SU109819A1 - Combined method of developing a powerful coal steeply dipping seam with two inclined layers - Google Patents

Combined method of developing a powerful coal steeply dipping seam with two inclined layers

Info

Publication number
SU109819A1
SU109819A1 SU551929A SU551929A SU109819A1 SU 109819 A1 SU109819 A1 SU 109819A1 SU 551929 A SU551929 A SU 551929A SU 551929 A SU551929 A SU 551929A SU 109819 A1 SU109819 A1 SU 109819A1
Authority
SU
USSR - Soviet Union
Prior art keywords
developing
combined method
steeply dipping
inclined layers
coal
Prior art date
Application number
SU551929A
Other languages
Russian (ru)
Inventor
С.И. Дмитриев
А.Ф. Уваров
Original Assignee
С.И. Дмитриев
А.Ф. Уваров
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by С.И. Дмитриев, А.Ф. Уваров filed Critical С.И. Дмитриев
Priority to SU551929A priority Critical patent/SU109819A1/en
Application granted granted Critical
Publication of SU109819A1 publication Critical patent/SU109819A1/en

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

Способы разработки мощных угольных крутопадающих пластов двум  наклонными сло ми с применением гибкого металлического перекрыти ,  вл ющегос  средством разделени  обрушенных или закладочных пород от угл  нижнего сло , известны.Methods for developing heavy coal steeply dipping layers by two inclined layers using flexible metal overlap, which is a means of separating the collapsed or backfill from the coal of the lower layer, are known.

Особенностью описываемого способа разработки могпных крутопадающих пластов  вл етс  выемка монтажной П1,ели у вис щего бока пласта, осуп1ествл ема  сдвоенным баром врубовой машины или струговым агрегатом. Высота монтажной щели равна 0,3 м: Крепление подэтажных и промежуточных штреков у вис щего бока пласта производитс  специальной металлическо крепью.A special feature of the described method of developing grape-type steeply dipping seams is the recess of the mounting P1, spruce at the hanging side of the reservoir, located on the double bar of the cutting machine or plow unit. The height of the mounting gap is 0.3 m: The sublevel and intermediate drifts at the hanging side of the reservoir are fastened with a special metal support.

На фиг. 1 изображен разрез по АА на фиг. 3; на фиг. 2-разрез по ББ на фиг. I; на фиг. 3- разрез по ВВ на фиг. 1.FIG. 1 shows a section along AA in FIG. 3; in fig. 2-section along BB in FIG. I; in fig. 3 is a section along the explosive in FIG. one.

Крець / состоит из аркообразного верхн ка, одной стойки и анкерного болта 2. Укладка гибкого металлического перекрыти  в монтажHoii П1,е.1и 3 производитс  механизированным способом с ПОМОП1,ЬЮ специального станка 4.Kretz / consists of an arcuate top, one rack and an anchor bolt 2. The installation of a flexible metal ceiling in the installation of Hoii P1, e.1 and 3 is carried out in a mechanized way with POMOP1, U of a special machine 4.

Предмет изобретени Subject invention

Комбинированны способ разработки ,Horo угольного крутопада 0 1 ,его пласта двум  наклонными сло ми, с выемкой верхнего сло  у вис чего бока пласта лавой, с последую 1,им разделение. обрущенн х или закладочных пород от угл  нижнего сло  гибким металлическим терекрытием, отлич а ю , и и с   тем, что, с целью механизации выемки верхнего монтажного сло , осу,ествл ют у вис щего бока пласта выемку сдвоенным баром врубовой мащины или струговым агрегатом монтажной щ&.ш высотой около 0,3 м с установкой 1 олуарочной крепи и последуюпхей укладкой гибкогоThe method of working out is combined, Horo coal steepness 0 1, its reservoir with two inclined layers, with a notch of the upper layer hanging from the side of the reservoir with lava, followed by 1, and their separation. The collapsed or backfilling rocks from the bottom of the bottom layer with a flexible metal terekryty, different, and with the fact that, in order to mechanize the excavation of the upper mounting layer, the core was installed at the hanging side of the reservoir u & выс height of about 0.3 m with installation of 1 luarochnoy lining and subsequent laying of flexible

переплетеперекрыти  из лент с нием их в peiHCTKy. Разрез по RR 5cover with ribbons with them in peiHCTKy. RR 5 cross section

Фиг. 1 FIG. one

5U5U

Фмг. 2Fmg 2

Разрез по 8888 section

.зpEз по Bi}  .zpEz on Bi}

Фиг. 3FIG. 3

SU551929A 1956-04-09 1956-04-09 Combined method of developing a powerful coal steeply dipping seam with two inclined layers SU109819A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU551929A SU109819A1 (en) 1956-04-09 1956-04-09 Combined method of developing a powerful coal steeply dipping seam with two inclined layers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU551929A SU109819A1 (en) 1956-04-09 1956-04-09 Combined method of developing a powerful coal steeply dipping seam with two inclined layers

Publications (1)

Publication Number Publication Date
SU109819A1 true SU109819A1 (en) 1956-11-30

Family

ID=48382815

Family Applications (1)

Application Number Title Priority Date Filing Date
SU551929A SU109819A1 (en) 1956-04-09 1956-04-09 Combined method of developing a powerful coal steeply dipping seam with two inclined layers

Country Status (1)

Country Link
SU (1) SU109819A1 (en)

Similar Documents

Publication Publication Date Title
SU109819A1 (en) Combined method of developing a powerful coal steeply dipping seam with two inclined layers
US4216998A (en) Method of underground mining by pillar extraction
SU391275A1 (en) SECTION OF MECHANIZED STRIPS
SU134649A1 (en) The method of excavation of coal under a flexible metal ceiling
SU71696A1 (en) The way to develop cleansing faces
SU612041A1 (en) Anchor roof support grip
SU899953A1 (en) Method of mining thick sloping coal beds in horizontal layers
SU143761A1 (en) The system for the development of heavy coal seams with pillars in the fall
SU693017A1 (en) Method of mining mineral deposits
SU875044A1 (en) Method of working thick mineral deposits
SU114049A1 (en) Method of mechanized development of thin gently dipping layers by long pillars for the uprising
SU125787A1 (en) Method for developing thin and low-powered steeply dipping seams
SU1684511A1 (en) Method for protecting seam working
SU95492A1 (en) Development system of high-grade steeply dipping seams with horizontal layers
SU732533A1 (en) Method for mining ore deposits
SU121410A1 (en) Complete metal lining
SU117733A1 (en) The way to develop powerful flat and inclined falling seams
SU827790A1 (en) Method of working thick gently sloping mineral deposits
SU520442A1 (en) The method of extraction of very thin steeply dipping veins
SU640030A1 (en) Method of opening and developing slightly inclined and inclined seams of minerals
SU825961A1 (en) Method of working thick coal seams
SU1707200A1 (en) Method of mining flat stratified deposits
SU564422A1 (en) Method for mining thick gently sloping beds
SU691565A1 (en) Method for the open mining of steep formations of minerals
SU114578A1 (en) Dual bessektsionny shield with advanced protective lining for the development of powerful steeply dipping seams with jetting machines