SU1121439A1 - Method of preparing and mining steep mineral beds - Google Patents
Method of preparing and mining steep mineral beds Download PDFInfo
- Publication number
- SU1121439A1 SU1121439A1 SU833641711A SU3641711A SU1121439A1 SU 1121439 A1 SU1121439 A1 SU 1121439A1 SU 833641711 A SU833641711 A SU 833641711A SU 3641711 A SU3641711 A SU 3641711A SU 1121439 A1 SU1121439 A1 SU 1121439A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- cables
- minerals
- strip
- compensation space
- transport
- Prior art date
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
СПОСОБ ПОДГОТОВКИ И РАЗРАБОТКИ КРУТОПАДАЩИХ ПЛАСТОВ ПОЛЕЗНЫХ ИСКОПАЕМЫХ, включаюпщй проведение транспортной выработки в днище выемочного участка, подсечку выемочного участка, бурение и взрывание скважин, отбойку запасов полезного ископаемого вертикальными полосами, магазинирование полезного ископаемого и выпуск его под защитой перекрыти , о тличающийс тем, что, с целью снижени потерь полезного ископаемого , над транспортной вьфаботкой проход т параллельную выработку, подсечку катаюй полосы осуществл ют проведением на границах полосы ниш из транспортной и параллельной выработок на всю мощность пласта, между нишами формируют компенсационное пространство, на бортах и днище которого располагают тросы, отбойку запасов полосы производ т на указанное компенсационное пространство, перекрытие над которым формируют поочередным нат жением тросов, а после вьшуска полезного ископаемого из компенсационного пространства перепускают в него замагазинированное в отбитой полосе полезное ископаемое путем перемещени тросов на днище компенсационного пространства. / 4 hr OOOQQMETHOD OF PREPARATION AND DEVELOPMENT steep seams MINERALS, vklyuchayupschy holding transport generation in the bottom excavation site, sweeps excavation site, drilling and blasting boreholes, breaking of mineral reserves vertical stripes magazinirovanie minerals and release it under the protection of overlap of tlichayuschiys in that in order to reduce the loss of minerals, parallel production is carried out above the transport lamination, the cutting of the katai strip is carried out by passing to the edge From the strip of niches from the transport and parallel workings to the entire thickness of the reservoir, a compensation space is formed between the niches, the cables are placed on the sides and the bottom, strips are broken into the specified compensation space, the overlapping over which is formed by alternating tension of the cables of the fossil from the compensation space, minerals in the broken strip are marshed into it by moving the cables to the bottom of the compensation space properties. / 4 hr OOOQQ
Description
Изобретение относитс к горному дапу н предназначено дл подземной разработки крутопадагоа(их пластов полезнык ископаемых. Известен способ разработки рудных месторо щений, включающий проведение подсечной выработки, крепление этой вьфаботки железобетонной крепью обрушение запасов блока, выпуск руды через люковые окна крепи и демонтаж тюбингов крепи Cl Недостатками известного способа вл ютс значительна стоимость тю .бингов и высока трудоемкость возведени и демонтажа крепи, а также потери перестановке крепи. Наиболее близким по технической сущности и достигаемому результату вл етс способ подготовки и разрабо ки крутопадающих пластов полезных ис копаемых, включаюп ий проведение тран спортной выработки в днище выемочного участка, подсечку выемочного учас ка, бурение и взрывание скражин, отбойку запасов полезного ископаемого вертикальными полосами, магазинирова ние полезного ископаемого и выпуск его под защитой перекрыти 2. Недостатком этого способа вл ютс потери руды, св занные с образованием застойных зон при ее вьшуске. Цель изобретени - снижение потерь полезного ископаемого. Поставленна цель достигаетс тем что согласно способу подготовки и разработки крутопадающих пластов полезных ископаемых, включающему проведение транспортной выработки в днище выемочного участка, подсечку выемочного участка, бурение и взрыва ние скважин, отбойку запасов полезно го ископаемого вертикальными полосами , магазинирование полезного ископа емого и вьтуск его под защитой перекрыти , над транспортной выработкой проход т параллельную вьгработку, подсечку каждой полосы осуществл ют проведением ниш из транспо)тной и параллельной вьфаботок на всю мощность пласта, между нищами формируют компенсационное пространство, на бор тах и днище которого расГполагают тросы, отбойку запасов полосы производ т на указанное компенсационное пространство, перекрытие над которым форьшру от поочередным нат жением тро сов, а после выпуска полезного ископаемого из компенсационного простран ства перепускают в него замагазиниро ванное в отбитой полосе полезное ископаемое путем перемещени тросов крепи на днище компенсационного пространства . На фиг. 1 изображена начальна стади подготовки днища камеры; на фиг. 2 - стади выпуска полез5 ого ископаемого из камеры в компенсационное пространство; на фиг. 3 - стади возведени крепи из тросов; на фиг.4стади поддержани магазина в камере на тросах. Подготовка выемочного участка включает проведение параллельного 1 , транспортного 2 и ходового 3 параллельного штреков (см. фиг. 1). В ка .честве вентил ционной вьфаботки служит ходовой штрек отработанного верхнего этажа. Подготовку днища каждой полосы начинают с проведени ниш 4 и 5 на транспортном и параллельном штреках, которыми подсекают ее на всю мощность пласта - до пород почвы и кровли. На параллельном штреке 3 провод т нишу , в которой размещают лебедки 6. В днище располагают верхн ки 7 и 8. К верхн ку 8 жестко закрепл ют концы тросов 9, верхн к 7 содержит р д убирающихс стопоров дл удержани тросов 9 в нат нутом положении. Целик между нишами 4 и 5 разрушают , тем самым, образуют компенсационное пространство 10, кровлю которого креп т анкерами. Тросы 9 свободно располагают на бортах и днище компенсационного пространства 10. Отбойку полезного ископаемого производ т взрьшанием дпинных скважин на компенсационное пространство 10 с образованием полосы замагазинированного полезного ископаемого 11 (см. фиг. 2). После этого канатами от лебедок 6 закрепл ют тросы 9, производ т их поочередное нат жение и закрепл ют на стопор верхн ка 7 (см. фиг. 3), при этом тросы по одному прорезают насьть полезного ископаемого в компенсационном пространстве 10. Совокупность нат нутых тросов создает по контуру днища внутри магазина перекрытие 12. По окончании нат жени всех тросов удал ют полезное ископаемое из пространства 10, при этом перекрытие 12 провисает, удержива магазин 11 за счет уплотнени полезного ископаемого и подбучивани промежутков между тросами крупными фракци ми (см.фиг.4).The invention relates to mountain dapu n intended for underground mining of steepleopadago (their mineral deposits). A method of mining ore deposits is known, which includes carrying out the cutting of mines, fixing this operation with reinforced concrete lining the block reserves, discharging ore through hatch lining windows and dismounting the tubing lining CL. of the known method, the cost of the bale-outings is considerable and the laboriousness of the erection and dismantling of the lining is high, as well as the loss of the permutation of the lining. The technical essence and the achieved result is the method of preparation and development of steeply dipping seams of minerals, including carrying out transport development in the bottom of the excavation site, cutting the excavation site, drilling and blasting skrazhin, blasting mineral reserves in vertical stripes, useful fossil and release it under the protection of overlap 2. The disadvantage of this method is the loss of ore associated with the formation of stagnant zones during its release. The purpose of the invention is to reduce the loss of minerals. The goal is achieved by the fact that according to the method of preparing and developing steeply dipping layers of mineral resources, including carrying out transport development in the bottom of the excavation site, cutting the excavation site, drilling and blasting wells, breaking down mineral reserves in vertical stripes, storing mineral resources and placing it under overlap protection; parallel transport is carried out above the transport output; cutting of each strip is carried out by carrying out transport and parallel niches At the full thickness of the reservoir, between the destitute, a compensatory space is formed, the cables and the bottom of which lay cables, the strip strip is crushed into the specified compensation space, overlapping which is the forward route from alternating tension, and after the mineral is released from the compensatory the spaces transfer the mineral fossil in the broken strip to it by moving the support cables to the bottom of the compensation space. FIG. 1 shows the initial stage of preparation of the bottom of the chamber; in fig. 2 - the stage of release of minerals from the chamber into the compensation space; in fig. 3 - stages of the construction of lining of cables; Figure 4 shows the maintenance of the store in the cable box. Preparation of the excavation site includes carrying out parallel 1, transport 2 and running 3 parallel drifts (see Fig. 1). As a ventilation installation, there is a running track of the spent upper floor. The preparation of the bottom of each strip begins with the holding of niches 4 and 5 on the transport and parallel drifts, which cut it to the full thickness of the reservoir - up to the rocks of the soil and roof. On the parallel gateway 3, a niche is placed in which the winches 6 are placed. Tops 7 and 8 are placed in the bottom. The ends of the cables 9 are firmly fixed to the top 8, the top to 7 contains a row of retractable stoppers to hold the cables 9 in the tensioned position . The rear sight between niches 4 and 5 is destroyed, thereby forming a compensation space 10, the roof of which is secured with anchors. Cables 9 are freely positioned on the sides and the bottom of the compensation space 10. Mineral fossilization is carried out by crushing dpinnyh wells into the compensation space 10 to form a strip of a gasified mineral mineral 11 (see Fig. 2). After that, ropes from winches 6 secure the cables 9, alternately tension them and fix the top 7 to the stopper (see Fig. 3), with the cables cutting through the mineral in the compensation space 10 one by one. the cables create an overlap along the contour of the bottom inside the magazine. After all the cables are tensioned, the mineral is removed from space 10, while the overlap 12 sags while holding the shop 11 by compacting the mineral and tucking the gaps between the cables GOVERNMENTAL fractions (sm.fig.4).
31123112
После удллсмш полезного ископаемого из-под перекрыти 12 одновремен но убирают стопоры на верхн ке 7, при этом тросы под действием массы полезного ископаемого опускаютс , и разрушенна горна масса заполн ет пространство 10 (см. фиг. 2). Затем вновь осуществл ют поочередное нат жение тросов 9 лебедками 6, и цикл . повтор ют вплоть до полной выемки полезного ископаемого из полосы .After the mineral has been removed from under the overlap 12, the stoppers on the top 7 are simultaneously removed, while the cables are lowered by the action of the mass of the mineral and the destroyed rock mass fills space 10 (see Fig. 2). Then the alternate tensioning of the cables 9 by the winches 6 and the cycle are again carried out. repeat until the mineral has been completely removed from the strip.
1439414394
Использование изoбpeтt:ни позвол ет совместить выпуск полезного ископаемого с закладкой полосы с в тил ционного горизонта, т.е. вести выJ пуск с перепуском пород закладки. Камерные системы разработки с минимальными потер ми полезного ископаемого и закладкой выработанного пространства позвол ют вовлечь в отработ 0 КУ законсервированные участки ,в том числе на пластах.склонных к самовозгоранию и обеспечить высокую нагрузку на забой.Use of the invention: it does not allow to combine the production of mineral resources with the laying of a strip with a tilting horizon, i.e. to conduct a release with a bypass of bookmark rocks. Chamber development systems with minimal losses of minerals and laying of the worked-out space make it possible to engage in the preserved areas of the KU 0, including on seams inclined to spontaneous combustion and to ensure a high load on the face.
АBUT
иг.Чig.ch
hrhr
11eleven
Фиг,1Fig, 1
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833641711A SU1121439A1 (en) | 1983-09-14 | 1983-09-14 | Method of preparing and mining steep mineral beds |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833641711A SU1121439A1 (en) | 1983-09-14 | 1983-09-14 | Method of preparing and mining steep mineral beds |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1121439A1 true SU1121439A1 (en) | 1984-10-30 |
Family
ID=21081556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833641711A SU1121439A1 (en) | 1983-09-14 | 1983-09-14 | Method of preparing and mining steep mineral beds |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1121439A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117386367A (en) * | 2023-10-23 | 2024-01-12 | 中国矿业大学 | Fully-mechanized mining method for multi-filling long walls of left strip coal pillar |
-
1983
- 1983-09-14 SU SU833641711A patent/SU1121439A1/en active
Non-Patent Citations (1)
Title |
---|
1. Авторское свидетельство СССР № 90603, кл. Е 21 с41/06, 1949. 2. Авторское свидетельство СССР № 270653, кл. Е 21 С 41/06, 1967 (прототип). * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117386367A (en) * | 2023-10-23 | 2024-01-12 | 中国矿业大学 | Fully-mechanized mining method for multi-filling long walls of left strip coal pillar |
CN117386367B (en) * | 2023-10-23 | 2024-05-31 | 中国矿业大学 | Fully-mechanized mining method for multi-filling long walls of left strip coal pillar |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4799738A (en) | Mining method for working large-scale mineral deposits by the caving system | |
SU1121439A1 (en) | Method of preparing and mining steep mineral beds | |
US4216998A (en) | Method of underground mining by pillar extraction | |
RU2246618C1 (en) | Method for controlling hard-destructible ceiling | |
RU2168628C1 (en) | Method of mining of stratified deposits | |
RU2030581C1 (en) | Method for combined mining of thick ore bodies | |
US2896929A (en) | Method of driving rock excavations | |
RU2827324C1 (en) | Method of driving paired workings on thin flat coal beds with leaving rock in mine | |
SU1384755A1 (en) | Method of mining gently-sloping and sloping ore bodies | |
RU2471990C1 (en) | Method to mine sloping and inclined coal beds of average capacity | |
SU1028847A1 (en) | Method of mining thick ore deposits | |
SU825964A1 (en) | Method of working thick steeply-inclined ore bodies | |
Gajos et al. | Experience and practical aspects of utilizing a shrinkage method of extraction at “Kazimierz-Juliusz” coal mine in Sosnowiec | |
Andres | The evolution of pillar mining at the Polaris Mine | |
RU2320872C2 (en) | Method for steeply-inclined low- and medium-thickness coal seam development | |
SU703662A2 (en) | Method of preparing ore deposits to stoping | |
SU1737118A1 (en) | Mining method for steep deposits | |
SU1608345A1 (en) | Method of mining mineral deposits | |
RU2086765C1 (en) | Method of preparing to mining flat-lying coal seam | |
SU848661A1 (en) | Flexible roof | |
RU2164293C2 (en) | Process of working of coal seams | |
SU866193A1 (en) | Method of working thick sloping coal seams | |
RU2013548C1 (en) | Method for mining mineral deposits at large depth | |
RU2069266C1 (en) | Method for development of coal seams | |
SU1546639A1 (en) | Method of mining mineral deposits |