SU1414920A1 - Suspension bridge - Google Patents

Suspension bridge Download PDF

Info

Publication number
SU1414920A1
SU1414920A1 SU864163054A SU4163054A SU1414920A1 SU 1414920 A1 SU1414920 A1 SU 1414920A1 SU 864163054 A SU864163054 A SU 864163054A SU 4163054 A SU4163054 A SU 4163054A SU 1414920 A1 SU1414920 A1 SU 1414920A1
Authority
SU
USSR - Soviet Union
Prior art keywords
cables
pylons
bridge
stiffness
fixed
Prior art date
Application number
SU864163054A
Other languages
Russian (ru)
Inventor
Виталий Николаевич Шимановский
Михаил Михайлович Жербин
Ньи Хай Нгуен
Original Assignee
Государственный Проектный И Научно-Исследовательский Институт "Укрниипроектстальконструкция"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственный Проектный И Научно-Исследовательский Институт "Укрниипроектстальконструкция" filed Critical Государственный Проектный И Научно-Исследовательский Институт "Укрниипроектстальконструкция"
Priority to SU864163054A priority Critical patent/SU1414920A1/en
Application granted granted Critical
Publication of SU1414920A1 publication Critical patent/SU1414920A1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Изобретение относитс  к мостостроению и может быть использовано при сооружении двухпо сных вис чих мостов. Целью изобретени   вл етс  снижение материалоемкости конструкции , увеличение жесткости настила и уменьшение его S-образного изгиба. Вис чий мост включает береговые 1 и анкерные 2 опоры, пилоны 3, закрепленные одними концами на их вершинах несущие кабели 4 и 5 , другими концаJ « ми закрепленные на береговых опорах 1. Отт жками 6 пилоны 3 соединены с анкерными опорами 2. Настил проезжей части 7 вьтолнен в виде двух участков сборной из блоков 8 балки 9 жесткости переменной высоты, очерченной снизу по кривым провисани  от нагрузки несущих кабелей 4 и 5, где они расположены ниже проезжей части 7. Несущие кабели 4 и 5 на участках, где они проход т выше проезжей части 7, расположены в плане за боковыми плоскост ми балки 9 жесткости, а на участках, где они проход т ниже проезжей части 7 - под балкой 9 жесткости равномерно по ее ширине. Несущие кабели 4 и 5 жестко соединены между собой в точках 10 взаимного пересечени  , а под балкой 9 жесткости кабели 4 и 5 расположены в пазах блоков 8,  вл  сь опорами дл  поперечных балок блоков 8. При большой величине- про-, лета вис чего моста балка 9 жесткости может быть разбита на три и более равных по дпине участков переменной высоты, при этом средние участки опираютс  снизу на несущие кабели, все концы которых закреплены на вершинах пилонов 3. 1 3.п. ф-лы, 4 ил. (У)The invention relates to bridge construction and can be used in the construction of double-axle bridge bridges. The aim of the invention is to reduce the material consumption of the structure, increase the rigidity of the flooring and reduce its S-shaped bending. The bridge includes coastal 1 and anchor 2 supports, pylons 3, carrying cables 4 and 5 fixed at their tips at their peaks, and fixed at the ends of the cords on shore supports 1. Pylons 3 are connected to anchor supports 2 by means of 6. Flooring 7 is made in the form of two sections of a national team from blocks 8 of a beam 9 of stiffness of variable height delineated below by sagging curves from the load of carrying cables 4 and 5, where they are located below the carriageway 7. Bearing cables 4 and 5 in areas where they pass roadway 7 are located plane of the side planes stiffening girder 9, and in regions where they pass below the roadway 7 - 9 under the beam stiffness uniformly across its width. Carrier cables 4 and 5 are rigidly interconnected at intersection points 10, and under rigidity beam 9, cables 4 and 5 are located in the slots of blocks 8, supporting the transverse beams of blocks 8. With a large value of the bridge, Beam 9 stiffness can be broken into three or more equal to each other spans of variable height, while the middle sections are supported on the bottom of the carrier cables, all ends of which are fixed on the tops of the pylons 3. 1 3.p. f-ly, 4 ill. (Y)

Description

cpui.lcpui.l

Изобретение относитс  к мостостроению и может быть использовано при сооружении двухпо сных вис чих мостов.. .The invention relates to bridge construction and can be used in the construction of two-way bridge bridges ...

Цель изобретени  - снижение материалоемкости конструкции, увеличение жесткости настила и уменьшение его S-образного изгиба.The purpose of the invention is to reduce the material consumption of the structure, increase the rigidity of the flooring and reduce its S-shaped bending.

« На фиг. 1 изображен фасад моста с двум  участками балки жесткости; на фиг. 2 - то же, вид сверху; на фиг.З- фасад моста с трем  участками балки жесткости; на фиг. 4 - то же, вид сверху.“In FIG. 1 shows the facade of a bridge with two sections of a stiffening beam; in fig. 2 - the same, top view; on fig.Z- the facade of the bridge with three sections of the beam stiffness; in fig. 4 - the same, top view.

: Вис чий мост включает береговые 1 ;и анкерные 2 опоры, пилоны 3, aakpen- 1ленные одними концами ;на их вершинах |несу1цие кабели 4 и 5, другими конца- |Ми закрепленные на береговых опорах |1. Отт жками 6 пилоны 3 соединены с . 1анкерными опорами 2. Настил проезжей |Части 7 выполнен в виде двух участков fcборной из блоков 8 балки 9 жесткос- ти переменной высоты, очерченной снизу по кривым провисани  от нагрузки biecyinHx кабелей 4 и 5 .где они расположены ниже проезжей части 7. Несущие кабели 4 и 5 на участках, где рни проход т выше проезжей части 7, (расположены в плане за боковыми плос- р:ост ми балки 9 жесткости, а на уча- Ьт.ках, где они проход т ниже проезжей Части 7 - под балкой 9 жесткости рав- йомерно по ее ширине.: The bridge contains coastal 1; and anchor 2 supports, pylons 3, aakpen- 1 at one end, on their tops | unsupported cables 4 and 5, at the other ends- | MI fixed on the coastal supports | 1. By holes 6 pylons 3 are connected with. 1 anchor supports 2. The roadway laying | of part 7 is made in the form of two sections of the assembly of blocks 8 of the beam 9 of the rigid structure of variable height, outlined below by the sagging curves from the load biecyinHx of cables 4 and 5. where they are located below the carriageway 7. Support cables 4 and 5 in the areas where the pipes pass above the carriageway 7, (located in the plan behind the side planes: with the remaining rigidity beams 9, and in the sections where they pass below the carriageway 7) under the beam 9 stiffness is equal to its width.

Несущие кабели 4 и 5 жестко соединены между собой в точках 10 взаимного пересечени , а под балкой 9 жесткости кабели 4 и 5 расположены в пазах блоков 8,  вл  сь опорами дл  поперечных балок 11 блоков 8.The carrier cables 4 and 5 are rigidly interconnected at the points of mutual intersection 10, and under the stiffening beam 9 the cables 4 and 5 are located in the slots of the blocks 8, supporting the transverse beams 11 of the blocks 8.

0 0

0 50 5

00

При большой величине пролета вис чего моста балка 9 жесткости может быть разбита на три или более равных по длине участка переменной высоты, при этом средние участки 12 опираютс  снизу на несущие кабели 13, все концы которых«закреплены на вершинах пилонов 3.With a large span of a bridge, the stiffening beam 9 can be broken into three or more equal in length to a section of variable height, while the middle sections 12 rest on the supporting cables 13, all ends of which are fixed on the tops of the pylons 3.

Claims (2)

1.Вис чий мост, включающий береговые опоры, пилоны, настил проезжей части, несущие, поддерживающие настил проезжей части, кабели, пересекающиес  между сббой и-закрепленные одним концом за пилоны, отличающийс  тем, что, с целью снижени  материалоемкости конструкции, увеличени  жесткости настила и уменьшени  его S-образного изгиба, настил проезжей части вьтолнен в виде двух участков балки жесткости переменного сечени , очерченного снизу по кривым провисани  от нагрузки несущих кабелей , другие концы которых закреплены к береговым опорам, причем вьште про-. езжей части несушке кабели расположены за боковыми плоскост ми балки жесткости , а ниже проезжей части. - под балкой жесткости равномерно по ее. ширине и жестко соединены между собой1. A new bridge, including shore supports, pylons, road pavement, supporting, supporting road pavement, cables intersecting between sbbe and fixed at one end of the pylons, characterized in that, in order to reduce the material intensity of the structure, increase the rigidity of the floor and reducing its S-shaped bend, the flooring of the carriageway is executed in the form of two sections of a stiffness beam of variable cross section, outlined below by sagging curves from the load of carrier cables, the other ends of which are fixed to the shore supports, wich vyshte pro-. In the other part of the hen, the cables are located behind the side planes of the rigidity beam, and below the roadway. - under the beam stiffness evenly over it. wide and rigidly interconnected в точках пересечени .at the intersection points. 2.Мост по п. 1, отличаю- щ и и с   тем, что балка жесткости выполнена по длине из трех и более участков пер еменного сечени , средние из которых оперты снизу на несущие кабели, все концы которых прикреплены к пилонам. .2. The bridge according to claim 1 is different from the fact that the stiffening beam is made along the length of three or more sections of alternating cross-section, the middle of which are supported on the bottom of the carrier cables, all ends of which are attached to the pylons. .
SU864163054A 1986-12-18 1986-12-18 Suspension bridge SU1414920A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864163054A SU1414920A1 (en) 1986-12-18 1986-12-18 Suspension bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864163054A SU1414920A1 (en) 1986-12-18 1986-12-18 Suspension bridge

Publications (1)

Publication Number Publication Date
SU1414920A1 true SU1414920A1 (en) 1988-08-07

Family

ID=21273519

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864163054A SU1414920A1 (en) 1986-12-18 1986-12-18 Suspension bridge

Country Status (1)

Country Link
SU (1) SU1414920A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Петропавловский А.А. и др. Винтовые мосты. - М.: Транспорт, 1985, с. 13, рис. 1.11. Качурин В.К. и др. Проектирование вис чих и винтовых мостов. - М.: Транспорт, 1971, с. 118-119, рис. IV-32. . *

Similar Documents

Publication Publication Date Title
NO860236L (en) Truss structure.
CA1184711A (en) Stiffening girder for a stayed cable bridge
PT90101B (en) TRAY FOR LARGE LUG BRIDGE
ATE37413T1 (en) STEEL BEAM.
US4831675A (en) Orthotropic steel plate deck bridge with a double rib system
EA031238B1 (en) Space stay-cable truss
SU1414920A1 (en) Suspension bridge
US3460446A (en) Bridge type highway of reinforced or prestressed concrete
KR100431403B1 (en) Complex bridge
CN217758293U (en) Three-tower cable-stayed bridge structure system beneficial to improving structural rigidity
SU1649014A1 (en) Bridge metal span structure
US4480348A (en) Tension-band bridge
SU1622491A1 (en) Superstructure of one-way track bridge
RU95120911A (en) SPAN STRUCTURE OF A METAL BRIDGE WITH A SANDLESS WAY
CN215482226U (en) Steel truss girder of highway-railway combined-construction cable-stayed bridge
SU1209795A1 (en) Guy-rope truss
SU620566A1 (en) Multispan roof
SU975951A1 (en) Roof spatial block
RU2068907C1 (en) Multiple-cable suspension bridge
SU1184915A1 (en) Skeleton of single-storey building
SU688549A1 (en) Bridge
RU2057835C1 (en) Suspension bridge
SU1216273A1 (en) Reinforcement structure for steel-ferroconcrete bridge span
RU2016953C1 (en) Beam solid bridge
SU747958A1 (en) Roof for building and structures