shell of the shutter, fills the liquid in the opening of the inlet to the shutter chamber with a shaped hardening substance, and the mouth 2. The way to close the deep inter-pour the shutter into the shutter chamber, to бьефного перехода, при котором заполн ютотвердени  вещества в полости оболочки,the bypass transition, in which the hardening of a substance in the shell cavity is filled, полость эластичной оболочки затвора и уста-3. Способ по п. 2, отличающийс cavity elastic sheath shutter and mouth-3. The method according to claim 2, wherein навливают затвор в затворную камеру пу- тем, что полость эластичной оболочки заттем вовлечени  его в переход потокомвора заполн ют легким бетонным раствоводы , отличающийс  тем, что полость элас-ром.The gate is poured into the shutter chamber by the fact that the cavity of the elastic shell, after engaging it in the transition, is filled with light concrete mortars, which are characterized by the fact that the cavity is elasom.
SU864138457A 1986-10-22 1986-10-22 Deep-water passage between ponds and method of closing same SU1437473A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864138457A SU1437473A1 (en) 1986-10-22 1986-10-22 Deep-water passage between ponds and method of closing same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864138457A SU1437473A1 (en) 1986-10-22 1986-10-22 Deep-water passage between ponds and method of closing same

Publications (1)

Publication Number Publication Date
SU1437473A1 true SU1437473A1 (en) 1988-11-15

Family

ID=21264216

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864138457A SU1437473A1 (en) 1986-10-22 1986-10-22 Deep-water passage between ponds and method of closing same

Country Status (1)

Country Link
SU (1) SU1437473A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 897930, кл. Е 02 В 8/04, 1979. Авторское свидетельство СССР № 350898, кл. Е 02 В 3/16, 1970. *

Similar Documents

Publication Publication Date Title
EP1029131B1 (en) Fishway system
CN100590323C (en) Controllable siphon discharging device and operation method for reservoir drainage or flood discharge
CN108222009A (en) The construction method and device of the underwater back cover of large-area deep foundation pit are carried out using small hopper
CN109139059A (en) A kind of osmotic grouting suitable for shield tunnel integrates stick and construction method
SU1437473A1 (en) Deep-water passage between ponds and method of closing same
CN208251170U (en) A kind of basement advanced water-stopping type post-cast strip locking device
CN206529750U (en) A kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel
CN102912795B (en) Device and method for stopping leakage by grouting low-heat asphalt
US2447937A (en) Method of laying submerged pipe
CN208950609U (en) A kind of integrated stick of the osmotic grouting suitable for shield tunnel
CN206916904U (en) A kind of flexible water sealing structure
CN208701712U (en) A kind of assembled protective slope structure
SU1544875A1 (en) Method of constructing water-impervious stoppage in deep inter-pond passage
CN208201877U (en) The constructing device of the underwater back cover of large-area deep foundation pit is carried out using small hopper
SU1569371A1 (en) Water outlet
CN109706932A (en) A kind of solution cavity stopper structure and construction method
SU1382907A1 (en) Method and apparatus for constructing deep water intake structure
SU1073365A1 (en) Method of erecting dams of earth materials
US5284402A (en) System for the manufacture and installation of selective intake towers in reservoirs
CN207419235U (en) A kind of pile extension under water structure
CA2071018A1 (en) System for the manufacture and installation of selective intake towers in reservoirs
TWI826222B (en) Teaching device and operation method for simulating sluice gates and pumping stations
JPS62101759A (en) Grount filling method
SU1030471A1 (en) Concrete dam on rock base
SU829770A1 (en) Method of constructing a dam of locally available materials