CN206529750U - A kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel - Google Patents

A kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel Download PDF

Info

Publication number
CN206529750U
CN206529750U CN201720036828.1U CN201720036828U CN206529750U CN 206529750 U CN206529750 U CN 206529750U CN 201720036828 U CN201720036828 U CN 201720036828U CN 206529750 U CN206529750 U CN 206529750U
Authority
CN
China
Prior art keywords
water
tunnel
diversion tunnel
conveyance
diversion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720036828.1U
Other languages
Chinese (zh)
Inventor
陈为博
王恒乐
潘益斌
黄东军
徐江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201720036828.1U priority Critical patent/CN206529750U/en
Application granted granted Critical
Publication of CN206529750U publication Critical patent/CN206529750U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model is related to a kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel.The purpose of this utility model is to provide a kind of water-conveyance tunnel of simple and effective utilization reconstruction of diversion tunnel, it is intended that reduce new construction scale, cost saving as far as possible.The technical solution of the utility model is:Using the water-conveyance tunnel of reconstruction of diversion tunnel, including original diversion tunnel, its spy is to pour tower intake vertically in the import of diversion tunnel, and the crest level of the tower intake is on Sediment Siltation elevation, under level of dead water elevation;Pre-buried water conveyance steel tube in concrete plug, concrete plug is set inside diversion tunnel, and water conveyance steel tube extends to water conservancy diversion hole outlet.The utility model is applied to middle-size and small-size Hydraulic and Hydro-Power Engineering.

Description

A kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel
Technical field
The utility model is related to a kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel.Suitable for middle-size and small-size Hydraulic and Hydro-Power Engineering.
Background technology
In the prior art, the inlet of diversion tunnel elevation in Hydraulic and Hydro-Power Engineering is than relatively low, using reconstruction of diversion tunnel into Newly-built water inlet, water-conveyance tunnel, vertical shaft (or inclined shaft) and diversion tunnel are generally needed using the form of " dragon comes back " during water-conveyance tunnel Connect, project scale is larger.
The content of the invention
The technical problems to be solved in the utility model is:For above-mentioned situation, there is provided a kind of simple and effective utilization water conservancy diversion The water-conveyance tunnel of hole reconstruction, it is intended that reduce new construction scale, cost saving as far as possible.
The technical scheme that the utility model is used is:Utilize the water-conveyance tunnel of reconstruction of diversion tunnel, including original water conservancy diversion Hole, its spy is to pour tower intake vertically in the import of diversion tunnel, and the crest level of the tower intake is high in Sediment Siltation On journey, under level of dead water elevation;Pre-buried water conveyance steel tube in concrete plug, concrete plug is set inside diversion tunnel, it is defeated Water steel pipe extends to water conservancy diversion hole outlet.
The centre of the tower intake is water inlet vertical shaft, and water inlet shaft top is equipped with fixed trash rack, diversion tunnel upstream Side head sets blocking sluice gate of diversion tunnel groove, and tower intake bottom has stiling basin.
Blocking sluice gate of diversion tunnel framed bent is had at the top of the tower intake, with rock ballast between tower intake and massif Backfill.
The water conveyance steel tube is being provided with maintenance valve and energy dissipating valve close to exit.
The beneficial effects of the utility model are:The utility model scheme is to be reconstructed into water delivery tunnel based on classical diversion tunnel Hole, tower intake is arranged using in inlet of diversion tunnel;Tower intake crest level is on Sediment Siltation elevation, level of dead water high Under journey;The pre-buried water conveyance steel tube in newly-built concrete plug, plug in diversion tunnel, steel pipe extends to the side such as water conservancy diversion hole outlet Method, it is simple, practical, effectively by former reconstruction of diversion tunnel into water-conveyance tunnel, reduce project scale, save construction investment.
Brief description of the drawings
Fig. 1 is sectional elevation of the utility model along water (flow) direction.
Fig. 2 is water inlet upstream elevation in Fig. 1.
Fig. 3 is the sectional drawing of diversion tunnel closure plug in Fig. 1.
Embodiment
As shown in Figure 1 and Figure 2, the present embodiment utilizes reconstruction of diversion tunnel water-conveyance tunnel, and original diversion tunnel 8 is located in massif, Gentle dip extends to the abrupt slope 14 in massif downstream.This example is at the import of diversion tunnel 8 with vertical tower of concreting Water inlet 1, the crest level of the tower intake is on Sediment Siltation elevation, under level of dead water elevation, in tower intake 1 Between fixed trash rack 3 and blocking sluice gate of diversion tunnel framed bent 2 are housed for water inlet vertical shaft 4, water inlet shaft top.In the upper of diversion tunnel 8 Swim side head and blocking sluice gate of diversion tunnel groove 6 is set, stiling basin 7 is had in the bottom of tower intake 1.
As shown in figure 3, the inside of diversion tunnel 8 sets concrete plug 9, and the pre-buried water conveyance steel tube in concrete plug 10, water conveyance steel tube extends to diversion tunnel 8 and exported, and the water conveyance steel tube 10 is being provided with maintenance valve 12 and energy dissipating close to exit Valve 13.
Backfilled between tower intake 1 and massif with rock ballast 5.
The top of current from tower intake 1 is fallen, and is flowed out after the energy dissipating of stiling basin 7 from diversion tunnel 8, finally from abrupt slope 14 Leak into korneforos.

Claims (4)

1. a kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel, including original diversion tunnel (8), its spy are:In diversion tunnel (8) Import pours tower intake (1) vertically, the crest level of the tower intake is on Sediment Siltation elevation, level of dead water elevation it Under;Pre-buried water conveyance steel tube (10) in concrete plug (9), concrete plug, water conveyance steel tube extension are set inside diversion tunnel (8) To diversion tunnel (8) outlet.
2. the water-conveyance tunnel of utilization reconstruction of diversion tunnel according to claim 1, it is characterised in that:The tower intake (1) centre is water inlet vertical shaft (4), and water inlet shaft top is equipped with fixed trash rack (3), and diversion tunnel (8) upstream side termination is set Blocking sluice gate of diversion tunnel groove (6), tower intake (1) bottom has stiling basin (7).
3. the water-conveyance tunnel of utilization reconstruction of diversion tunnel according to claim 2, it is characterised in that:The tower intake (1) blocking sluice gate of diversion tunnel framed bent (2) is had at the top of, tower intake (1) is backfilled between massif with rock ballast (5).
4. the water-conveyance tunnel of the utilization reconstruction of diversion tunnel according to claim 1 or 2 or 3, it is characterised in that:The water delivery steel Manage (10) and be provided with maintenance valve (12) and energy dissipating valve (13) close to exit.
CN201720036828.1U 2017-01-12 2017-01-12 A kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel Active CN206529750U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720036828.1U CN206529750U (en) 2017-01-12 2017-01-12 A kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720036828.1U CN206529750U (en) 2017-01-12 2017-01-12 A kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel

Publications (1)

Publication Number Publication Date
CN206529750U true CN206529750U (en) 2017-09-29

Family

ID=59917289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720036828.1U Active CN206529750U (en) 2017-01-12 2017-01-12 A kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel

Country Status (1)

Country Link
CN (1) CN206529750U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083086A (en) * 2018-08-31 2018-12-25 中国电建集团西北勘测设计研究院有限公司 A kind of reservoir emptying under power station high dam state of emergency water impoundment method again
CN109555090A (en) * 2019-01-15 2019-04-02 中国电建集团华东勘测设计研究院有限公司 Ecological flow for hydroenergy storage station is released facility and implementation method
CN112323740A (en) * 2020-10-26 2021-02-05 长江勘测规划设计研究有限责任公司 Integrated 'leading-blocking-leading' multifunctional temporary ecological water drainage device and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083086A (en) * 2018-08-31 2018-12-25 中国电建集团西北勘测设计研究院有限公司 A kind of reservoir emptying under power station high dam state of emergency water impoundment method again
CN109555090A (en) * 2019-01-15 2019-04-02 中国电建集团华东勘测设计研究院有限公司 Ecological flow for hydroenergy storage station is released facility and implementation method
CN109555090B (en) * 2019-01-15 2024-04-09 中国电建集团华东勘测设计研究院有限公司 Ecological flow discharge facility for pumped storage power station and implementation method
CN112323740A (en) * 2020-10-26 2021-02-05 长江勘测规划设计研究有限责任公司 Integrated 'leading-blocking-leading' multifunctional temporary ecological water drainage device and method

Similar Documents

Publication Publication Date Title
CN100590323C (en) Controllable siphon discharging device and operation method for reservoir drainage or flood discharge
CN206529750U (en) A kind of water-conveyance tunnel of utilization reconstruction of diversion tunnel
CN104963322B (en) A kind of key water control project facility
CN201762694U (en) Dam flow guiding device
CN204023486U (en) Structure for providing downward discharge ecological flow for initial reservoir storage
CN105951689B (en) A kind of reservoir let out in advance and ecological flow under let out structure
CN109267549A (en) Diversion tunnel structure
CN105386426B (en) The ecological drainage tunnel and method that diversion tunnel reconstruction controls for gates of segmental shape
CN205296100U (en) Husky equipment is arranged in reservoir segmentation
CN106930230A (en) The governing system and method for a kind of tidal black-odor riverway of single-pass
CN202440787U (en) Riverway diversion device
CN103410129A (en) Multistage step drop energy dissipater structure
CN205348132U (en) Tower water inlet of bank
CN208501611U (en) A kind of device for realizing beheaded river one-way flow using tide
CN203411959U (en) Multi-step type drop combination energy dissipater structure
CN207512707U (en) A kind of stiling basin for laying novel evacuation system
CN106122122B (en) A kind of large aperture flow-controllable siphoning installation
CN105839597B (en) Flow-stopping plate cut-off equipment and method
CN104727267B (en) It is a kind of to form the compound shingle trap of longitudinal spiral stream sediment trapping sand discharge
CN209493909U (en) A kind of aqueduct is across reservoir point water intaking structure
CN210127461U (en) Install conduit on reservoir draws to one side and contains
CN203729376U (en) Water intake well pipe structure used for hydraulic and hydropower engineering
CN103614986A (en) Free surface flow water inflow method suitable for draining off floodwaters of tailing pond
RU2562205C2 (en) Method of creation of adjustable free flowing water flow and device for its implementation
CN200998612Y (en) Round medium ring desilting basin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant