SU1186739A1 - Method of protecting buildings and structures from harmful influence of underground mining of suit of seams - Google Patents
Method of protecting buildings and structures from harmful influence of underground mining of suit of seams Download PDFInfo
- Publication number
- SU1186739A1 SU1186739A1 SU833597028A SU3597028A SU1186739A1 SU 1186739 A1 SU1186739 A1 SU 1186739A1 SU 833597028 A SU833597028 A SU 833597028A SU 3597028 A SU3597028 A SU 3597028A SU 1186739 A1 SU1186739 A1 SU 1186739A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- formation
- boundaries
- pillar
- angles
- safety pillar
- Prior art date
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
СПОСОБ ОХРАНБ1 ЗДАНИЙ И СООРУЖЕНИЙ ОТ ВРЕДНОГО ВЛИЯНИЯ ПОДЗЕМНОЙ РАЗРАБОТКИ СВИТЫ ПЛАСТОВ, включающий предварительную отработку пласта до границ предохранительного целика под охран емым объектом и отработку нижележащих пластов в пределах предохранительного целика по окончании процесса сдвижени горных пород после выемки полезного ископаемого по предварительно отработанному пласту, огличающийс тем, что, с целью предотвращени опасных деформаций земной поверхности в основании охран емых объектов без увеличени потерь полезного ископаемого в недрах при преобладании в подрабатываемом массиве пластичных пород предварительную отработку пласта до границы предохранительного целика, построенного относительно границ охран емой площади по углам сдвижени , осуществл ют на глубине , не превыщающей высоты, образующейс над выработанным пространством зоны сообщающихс между собой трещин, а i нижележащие пласты отрабатывают до линий их пересечени с плоскост ми, проход (Л щими под углами разрывов к горизонту через границы предохранительного целика, оставленного по предварительно отработанному пласту.METHOD OHRANB1 buildings and structures from the harmful effects of underground mining FORMATION formation comprising a preliminary testing of the formation to boundaries protective pillar under guards emym object and testing of the underlying layers within the protective pillar at the end of the process of displacement of rock after excavation of minerals and to the spent reservoir, oglichayuschiys the that in order to prevent dangerous deformations of the earth’s surface at the base of protected objects without increasing losses fossil in the subsoil, when plastic rocks predominate in the underworked massif, preliminary formation of the reservoir to the boundary of the safety pillar, built relative to the boundary of the protected area at displacement angles, is carried out at a depth not exceeding the height formed above the developed space of the zone of interconnecting cracks, and i the underlying strata work up to the lines of their intersection with the planes, the passage (breaking at angles of gaps to the horizon through the boundaries of the safety pillar, left Wow on the pre-developed reservoir.
Description
0000
О5O5
со хwith x
Изобретение относитс к горной промышленности и предназначено дл охраны зданий и сооружений от вредного вли ни подземной разработки свиты пластов.The invention relates to the mining industry and is intended to protect buildings and structures from the harmful effects of the underground development of a suite of formations.
Цель изобретени - предотвращение опасных деформаций земной поверхности в основании охран емых объектов без увеличени потерь полезного ископаемого в недрах при преобладании в подрабатываемом массиве пластичных пород.The purpose of the invention is to prevent dangerous deformations of the earth's surface at the base of protected objects without increasing the loss of minerals in the subsoil, with plastic rocks predominating in the underworked mass.
Способ осуществл етс следующим образом .The method is carried out as follows.
Предварительно отрабатывают до границ предохранительного целика, построенного по углам сдвижени , верхний пласт, глубина залегани которого в пределах предохранительного целика не превышает высоты, образующейс над выработанным пространством зоны сообщающихс между собой трещин. После окончани процесса сдвижени горных пород над очистным пространством по предварительно отработанному пласту отрабатывают нижележащие пласты до линий их пересечени с плоскост ми , проход щими под углами разрывов к горизонту через границы предохранительного целика, оставленного по предварительно отработанному пласту.The upper layer, the depth of which within the safety column does not exceed the height formed over the developed space of the zone of interconnected cracks, is worked up to the boundaries of the safety pillar, built on the angles of displacement. After the process of moving the rocks above the treatment space over the previously spent formation is completed, the underlying formations are worked up to their intersection lines with planes passing at the angles of discontinuities to the horizon through the boundaries of the safety pillar left on the previously developed formation.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833597028A SU1186739A1 (en) | 1983-05-26 | 1983-05-26 | Method of protecting buildings and structures from harmful influence of underground mining of suit of seams |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833597028A SU1186739A1 (en) | 1983-05-26 | 1983-05-26 | Method of protecting buildings and structures from harmful influence of underground mining of suit of seams |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1186739A1 true SU1186739A1 (en) | 1985-10-23 |
Family
ID=21065493
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833597028A SU1186739A1 (en) | 1983-05-26 | 1983-05-26 | Method of protecting buildings and structures from harmful influence of underground mining of suit of seams |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1186739A1 (en) |
-
1983
- 1983-05-26 SU SU833597028A patent/SU1186739A1/en active
Non-Patent Citations (1)
Title |
---|
Гвирцман Б. Я. и др. Безопасна выемка угл под водными объектами. -М.: Недра, 1977, с. 57-71. Авторское свидетельство СССР № 1146450, кл. Е 02 D 31/08, 28.03.83. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4265570A (en) | Mine roof control | |
RU2109948C1 (en) | Method of optimized orientation of breakage faces, specifically on coal deposit | |
SU1186739A1 (en) | Method of protecting buildings and structures from harmful influence of underground mining of suit of seams | |
Page | Geology of the Broadway Tunnel, Berkeley Hills, California | |
Sauer et al. | NATM ground support concepts and their effect on contracting practices: Proc 1989 Rapid Excavation and Tunnelling Conference, Los Angeles, 11–14 June 1989 P67–86. Publ Littleton: SME, 1989 | |
SU1239329A1 (en) | Method of protecting undermined objects | |
Obert et al. | Underground Borate Mining, Kern County, Calif | |
SU1089265A1 (en) | Method of protecting mine workings for water break-ins | |
SU1134714A1 (en) | Mineral deposit strip-mining process | |
RU2010953C1 (en) | Method of determination of cracks spreading height in basic zone of working | |
SU1028846A1 (en) | Method of mining steep ore deposit | |
SU891948A1 (en) | Method of controlling deformation of undercut rock body | |
RU1774995C (en) | Method of protecting chipped-away structures | |
SU1146450A1 (en) | Method of protecting undermined structures and natural objects when working suits of mineral beds | |
McMahon | Engineering seismic refraction surveys over Elura | |
SU1580006A1 (en) | Method of protecting steep outburst-prone coal seams from gas dynamic effects | |
RU2150001C1 (en) | Method of mining thick gassy flat seams (versions) | |
SU1562451A1 (en) | Method of safegurading vertical shafts | |
SU1795100A1 (en) | Method for mining thick steeply dipping coal seams | |
RU2081250C1 (en) | Method for protection of undermined buildings | |
SU991052A1 (en) | Method of cutting adjoining gently-sloping beds separated by low-strength interlay | |
SU1209894A1 (en) | Method of preventing spontaneous outbursts in elevated rock pressure zones | |
SU1500789A1 (en) | Method of protecting coal seam against gas-dynamic manifestations | |
SU1164368A1 (en) | Method of protecting structures against falling-through | |
SU909224A1 (en) | Method of filling an excavated space |