SU1096325A1 - Structure for reinforcement and expansion of steel/ferroconcrete bridge span construction - Google Patents

Structure for reinforcement and expansion of steel/ferroconcrete bridge span construction Download PDF

Info

Publication number
SU1096325A1
SU1096325A1 SU823453538A SU3453538A SU1096325A1 SU 1096325 A1 SU1096325 A1 SU 1096325A1 SU 823453538 A SU823453538 A SU 823453538A SU 3453538 A SU3453538 A SU 3453538A SU 1096325 A1 SU1096325 A1 SU 1096325A1
Authority
SU
USSR - Soviet Union
Prior art keywords
existing
main beams
span
reinforcement
broadening
Prior art date
Application number
SU823453538A
Other languages
Russian (ru)
Inventor
Константин Хрисанфович Толмачев
Владимир Иванович Пузиков
Original Assignee
Сибирский Ордена Трудового Красного Знамени Автомобильно-Дорожный Институт Им.В.В.Куйбышева
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Сибирский Ордена Трудового Красного Знамени Автомобильно-Дорожный Институт Им.В.В.Куйбышева filed Critical Сибирский Ордена Трудового Красного Знамени Автомобильно-Дорожный Институт Им.В.В.Куйбышева
Priority to SU823453538A priority Critical patent/SU1096325A1/en
Application granted granted Critical
Publication of SU1096325A1 publication Critical patent/SU1096325A1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

КОНСТРУКЦИЯ УСИЛЕНИЯ И УШИ НИЯ СТАЛЕЖЕЛЕЗОБЕТОННОГО ПРОЛЕТ ЮГО СТРОЕНВД МОСТА, включающа  металлические главные балки с горизонтальн ми листовыми по сами, соединенные с главными балками существующего пролетного строени  посредством поперечных св зей, и железобетонные элeмe ты плиты проезжей части, жестко закрепленные на главных балках конструкции . усилени  и объединенные с плитой проезжей части существующего пролетного строени , отличающа с  тем, что, с целью сниже})и  металлоемкости конструкции за счет использовани  опор существующего моста без кх уширени , металлические главные Палки конструкции усилени  и уширени  установлены наклонно снаружи су цествующего пролетного строени  с размещением нижних их по сов под нижними по сами смежных с ними главных балок существующего пролетного строени  и взаимным их соединением в надопорных участках. . 1CONSTRUCTION AND PAINTS EARS Nia stalezhelezobetonnyh SPAN STROENVD BRIDGE SOUTH, comprising a metal main beams with horizontal mi leaf on themselves connected to main beams existing Spans by crosslinking, and reinforced eleme you roadway slabs which have been fixed on the main beams structure. reinforcement and combined with the plate of the carriageway of the existing span, characterized in that, in order to lower}) and the metal structure due to the use of supports of the existing bridge without broadening, the metal main Stick of the reinforcement and broadening structure are inclined outside the existing span with by placing their lower ones under the lower ones along the adjacent main beams of the existing span structure and their mutual connection in supra-supporting sections. . one

Description

1 Нзобрстенне относитс  к мостостро нию и может быть испольчовано при конструкции балочных сталежелезобето Hbtx пролетных строений мостов. Известна конструкци  усилени  и уширени  сталежелезобетонного пролет ного строени  моста, включающа  дополнительные консольные блоки железо бетонной плигы проезжей части, систе му наклонных по фасаду моста подкосо поддерживающих дополнительные блоки плиты и систему крестообразных поперечных и горизонтальных св зей, обеспечивающих геометрическую неизмен емость конструкции усилени  и уш рени  на стадии монтажа и эксплуатации 1 . Недостатками известной конструкци  вл ютс  повышенна  ее материалоемкость и значительные сроки реконструкции сооружени . Наиболее близким к предлагаемому по технической сущности и достигаемо му эффекту  вл етс  конструкци  усилени  и уширени  сталежелез.обетонного пролетного строени  моста, включающа  металлические главные балки с горизонтальными листовыми по сами, соединенные с главными балками существующего пролетного строени  посредством поперечных св зей, и железобетонные элементы плиты проезжей части, жестко закрепленные на главных балках конструкции усилени  и объединенные с плитой проезжей части существующего пролетного строени  С Однако данна  конструкци  характеризуетс  повышенной материалоемкостью ввиду необходимости уширени  опор существующего моста, поскольку металлические главные балки конструк ции усилени  и ушнрени  расположены в вертикальных плоскост х параллельн существующим главным балкам. Цель изобретени  - снижение материалоемкости конструкции за счет использовани  опор су111еству1още1о моста без их уширени . Указанна  цель достигаетс  тем, что в конструкции усилени  и уШИреНИН сталежелезобетонного пролетного строени Моста, включающей металлические главные балки с горизонтальны ми листовьми по сами, соединенные с главньпу(и балками существующего проле ного строени  посредством поперечных св зей, и железобетонные элементы ллиты проозжей члсти, жестко закреплрнныр ч  тл инмх балках ксжструкнни 252 усилени  и объединенные с плитой проезжей части суа1ествующего пролётного строени , металлические главные балки конструкции усилени  и уширени  установлены наклонно снаружи существующего пролетного строени  с размещением нижних их по сов под Н11ЖНИМИ по сами смежных с ними главных балок сущестБую цего пролетного строени  и взаимным их соединением в надопорных участках. На фиг. 1 изображена схема поперечного сечени  пролетного строени  до уширени , на фиг. 2 - поперечное сечение пролетного строени  в середине пролета после уширени , на фиг. 3 поперечное сечение пролетного строени  на опоре после уитрени , на фиг. 4 - конструкци  шва объединени  существующей плиты с дополнительными консольными блоками железобетонной плиты проезжей части. Ушир емое пролетное строение представл ет собой балочную конструкцию и содержит металлические главные балки с вертикальными стенками 1, верхним 2 и нижним 3 горизонтальными по сами , систему продольных горизонтальных 4 и поперечных 5 св зей, сборную из блоков железобетонную плиту 6 проезжей части, включенную в совместную на изгиб работу с главньгми балками, ,Тп  уменьшени  сечени  плиты 6 последн   посередине пролета между главными балками установлена на вспомогательную продольную балку 7, опертую на поперечные св зи 5, Конструкци  усилени  и уширени  включает дополнительные металлические главные балки 8, установленные наклонно снаружи существуюи(его пролетного строени  и опертые на существующие опорные части 9. Дополнительные балки 8 -Выполнены с горизонтальными верхним 10 и нижним 11 по сами, причем нижние по са 11 дополнительных балок заведены под нижние по са 3 существующих главных балок с взаимным их объединением в надопорных, участках пролетного строени . По длине нижние по са 3 и 11 существующих и дополнительных главных балок не контактируют между собой. Верхние по са 10 дополнительных наклон 1ых главных б -пок объединены с железобетонными элементами 12 уширени  плиты тгро(зжей части 6, 3 Объединеиио жп(| зоОетоиных элемен тов 12 с плитой 6 осуществл етс  следующим обраг ом. Выпуски 13 железобетонной плиты 6 объедин ют посредством сварки с выпусками арматуры 14 смонтированного железобетонного элемента 12, укладывают стержни арматуры 15 и производ т бетонирование стыка 16. Устойчивость положени  наклонных балок 8 обеспечиваетс  постановкой св зей 17 в плоскост х расположени  существующих поперечных св зей 5, усиливаемых с учетом дополнительньк усилий, возникающих при загружении наклонных балок 8. Б опорных сечени  пролетного строени  устанавливают диафрагмы 18 дл  обеспечени  передачи опорного давлени  на су1че.етвую1цие опорные части 9. 54 Усиленна  и уширенна  конструкци  сталежелезобетонного пролетного строе НИН работает следующим образом. Расчетный изгибающий момент воспринимаетс  как металлической, так и объединенной с ней железобетонной част ми с учетом наличи  конструкции усилени , т.е. наклонных балок 8 и железобетонных элементов 12. При этом наружные наклонные балки 8 улучшают работу пролетного строени  на кручение и воспри тие ветровых нагрузок. Применение предлагаемой конструкции усилени  и уширени  сталежеотсезобетонных пролетных строений обеспечивает выполнение поставленной задачи без уширени  существующих опор моста.1 Nzobrstenne refers to the bridge building and can be used in the construction of the beam structure of the reinforced concrete unit Hbtx bridge span structures. The construction of reinforcement and broadening of the steel concrete span of the bridge is known, including additional cantilever blocks of the concrete roadway iron, a system of oblique supporting additional blocks of the slab and a system of cross-shaped transverse and horizontal links inclined along the facade of the bridge, and a system of cross-shaped transverse and horizontal links providing the geometric constant of the reinforcement structure and ear at the stage of installation and operation 1. The disadvantages of the known construction are its increased consumption of materials and considerable time for the reconstruction of the structure. The closest to the proposed technical essence and the achieved effect is the construction of reinforcement and broadening of the steel slab. The concrete span of the bridge, including metal main beams with horizontal sheet itself, connected to the main beams of the existing span by means of cross-links, and reinforced concrete elements of the slab the roadway, rigidly fixed on the main beams of the reinforcement structure and combined with the plate of the roadway of the existing span C This structure is characterized by increased material consumption because of the need existing bridge supports broadening is, since the main metal beam constructions gain ushnreni tion and placed in vertical planes parallel to the existing main beams. The purpose of the invention is to reduce the material consumption of the structure by using the supports of the strength of the bridge without their broadening. This goal is achieved by the fact that in the construction of reinforcement and extension of the Bridge concrete structure, including metal main beams with horizontal sheets, connected to the main structure (and cross-section beams of the existing structure by means of cross-links), and the reinforced concrete elements of the bridge are rigid. fixed reinforcing beams with 252 reinforcement beams and 252 reinforced with the slab of the roadway of a continuous span, metal main reinforcement beams of reinforcement construction and wider They are installed obliquely outside the existing span, with their lower location located below the NJEHNI on the adjacent main beams themselves, which are essentially a span structure and their interconnection in the supra-support sections.Fig. 1 shows a cross-sectional diagram of the span before broadening, FIG. 2 is a cross-section of the span in the middle of the span after broadening, in Fig. 3, the cross-section of the span on the support after the tremor, in fig. 4 shows a seam construction for combining an existing slab with additional cantilever blocks of a concrete slab of a roadway. The broadened span is a beam structure and contains metal main beams with vertical walls 1, upper 2 and lower 3 horizontal by themselves, a system of longitudinal horizontal 4 and transverse 5 links, a prefabricated block of reinforced concrete slab 6 of the carriageway, included in the joint for bending work with the main beams,, Tp of reducing the cross section of the plate 6 last in the middle of the span between the main beams is mounted on an auxiliary longitudinal beam 7 supported on cross-links 5 of laziness and broadening includes additional metal main beams 8 that are installed obliquely outside the existing (its span and supported on existing supporting parts 9. Additional beams 8 are made with horizontal upper 10 and lower 11 by themselves, and lower 11 additional beams are inserted under lower along the ca 3 existing main beams with their mutual association in supra-support, sections of the superstructure.Long along the length the lower along ca 3 and 11 of the existing and additional main beams do not contact each other. The top 10 additional slopes of the 1st main b-pads are combined with reinforced concrete elements 12 plate broadening harsh (part 6, 3 Combining (platelet elements 12 with plate 6) are processed as follows. Releases 13 of reinforced concrete plate 6 are combined welding with valve outlets 14 of mounted reinforced concrete element 12, rebar rods 15 are laid and concreting of joint 16 is performed. The position stability of inclined beams 8 is ensured by placing connections 17 in the planes of the location of existing crosspoints ties 5, reinforced with regard to the additional forces that occur when loading the inclined beams 8. The supporting sections of the span structure are installed in diaphragms 18 to ensure the transfer of the reference pressure to the joint support NIN. 9 54 The calculated bending moment is perceived by both the metal and the reinforced concrete parts combined with it, taking into account the presence of the reinforcement structure, i.e. inclined beams 8 and reinforced concrete elements 12. At the same time, external inclined beams 8 improve the torsion span construction and the perception of wind loads. The application of the proposed construction of reinforcement and expansion of steel-reinforced concrete spans ensures that the task is accomplished without broadening the existing bridge supports.

j2 Г5 5 Г6 6j2 G5 5 G6 6

. .::C T7: ffiv;... . :: C T7: ffiv; ..

Фаг. J Phage. J

Claims (1)

КОНСТРУКЦИЯ УСИЛЕНИЯ И У1ИИРЕ НИЯ СТАЛЕЖЕЛЕЗОБЕТОННОГО ПРОЛЕТНОГО СТРОЕНИЯ МОСТА, включающая металлические главные балки с горизонтальными листовыми поясами, соединенные сSTRENGTHENING AND STRUCTURE STRUCTURE OF BRIDGE STEEL AND CONCRETE STRUCTURE, including metal main beams with horizontal sheet belts connected to Не-------------------главными балками существующего пролетного строения посредством поперечных связей, и железобетонные элементы плиты проезжей части, жестко закрепленные на главных балках конструкции усиления и объединенные с плитой проезжей части существующего пролетного строения, отличающаяся тем, что, с целью снижения металлоемкости конструкции за счет использования опор существующего моста без их уширения, металлические главные балки конструкции усиления и уширения установлены наклонно снаружи существующего пролетного строения с размещением нижних их поясов под нижними поясами смежных с ними главных балок существующего пролетного строения и взаимным их соединением в надопорных участках.Not ------------------- the main beams of the existing span through cross-connections, and the reinforced concrete elements of the carriageway slab, rigidly fixed to the main beams of the reinforcement structure and combined with the slab of the carriageway of the existing span structure, characterized in that, in order to reduce the metal consumption of the structure by using the supports of the existing bridge without broadening, the metal main beams of the reinforcement and broadening structure are installed obliquely outside the existing span with times by placing their lower belts under the lower belts of the main beams of the existing span adjacent to them and interconnecting them in the supporting sections. SU <„,1096325 фиг. 1SU <„, 1096325 of FIG. 1
SU823453538A 1982-06-17 1982-06-17 Structure for reinforcement and expansion of steel/ferroconcrete bridge span construction SU1096325A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823453538A SU1096325A1 (en) 1982-06-17 1982-06-17 Structure for reinforcement and expansion of steel/ferroconcrete bridge span construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823453538A SU1096325A1 (en) 1982-06-17 1982-06-17 Structure for reinforcement and expansion of steel/ferroconcrete bridge span construction

Publications (1)

Publication Number Publication Date
SU1096325A1 true SU1096325A1 (en) 1984-06-07

Family

ID=21016862

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823453538A SU1096325A1 (en) 1982-06-17 1982-06-17 Structure for reinforcement and expansion of steel/ferroconcrete bridge span construction

Country Status (1)

Country Link
SU (1) SU1096325A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2476637C1 (en) * 2011-06-29 2013-02-27 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Reinforcing structure of pier table of arched bridge span
CN113512930A (en) * 2021-07-05 2021-10-19 山西省交通科技研发有限公司 Transverse reinforcing structure and construction method for assembled small box girder

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1, Экспресс-информаци . Искусственные сооружени на автомобильны дорогах. М., ВИНИТИ, N 34, 1969, с. 9-13. 2. Протасов К.Г. и др. Металличе кие мосты. М., Транспорт, 1973, с. 81-82, рис. 87а. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2476637C1 (en) * 2011-06-29 2013-02-27 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Reinforcing structure of pier table of arched bridge span
CN113512930A (en) * 2021-07-05 2021-10-19 山西省交通科技研发有限公司 Transverse reinforcing structure and construction method for assembled small box girder

Similar Documents

Publication Publication Date Title
KR100536489B1 (en) Manufacturing method for prestressed steel composite girder and prestressed steel composite girder thereby
EP3325721B1 (en) Structural system for arch bridges, with mobilization of external reactions through definitive ties
CN101230607B (en) Structure combination parts for hollow slab
CN105064200A (en) Prestressed ferroconcrete combined simply-supported beam bridge with preprocessed assembled fish-bellied truss frame and construction method of prestressed ferroconcrete combined simply-supported beam bridge
KR100483083B1 (en) Composite Deck having Frame and Concrete
KR101693256B1 (en) Construction method of prefabricated psc bridge
RU160846U1 (en) PRELIMINARY-TENSIONED REINFORCED-MONOLITHIC REINFORCED CONCRETE PLATE OF THE ROADWAY OF THE UNRACKED STEEL-REINFORCED CONCRETE BRIDGE
US3367074A (en) Method for erecting prefabricated bridges of concrete, and bridge erected by said method
CN101230659A (en) Force-bearing type underplate component
SU1096325A1 (en) Structure for reinforcement and expansion of steel/ferroconcrete bridge span construction
CN216338993U (en) Longitudinal joint for steel-UHPC (ultra high performance concrete) assembled pi-shaped combination beam
KR100546719B1 (en) Prestressed steel composite girder
KR102325276B1 (en) Half Precast Concrete continuous slab and construction method of the same
CN113123462B (en) Large-span prestressed concrete assembled frame connecting node and construction method
PL128494B1 (en) Ceiling,in particular for dwelling houses and method of making the same
CN101230668A (en) Force-bearing type underplate component
CN112227580A (en) Steel pipe truss prestressed hollow superimposed sheet
KR102033052B1 (en) Method for constructing truss bridge support with infilled tube using src girder
CN208072704U (en) Steel bar connect Shear-wall Connecting Beam Used structure with connector
JP2004011300A (en) Pc composite structure, pc bridge and prestressing method
CN101230671A (en) Force-bearing type template component
CN212453311U (en) Full-prefabricated prestressed plate and plate-to-plate, plate-side and plate-end connecting structure thereof
KR102415136B1 (en) Optimized two-way precast concrete block slab
CN211714178U (en) Prefabricated reinforced concrete house frame
KR102563620B1 (en) Half Precast Concrete continuous slab and construction method of the same